Bridge Construction Partner PDF
Bridge Construction Partner PDF
PRECAST
SEGMENTAL
CONSTRUCTION
INSITU
CONSTRUCTION
HEAVY LIFTING
STAY CABLE
CONSTRUCTION
CONTENTS
From Post-tensioning to Bridge Construction Partner ------- 3
VSL turnkey services ----------------------------------------------------- 4
Safety first ------------------------------------------------------------------- 6
Encouraging development of employee’s skills ------------------- 7
Precast segmental erection
Balanced cantilever erection with launching gantry ------ 8
Sungai Johor - Malaysia (2006-2009)
Span by span erection with launching gantry -------------- 10
Balanced cantilever erection with lifting frames ---------- 12
Balanced cantilever erection with cranes ------------------ 14
Precast beam method -------------------------------------------- 16
Full span precast method --------------------------------------- 18
Span by span erection on falsework ------------------------ 20
Insitu construction
Incremental launching method --------------------------------- 22
Form traveller method ------------------------------------------- 24 Gautrain - South Africa (2008-2010)
VSL has evolved from a specialist post-tensioning company into a multi discipline
bridge partner, capable of providing contractors and engineers with construction
and engineering services for highly complex and demanding projects. More
importantly, the localised organisation of VSL provides clients with innovative
practical designs and construction solutions adapted to suit the local market.
Lateral thought processes encouraged within the design and production teams
provide a suitable environment in which to nurture novel, and often remarkably
simple solutions to demanding problems. The exchange of knowledge within the
VSL global network enables the group’s considerable experience to be fully utilised
and applied in a wide variety of engineering domains.
As a specialist bridge partner, VSL can bring the project team an extensive
experience gained from erecting over 100,000 precast bridge deck elements Shenzhen Western Corridor -
(providing almost 5 million square meters of bridge surface), constructing multiple Hong Kong (2004-2005)
in-situ bridges utilising VSL form travellers and incremental launching methods
and also being involved in the construction of over 150 stay cable bridges.
VSL is committed to offering clients the ‘best for project’ service that has recently
led to the development and implementation of various innovative Partnering and
Alliancing arrangements that have proved to be highly successful and mutually
beneficial to all parties.
3
3
VSL’S TURNKEY SERVICES
From the very early concept design all the way through to the project’s handover and beyond, VSL is
working closely with its customers. Owners require the most suitable project completed as quickly as
possible in the most economic and durable manner. Contractors need feasibility studies to establish the
most efficient and cost-effective building solution.
Define Optimise
Choice of construction methods based Structural principles
on local environmental and economic • Selection of locally available materials
constraints • Outlined construction methods and definition
• Structure type and the temporary works of temporary works
required • Detailed design of permanent structure,
• Project timeline taking account of the construction methods
• Cost comparisons for budgeting • Integrated workshop drawings
4
Deliver Maintain
Design of erection equipment with the performance • Monitoring of the structure
to meet the programme and the specifications • Periodic maintenance
• Fabrication of temporary works • Strengthening if required
• Set-up and management of precasting areas • Repairs on demand
• Mobilisation of highly qualified staff
• Management of the construction project
5
5
Safety first MAJOR EQUIPMENT OPERATION
Permit No.
PERMIT
VSL’s construction projects for bridges
and other structures involve the operation The operation of the following Major Equipment is permitted: in the specified location; under the authority of the specified
Project Manager; in strict accordance with the permit conditions; and, during the specified period only.
of major items of machinery, which are
Profit Centre: Project Name:
usually designed or adapted to meet the
specific conditions and constraints of each Project/Job No.: Project Manager:
particular project. This means that VSL’s Equipment Type: Equipment No.:
equipment is usually complex and one–of-
Equipment Function: Form travelers for In Situ Balance Cantilever construction (underslung)
a-kind, controlled by multiple operators.
It therefore requires a high level of In accordance with
Major Equipment
preparation, engineering, coordination Operation Plan Ref.:
Rev.: A Date:
and skills to ensure its safe and efficient Additional Conditions _ YES (See Attached) NO
operation. Permit Period (inclusive)
From: To:
6
Encouraging development of employees’ skills
VSL Academy
7
7
BALANCED CANTILEVER SPAN BY SPAN LIFTING FRAME CRANE PRECAST BEAM FULL SPAN PRECAST FALSEWORK INCREMENTAL LAUNCH
VSL has over 20 years experience in works designs in close cooperation sequences and methods while achieving
the design and construction of precast and conjunction with Designers and optimal productivity. VSL is recognised
segmental balanced cantilever bridges. Consultants. as a world leader in precast segmental
VSL in-house technical centres are VSL has the capability and necessary erection and has worked extensively with
primarily involved in the design of erection experience to work with designers and international contractors on technically
systems and associated temporary works, contractors to develop cost effective designs demanding projects. VSL’s highly efficient
and have also completed many permanent that promote safe, effective construction erection systems enable contractors to
Stitching Beam
N-1 N
8
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
LAUNCHING GANTRY
FEATURES & ADVANTAGES
Necessary temporary
works require little ground
improvement and are generally
Second Gateway Bridge - Australia (2008- Lai Chi Kok - Hong Kong (2004-2006) elevated, therefore causing
2010) 29,526m² of deck, 700 precast elements 63,000m2 of deck, 1,771 segments minimal disruption to existing
roads, structures or services.
VSL has been involved in an extensive has a proven ability to provide Consultants, minimise additional temporary works
number of span-by-span precast segmental Engineers and Contractors with innovative, required during the construction stage.
projects in the Asia region and has recently practical and cost effective solutions, proving Within the VSL network, an extensive pool
completed large segmental infrastructure to be mutually beneficial to all parties of suitably qualified personnel is available
projects in South America and the Middle involved. to manage, supervise and operate the
East. Often in the face of demanding VSL erection systems are developed to high capacity erection gantries. Generally,
design, program and site constraints, VSL optimise permanent works design and in support of the production teams, each
Winch
Rear Support Leg Upper Cross Beam
Main Truss
Rear Lower Cross Beam
Hanger Beams
Segment Delivery at
Direction of Erection Ground Level
N-2 N-1 N
10
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
GANTRY
FEATURES & ADVANTAGES
project will have a project specific technical Regular erection rates achieved are 1 span
team responsible for providing details, and per 2.5 days with underslung gantries, and
advising on and monitoring the works to 1 span per 4 days with overhead gantries.
ensure all necessary technical and safety Being allowed to operate 24-hour a day, VSL
aspects are provided for. In addition, various recently achieved in Chile a typical erection
VSL technical centres are utilised to provide cycle of 1 span every 24 hours.
specific assistance if and when required.
Launching of Gantry
Segment Placing
Curing (Overnight)
Front Lower Cross Beam
Installation of External P.T.
N+1
Stressing of External P.T.
11
BALANCED CANTILEVER SPAN BY SPAN LIFTING FRAME CRANE PRECAST BEAM FULL SPAN PRECAST FALSEWORK INCREMENTAL LAUNCH
VSL continually develops innovative Extensive studies conducted by considerable delivery constraints. VSL
lifting solutions applicable to precast VSL’s technical centres facilitate the lifting frames are self-contained and
segment erection. VSL strand lifting units, development of project specific lifting incorporate safe unobstructed working
incorporating multiple safety features are systems. Precast element delivery platforms and accesses to all necessary
regularly utilised, providing a large range usually governs the method adopted and locations.
of lifting capacities whilst allowing precise VSL have successfully operated lifting Following assembly, installation and
alignment and placement of segments. frames suitable for use on projects with commissioning by suitable cranes, VSL
Stitching Beam
Alignment/Support
Stressing Platform
Bracket
Stressing Platform
Lifting Spreader Beam
Closure Stitch Formwork
Segment Delivery at
Ground Level
N-2 N-1 N
12
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
LIFTING FRAMES
FEATURES & ADVANTAGES
lifting frames can operate independently. VSL technical centres typically work with supervisory teams regularly achieve
VSL lifting systems incorporate two primary engineers to incorporate necessary lifting erection cycles of two pairs of segments
hydraulic systems providing both lifting and system tie down into the permanent works, per shift.
self-launching mechanisms. When high to ensure suitable load introduction into the
lifting speeds are required, generally greater permanent works and also provide stage
than 20 meters per hour, tandem lifting by stage analysis, geometry control and
units or winch systems have been utilised. precamber calculation. VSL’s experienced
Erection using suitable mobile craneage VSL project teams provide detailed craneage team to develop additional temporary works,
has frequently been executed by VSL, studies helping to optimise crane usage while in particular pier segment supports and
particularly in relation to balanced cantilever minimising disruption to the surrounding access requirements. VSL is capable of
construction. When site and ground environment. In particular, VSL has assisted offering stage-by-stage analysis and detailed
conditions are suitable, this method of contractors to develop and implement precamber calculation. With careful project
erection has proved highly effective and can temporary traffic management schemes. design and management, cranes of varying
facilitate considerable rates of erection. VSL technical centres work with production types and capacities have been utilised by
Stressing Platform
Hanger Beams
Stitching Beam
N-2 N-1 N
14
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
CRANES
FEATURES & ADVANTAGES
Minimal engineering
requirements.
Lai Chi Kok - Hong Kong (2004-2006) Deck construction does not
63,000m2 of deck, 1,771 segments have to be linear, but can
be sequenced to follow pier
construction.
1st
Typical Erection Cycle Duration: 8 Shifts
Description 1 2 3 4 5 6 7 8
Installation of
Pier Segment Support Brackets
Installation of Pier Segment
N+1 N+2
Segment Erection - Pair 10-12
15
BALANCED CANTILEVER SPAN BY SPAN LIFTING FRAME CRANE PRECAST BEAM FULL SPAN PRECAST FALSEWORK INCREMENTAL LAUNCH
VSL has considerable experience in the erection system to be adopted. VSL has In addition to the erection of primary
erection of various precast beam structures. utilised a variety of launching girders, beam structural members, VSL has also been
Methods of erection have been developed launchers and lifting frames, capable of responsible for the complete construction
following extensive studies relating to receiving precast beams directly behind, of bridge decks including placement of
site constraints. Generally, the delivery of below or in parallel to the erection system. precast planks, and insitu works. VSL’s
precast beams to the erection front is the I beams, U beams and T beams have been experienced project specific management,
determinant that influences the method of erected extensively. supervisory and technical teams facilitate
Support Tower
Beam Delivery at Ground Level
Direction of Erection
N-2 N-1 N
16
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
Sarasin Bridge - Phuket, Thailand (1991- East Coast Parkway - Singapore (1981)
1992) 7,800m2 of deck, 182 beams 68,250m2 of deck, 180 beams
rates of erection often exceeding one span Tandem lifting of full span precast beams with
per day. cranes has also been adopted facilitating the
With the precast beam method, strand and lifting of large loads often exceeding 100
winch lifting units are utilised, providing tonnes in weight and 40m in length.
safe and precise placement of precast
elements, allowing multiple degrees of
alignment and efficient rates of erection.
The full span precast method of erection specific references including the Taiwan labour and necessary plant requirements.
is particularly suited to projects comprising High Speed Rail Project and the Singapore Other than access to the pier heads, very
multiple spans of similar length which MRT. little temporary works are required and follow
have minimal horizontal radii. Typically Full span precast elements can be up activities are minimised.
rail networks are most suitable for this constructed in a static casting yard under Rapid rates of erection are achievable, and
method of erection. VSL has considerable factory conditions which facilitate improved VSL has obtained erection rates of up to
experience in this field of erection, with safety and quality while also optimising 2 spans per day with one launcher. Delivery
Launching Carrier
Front Lifting Frame Front Trailer
Delivery of Precast Span along Completed Rear Lifting Frame
!
Lifting Winches
Rear Trailer
"
#
N-1 N N+1
18
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
VSL has adopted the falsework support to enable temporary segment support, engineering and production staff conduct
method on many precast segmental alignment and load transfer onto piers. extensive logistic studies relating to site
projects. Typically, segments are loaded onto the access, segment handling and temporary
Dependent upon the imposed loading and falsework support using suitable craneage. foundation needs. Modular support systems
the effective height, conventional scaffold However, if access is limited, VSL has also are adopted to minimise relocation durations
support or heavy shoring systems are developed alternative solutions for the and to optimise erection rates. Long span
utilised. Hydraulic systems are incorporated handling and loading of segments. VSL support structures are often developed to
N-2 N-1 N
Temporary Support
20
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
Minimised engineering
requirements are possible.
Deep Bay Link - Hong Kong (2004-2005) Penny’s Bay - Hong Kong (2003-2004)
108,000m2 of deck, 3,014 segments 16,240m2 of deck, 627 segments
Description 1 2 3 4
Erection of Segments
21
BALANCED CANTILEVER SPAN BY SPAN LIFTING FRAME CRANE PRECAST BEAM FULL SPAN PRECAST FALSEWORK INCREMENTAL LAUNCH
INSITU CONSTRUCTION
INCREMENTAL LAUNCHING METHOD
The principle of the incrementally launched then jacked forward a distance equal to bridges having constant cross sectional
bridge consists of building the superstructure the length of this segment. This process shape throughout their length. The bridge
segments in a casting yard located behind is repeated until the bridge is in its final should be straight or have constant
the bridge abutment. Each segment is position. Additional continuity prestress is horizontal and vertical curvatures.
matchcast against the previous one and then installed and the temporary bearings The incrementally launched bridge has
prestressed to the section of superstructure are replaced by the permanent bearings. several advantages. It eliminates the
already built. The entire superstructure is This form of construction can be used for traditional scaffolding required for supporting
Lateral Restraint
Scaffolding for Access
22
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
Rybny Potok - Czech Republic (2005) Caguanas River Bridge - Puerto Rico
58m of span length, 10,858m2 of surface (1981) 385m of bridge length
the formwork. This is particularly valuable easily supervised, giving a high quality of
for projects with high piers, in urban areas, workmanship. However, it should be noted
spanning over deep water, over roads and that the post-tensioning requirements for
over railways. Most of the construction the launching operations usually result in
operations take place in the same location, higher quantities when compared with other
which may be organised as a precasting construction methods.
yard. The precasting work is thus more
Stress P.T.
23
BALANCED CANTILEVER SPAN BY SPAN LIFTING FRAME CRANE PRECAST BEAM FULL SPAN PRECAST FALSEWORK INCREMENTAL LAUNCH
INSITU CONSTRUCTION
FORM TRAVELLER METHOD
Developed from VSL’s earlier form traveller adopted to suit engineers’ designs. Unobstructed working platforms and
systems, VSL has produced a standardised Mechanical and hydraulic systems built access are incorporated into the form
modular form traveller system, applicable into the form traveller system ensure system.
to most contemporary bridge designs. This precise control of the bridge during Reinforcement and concreting operations
highly flexible system allows efficient and construction. The lightweight modular have been optimised by minimising
repeated use on bridges with different cross system requires minimal support craneage obstructions caused by the form traveller.
sections. A variety of casting lengths can be during assembly, erection and relocation. Typical cycles of 5 days per pair of segments
Main Frame
N N+1
24
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
INSITU CONSTRUCTION
VSL FORM SYSTEMS
VSL has considerable experience in a operation, VSL is also able to provide and operation of the casting yard including
wide variety of insitu form system ranging detailed design, supply and operation of reinforcement and concreting operations.
from self climbing form systems utilised precast cells required for precast segmental VSL form systems are generally modular,
for pier and pylon construction to large bridge decks, precast beams, and also full light weight and provide clear unobstructed
span underslung movable scaffold support span precast elements. Recently, on the access to all necessary working areas.
systems. Taiwan High Speed Rail Project, VSL was Mechanised VSL Form Systems facilitate
To complement any precast erection responsible for the complete establishment casting of highly complex structures with
26
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
Light Rail Transit - Dubai (2007-2009) Tsing Ma Bridge - Hong Kong Taiwan High Speed Rail C215 - Taiwan
Casting Yard Pier climbform Pretensioning bed and form
Keppel Bay Bridge - Singapore (2007) Kisosansen Bridge - Japan Taiwan High Speed Rail C215 - Taiwan
4,132m² of deck, 77 bridge segments Match cast short line cells Pretensioning bed and form
variable geometric properties, and produce achieve an optimal cycle of three days per
high quality finishes often required by four meter lift, however, due to the modular
clients. arrangement of the system, variable lift
VSL managed casting yards regularly heights can be accommodated with relative
achieve precast segmental production rates ease up to a maximum lift height of six
of up to one segment per day, per cell. meters.
The VSL Climb Form System will generally
27
BALANCED CANTILEVER SPAN BY SPAN LIFTING FRAME CRANE PRECAST BEAM FULL SPAN PRECAST FALSEWORK INCREMENTAL LAUNCH
For economic or technical reasons, today’s Unique Solutions The extensive experience of VSL personnel
bridge structures are often assembled from and VSL’s exceptional track record provide
VSL will plan lifting, horizontal jacking,
large, heavy, pre-fabricated elements. further assurance of reliable performance.
or lowering operations and design the
For projects in which cranes or other
necessary temporary structures to suit Flexibility
conventional handling equipment cannot
the requirements of the projects. Sound
be used because of excessive weight, VSL’s range of equipment provides the
engineering, clear thinking, the ability to
dimensions or space limitations, VSL capability to lift or lower single loads
innovate, and years of successful experience
Heavy Lifting will often provide the most well in excess of 10,000t and includes a
provide a guarantee of reliable and cost-
effective solution. large range of hydraulic jacks, pumps,
effective solutions.
controls units, monitoring devices, and
VSL Heavy Lifting provides contractors,
modular lifting/jacking frames. Thus, VSL
engineers and owners with a broad range
has both the capability and flexibilty to
of advantages, including: Safety
perform virtually any project requiring
Economy and efficiency, through custom The safety of personnel and components lifting, lowering or horizontal jacking.
designed solutions. are VSL’s first priority. Specialised
The VSL Service Package
hydraulic lifting equipment is designed
Reliability, based upon sound
for the highest level of reliability, and VSL offers a complete range of services
engineering and three decades of
all equipment is rigorously tested and for the planning, engineering, equipment
experience.
serviced through VSL’s quality control supply and execution of any heavy lifting
The highest level of safety through the and maintenance program. VSL field project. VSL Heavy Lifting services provided
use of advanced and reliable hydraulic services are also based upon a total throughout the world include:
equipment. commitment to safety.
28
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
CONSTRUCTION
FEATURES & ADVANTAGES
Feasibility studies and preliminary Design, manufacture and supply of The planning of a heavy lifting operation
consultation for lifting, horizontal special equipment and temporary should be started as early as possible. Early
jacking and lowering operations. structures, if required. involvement of VSL specialists will result in a
handling scheme that optimises the project’s
Pro j e c t d e s i g n a n d p l a n n i n g, Leasing and operation of VSL
economy, efficiency and schedule.
equipment specification, scheduling equipment and execution by VSL
and budgeting. or others.
29
BALANCED CANTILEVER SPAN BY SPAN LIFTING FRAME CRANE PRECAST BEAM FULL SPAN PRECAST FALSEWORK INCREMENTAL LAUNCH
Taipei Ring Road - Taiwan (2008) Sucharskiego Bridge - Poland (2000-2001) Europa Bridge - Portugal (2000-2002)
Main span 200m, 546t of stay cables Main span length: 230m Main span length: 185.6m
The VSL SSI 2000 Stay Cable System is excellent corrosion protection, easy incorporates greased and sheathed
acknowledged as being one of the leading monitoring and maintenance. Installation monostrands contained within a continuous
systems currently available worldwide. The and replacement is carried out using strand external HDPE stay pipe, with no grouting in
system is based around the proven VSL by strand method which has the benefit of the cable. Additional enhancements can be
strand and wedge anchorage technology requiring very little space and which utilises offered including; metalisation (galvanising)
and is designed to meet the most stringent relatively light weight equipment. of the monostrands for additional corrosion
criteria offering high fatigue resistance, In the basic configuration the system protection, coloured HDPE stay pipes,
30
FORM TRAVELLER FORM SYSTEM HEAVY LIFTING STAY CABLE
Yichong Yiling Bridge - Hubei, China (2001) Safti Bridge - Singapore (1995)
Main Span Length: 348m Main span length: 99m
Taney Bridge - Ireland (2002) Radès La Goulette Bridge - Tunisia Uddevalla Bridge - Sweden (1998)
Main span length: 109m (2007) Main span length 120m Main span length: 414m
helical ribbing on the stay pipes to reduce able to offer clients a full range of specialist
risk of wind rain induced cable vibrations, bridge construction services from stage by
and the VSL Friction Damper one of the most stage construction analysis to the actual
efficient and robust forms of cable damping construction of the entire superstructure
available. including the design and supply of the
In addition to the design, supply and necessary temporary works and construction
installation of the stay cable system, VSL is equipment.
31
CREATING SUSTAINABLE SOLUTIONS TO
VSL Engineering
32
GETHER
VSL Post-tensioning VSL Stay cables
Cable-stayed structures are ideal for spans longer than
typically seen in cantilever bridges and shorter than those
requiring a suspension bridge. This is the range in which
cantilever spans would rapidly grow heavier if they were
lengthened, and in which the spans would be too short to
be economical as a suspension bridge.
33
33
VSL Dampers for bridges VSL Heavy lifting
Modern cable-stayed structures
have to accommodate increased
dynamic demands on their cables.
The most versatile means of
controlling vibrations is to increase
the structural damping ratio of the
cables by installing VSL Dampers.
they are adaptable, of great durability
and have only very low maintenance costs, achieved by
reducing the number of moving parts. The VSL Heavy lifting methods using hydraulic jacks and
strand or bar tendons are part of VSL’s core business. The
VSL’s Gensui and Friction Dampers are based on the approach is very versatile and allows the movement of very
principle of energy dissipation, achieved heavy loads safely and economically.
respectively by the deformation
of special rubber pads or by the The application of strand lifting
friction between a steel plate and a units for lifting, lowering and the
special composite pad. In contrast, movement of heavy loads generally
hydraulic dampers are mechanically involves a custom-made method for
more complex, subject to oil leakage every project. The resources are
and so require substantially more mostly reused and generate the
maintenance. minimum environmental impact.
Furthermore, VSL Dampers’ mitigation Energy consumption is low. Other important factors are safety
of vibrations reduces the risk of material fatigue in the and ease of access. VSL’s heavy lifting equipment can be
stays and in the bridge, which in turn reduces the need placed in locations where no crane could reach. The strand
for maintenance during the service life of the structure. lifting systems can be adapted to every kind of technical
Dampers make a vital contribution to increasing the life requirement and environment to move very heavy loads easily.
expectancy of the structures where they are installed. Loads of 30,000t have been moved without any problems.
Please refer to the “VSL Damping Systems for Stay Please refer to the “VSL Heavy Lifting” brochure for further
Cables” brochure for further information. information.
34
VSL LOCATIONS
Headquarters
VSL International Ltd. Middle East /
Sägestrasse 76
CH-3098 Köniz SULTANATE OF OMAN MALAYSIA
Switzerland VSL Muscat LLC VSL Engineers (M) Sdn. Bhd.
MUSCAT KUALA LUMPUR
Phone: +41 58 456 30 00 Phone: +971 4 885 7225 Phone: +603 7981 47 42
info@vsl.com Africa / UNITED ARAB EMIRATES PHILIPPINES
VSL Middle East LLC VSL Philippines Inc.
EGYPT PORTUGAL MANDALUYONG CITY
VSL Sistemas Portugal SA DUBAI, UAE
VSL Egypt Phone: +971 4 885 7225 Phone: +632 722 1703
CAIRO PAÇO DE ARCOS
Phone: +351 21 445 83 10
Americas / Phone: +20 2 344 19 00 DOHA, QATAR
Phone: +974 44 052 444
SINGAPORE
VSL Singapore Pte. Ltd.
Delegação Norte
SOUTH AFRICA VILA NOVA DE GAIA SINGAPORE
ARGENTINA VSL Construction Solutions (Pty) Ltd Phone: +65 6559 12 22
VSL Sistemas Especiales de Phone: + 351 22 371 18 80
JOHANNESBURG
Construcción Argentina SA Phone: +27 11 878 6820 SPAIN
Asia / TAIWAN
BUENOS AIRES VSL Taiwan Ltd.
Phone: +54 11 5272 87 52 TUNISIA VSL Construction Systems SA
BARCELONA BRUNEI TAIPEI
VSL Tunisia VSL Systems (B) Sdn. Bhd. Phone: +886 2 2759 6819
BOLIVIA TUNIS Phone: +34 93 289 23 30
BRUNEI DARUSSALAM
Postensados de Bolivia Phone: +216 70 72 84 73 Phone: +673 2 380 153 / 381 827 THAILAND
SAN MIGUEL, LA PAZ
SWEDEN
Internordisk Spännarmering AB VSL (Thailand) Co. Ltd.
Phone: +591 2 27 70 338
VÄSTERHANINGE CHINA PRC BANGKOK
VSL Engineering Corp., Ltd.
BRAZIL Europe / Phone: +46 10 448 11 42
(China)
Phone: +66 2 679 76 15 - 19
VSL Brasil Construção e SWITZERLAND HEFEI VIETNAM
Recuperação Ltda AUSTRIA VSL (Switzerland) Ltd. Phone: +86 551 382 29 18 VSL Vietnam Ltd.
SÃO PAULO Grund-Pfahl- und Sonderbau HANOI
SUBINGEN
Phone: +55 113 521 7153/4 GmbH
Phone: +41 58 456 30 30 HONG KONG Phone: +84 4 3976 5088
HIMBERG VSL Hong Kong Ltd.
CANADA Phone: +43 2235 87 777 SAINT LEGIER CHAI WAN HO CHI MINH CITY
CTT Stronghold Canada Phone: +41 58 456 30 00 Phone: +852 2590 22 88 Phone: +84 8 810 6817
TORONTO CZECH REPUBLIC
Phone: +1 416 477 1042 VSL Systemy (CZ) Sro TURKEY INDIA
PRAGUE VSL India Private Ltd.
CHILE Phone: +420 2 51 09 16 80
Mega Yapi Construction &
Trade Co. Ltd CHENNAI Australia /
VSL Sistemas Especiales de ANKARA Phone: +91 44 4225 11 11
Construcción S.A. FRANCE Phone: +90 312 490 90 66 VSL Australia Pty. Ltd.
SANTIAGO VSL France S.A. (Bouygues TPRF) INDONESIA NEW SOUTH WALES
Phone: +56 2 571 67 00 LABÈGE UNITED KINGDOM PT VSL Indonesia Phone: +61 2 9484 5944
Phone: +33 5 33 65 96 59 VSL System (UK) Ltd. JAKARTA
LUTON Phone: +62 21 570 07 86 QUEENSLAND
COLOMBIA GERMANY Phone: +44 148 040 4401 Phone: +61 7 3265 64 00
Sistemas Especiales de
Construcción S.A.S
VSL Systems GmbH JAPAN VICTORIA
BERLIN VSL Japan Corporation
BOGOTA Phone: +61 3 979 503 66
Phone: +49 172 313 22 33 TOKYO
Phone: +57 1 226 6230
Phone: +81 3 3346 8913 SOUTH AUSTRALIA
NETHERLANDS Phone: +61 8 8252 1900
MEXICO Heijmans Beton-en Waterbouw B.V. KOREA
VSL Corporation Mexico S.A de C.V ROSMALEN VSL Korea Co. Ltd. TASMANIA
MEXICO Phone: +31 73 543 66 02 SEOUL Phone: +61 3 6249 3044
Phone: +52 55 55 11 20 36 Phone: +82 2 553 8200
NORWAY PERTH
PERU Spennarmering Norge AS Phone: +61 8 9419 1119
Sistemas Especiales de Construcción RUD
Peru S.A. Phone: +47 98 21 02 31
LIMA
Phone: +51 1 349 38 38 POLAND
VSL Polska Sp. Zo. o
VSL Peru WARSZAWA
LIMA Phone: +48 22849 22 09
Phone: +51 1 713 98 32 VSL Infrastructure Protection Ltd. Intrafor Hong Kong Ltd. FT Laboratories Ltd.
LONDON CHAI WAN, HONG KONG PING CHE, HONG KONG
UNITED STATES OF AMERICA Phone: +44 207 803 3614 Phone: +852 2836 31 12 Phone: +852 2758 48 61
VStructural LLC SINGAPORE DUBAI, UAE
BALTIMORE, MD Phone: +65 65 59 12 22 Phone: +971 4 885 7225
Phone: +1 410 850 7000 VSL Offshore Pte Ltd.
SYDNEY SINGAPORE
Phone: +61 2 94 84 5944 Phone: +65 65 59 13 05
The information set forth in this brochure including technical and engineering data is presented
for general information only. While every effort has been made to insure its accuracy, this
information should not be used or relied upon for any specific application without independent
professional examination and verification of its accuracy, suitability and applicability. Anyone
using this material assumes any and all liability resulting from such use. VSL disclaims any and
all express or implied warranties of merchantability fitness for any general or particular purpose
Printed on paper or freedom from infringement of any patent, trademark, or copyright in regard to the information
from sustainably or products contained or referred to herein. Nothing herein contained shall be construed as
managed forests. granting a license, express or implied under any patents.