Progres Samboja
Progres Samboja
00 ### ###
Geoteknik Engineer 1.00 3.00 3.00 ### 72,000,000.00
Geodesi Engineer 1.00 2.00 2.00 ### 48,000,000.00
Hidrologi Engineer 1.00 2.00 2.00 ### 48,000,000.00
LAPORAN
Penggadaan Formulir 1.00 1.00 1.00 200,000.00 200,000.00
Laporan Pendahuluan 1.00 5.00 5.00 150,000.00 750,000.00
Laporan Bulanan 3.00 6.00 18.00 100,000.00 1,800,000.00
Laporan Teknik 1.00 5.00 5.00 300,000.00 1,500,000.00
Laporan Antara 1.00 5.00 5.00 250,000.00 1,250,000.00
Draft Laporan Akhir 1.00 5.00 5.00 200,000.00 1,000,000.00
Laporan Akhir + Dokumen 1.00 5.00 5.00 1,500,000.00 7,500,000.00
Eksekutif Sumary 2.00 5.00 10.00 100,000.00 1,000,000.00
Softcopy 1.00 1.00 1.00 1,000,000.00 1,000,000.00
8,000,000.00 8000000
10,000,000.00 10000000
58,000,000.00 58000000
7,000,000.00 7000000
200,000.00 200000
750,000.00 750000
450,000.00 450,000.00 450,000.00 450,000.00 1800000
1,500,000.00 1500000
1,250,000.00 1250000
1,000,000.00 1000000
7,500,000.00 7500000
1,000,000.00 1000000
1,000,000.00 1000000
542600000
542600000 20.64136 5.160339 5.160339 5.160339 5.160339
542600000 13.26944 4.423148 4.423148 4.423148
542600000 8.846296 4.423148 4.423148
542600000 8.846296 4.423148 4.423148