supervisor:- MAHMOUD / Foreman :- HOM

Date 18/9/2019 Level 0/ Zone6 to 8 Manpower-


S.No work Activity Qty Mtr Remarks
First Fix
1 G.I Conducit 55 Mtr
2 Normal Light Point 3 Point
3 Emergency Light Point 2 Point
4 Dali point 2 Point
5 exit light points 2 points
5 Small Power Point 8 Point
Total SPL 17 Points
6 ICT Point 3 Point
7 Fire Point 2 Point
8 BMS Point 5 Point
9 fir run hom 3 Point
10 sansur 5 Point
Total ELV 18 points
Second Fix
1 wire-1.5 SQ.mm Mtr
2 wire-2.5 SQ.mm 700 Mtr
3 wire-4.0 SQ.mm 1250 Mtr
4 wire-6.0 SQ.mm Mtr
5 Normal light Point 5 6 db droo
6 Emergency Light Point 3 omran
7 Dali Point 11 omran
8 exit light points 3 omran
8 Small Power Ponit 5 points
Contaiment
1 Trunking Mtr
2 Ladder Mtr
3 Tray 18 Mtr
DB Installation
1 D.B Installation Nos
2 single socket fixing 5 Nos
3 fcu panel termination 1 nos
4 light fixing 10 nos
5 Gi faxible kopex 50 mtrs
Wall casing
1 PVC Conducit Mtr
2 3X4 G.I Box Nos
3 3X3 G.I Box Nos
4 4X4 G.I Box- Nos
5 Strobe Nos
6 H/L Nos
7 HD Nos
8 Thermostat Nos
9 Resset Button Nos
10 Disable Toilet Alaram Panel Nos
11 Over Door Light& Sounder Nos