Professional Documents
Culture Documents
paving paving
2,70
1,50
2,00 2,00
-0.20
2,82
MIHRAB 3,03 8,39
0.00
10,86
-0.05
3,20
2,36
4,06
6,50
paving
-0.15
3,30 -0.10 4,48
7,22
-0.15 1,00 -0.20
2,25
Keramik
1,50 1,60
1,50
-0.20 Keramik
paving 5,73
5,50
Keramik
1,75
2,89
0,67
1,17
T. DEPAN RENCANA
SKALA 1:100
T. BELAKANG EXISTING
SKALA 1:100
T. BELAKANG RENCANA
SKALA 1:100
T. KANAN EXISTING
SKALA 1:100
T. KANAN RENCANA
SKALA 1:100
1,98
0,89
DETAIL HURUF TIMBUL
SKALA 1:50
STAINLESS
T. KIRI EXISTING
SKALA 1:100
T. KIRI RENCANA
SKALA 1:100
2,98
5,55
7,34
7,85
CANAL C 100.50.20.1,6
7,22
BAJA RINGAN
DENAH ATAP
SKALA 1:100
5,66