Professional Documents
Culture Documents
Penurunan Total Akibat Beban 5 Tumpuk Container 20 FT
Penurunan Total Akibat Beban 5 Tumpuk Container 20 FT
Jarak PVD D a b Dw
n = D/Dw F(n)
(m) (mm) (mm) (mm) (mm)
0.8 840 98 2.5 63.98 13.1291028 1.82483136
1 1050 98 2.5 63.98 16.4113786 2.04797491
1.25 1312.5 98 2.5 63.98 20.5142232 2.27111846
1.5 1575 98 2.5 63.98 24.6170678 2.45344002
1.75 1837.5 98 2.5 63.98 28.7199125 2.6075907
Diasusikan tipe Prefabricated Vertical Drain (PVD) yang digunakan adalah tipe Mebra
Keterangan : D = Diameter equivalen tanah yang menjadi daerah pengaruh PVD
1.05 x S untuk pola pemasangan segitiga
Dw = diameter equivalen dari vertical drain
a = Panjang Band Shaped PVD
b = Lebar Band Shaped PVD
n = rasio jarak
F(n) = faktor hambatan akibat jarak PVD
Estimation of kv :
Cc = Δe / log σ'z2-logσ'z1
Δe = Cc (logσ'z2-logσ'z1)
αv = Δe / σ'z2-σ'z1
= Cc (logσ'z2-logσ'z1)/'z2-σ'z1 /kPa
mv = αv / 1+e0 /kPa
kv = cv ɣw mv m/s
kr = 2.5 kv m/s
Tebal
z Cv ɣw αv mv kv
No Lapisan e Cc
m m m2/s kN/m3 / kPa / kPa m/s
1 2 3 4 5 6 7 8 9
1 1 0.5 1.196 0.46 4.7E-08 9.8 0.001385 0.000631 0.0000000
2 0.5 1.25 1.196 0.46 4.7E-08 9.8 0.001385 0.000631 0.0000000
3 1.5 2.25 1.101 0.41 6.2E-08 9.8 0.001234 0.000587 0.0000000
4 0.5 3.25 1.101 0.41 6.2E-08 9.8 0.001234 0.000587 0.0000000
5 1.5 4.25 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
6 0.5 5.25 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
7 1.5 6.25 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
8 1 7.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
9 1 8.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
10 1 9.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
11 1 10.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
12 1 11.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
13 1 12.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
14 1 13.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
15 1 14.5 1.813 0.94 3.4E-08 9.8 0.00283 0.001006 0.0000000
604800
kr Ch
ch rata2 0.05967360
Tebal Faktor Pengaruh
z Y' P' Pc' q
No Lapisan e Cc B L
m n m² n² I
m m t/m³ t/m² t/m² t/m² m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16
1 1 0.5 1.196 0.46 1.723 2.69 18.5 8.1 2.438 6.058 4.876 12.116 23.77538 146.7975 0.25
2 0.5 1.25 1.196 0.46 1.723 2.69 18.5 8.1 2.438 6.058 1.9504 4.8464 3.80406 23.48759 0.24
3 1.5 2.25 1.101 0.41 1.754 6.45 17.2 8.1 2.438 6.058 1.083556 2.692444 1.174093 7.249257 0.205
4 0.5 3.25 1.101 0.41 1.754 6.45 17.2 8.1 2.438 6.058 0.750154 1.864 0.562731 3.474496 0.17
5 1.5 4.25 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.573647 1.425412 0.329071 2.031799 0.167
6 0.5 5.25 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.464381 1.153905 0.21565 1.331496 0.1225
7 1.5 6.25 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.39008 0.96928 0.152162 0.939504 0.121
8 1 7.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.325067 0.807733 0.105668 0.652433 0.075
9 1 8.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.286824 0.712706 0.082268 0.50795 0.07
10 1 9.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.256632 0.637684 0.06586 0.406641 0.065
11 1 10.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.23219 0.576952 0.053912 0.332874 0.0475
12 1 11.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.212 0.526783 0.044944 0.2775 0.04
13 1 12.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.19504 0.48464 0.038041 0.234876 0.0375
14 1 13.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.180593 0.448741 0.032614 0.201368 0.035
15 1 14.5 1.813 0.94 1.537 8.98 14.4 8.1 2.438 6.058 0.168138 0.417793 0.02827 0.174551 0.025
Perhitungan derajat konsolidasi akibat pemasangan PVD Pola Segitiga jarak 0.8 m