You are on page 1of 29
RAWAT BASIN OIL DEVELOPMENT PROJECT ly “RPOC cennow ‘DOG NO: FSF-CAL-CIV-1625AW2-0500 REV.4 Page 1 0f29 RAWAT PETROLEUM OPERATING COMPANY LTD. DESIGN CALCULATION FOR PIPE SUPPORTS AND FOUNDATION-WELL AREA | (FSF) CONTRACT NO: C/RPOC/1/16/; WORK ORDER REQUEST NO. CREATIVE SOLUTIONS CO., ut CHINA PETROLEUM ENGINEERING CO., LTD. + | eames, [mae] ve | wa | tas [ibe o | SRRBEOR, [aeons] Y¥e | A | Las 8 issueororrevew | 160719) YYC uA | Las Rev DEscRIPTION | parE | PREPARED | CHECKED | APPROVED) guiewr AP RAWAT BASIN OIL. NI ‘ag | DEVELOPMENT PROJECT ‘DOG NO: FSF-CAL-CIV-1626AW2.0500 REV. Page 2 of 28 ‘TABLE OF CONTENTS 149 score. 20 REFERENCES, CODES & STANDARDS..... 30 LOADS... 4.9 LOAD COMBINATIONS non 5.0. ACTUAL LOAD APPLIED 60 STAD MODEL FOR PIPE SUPPORT-TYPE 1. 70 STAADINPUT FORPIPE SUPPORT TYPE =n 80 STAAD OUTPUT FILE FOR PIPE SUPPORT- TYPE fox. 9.0 STAAD MODEL FOR PIPE SUPPORT-TYPE 2vcnnnnsnnnnnnnsnnnnnnet 10.0 STAADINPUT FOR PIPE SUPPORT TYPE-2... =) 41.0 STAAD OUTPUT FLE FOR PIPE SUPPORT TYPE 2. pine 420 STAAD MODEL FOR PIPE SUPPORT-TYPE 3. 4130. STAAD INPUT FOR PIPE SUPPORT TYPE Senn 440 STAAD OUTPUT FILE FOR PIPE SUPPORT TYPE Scnnunsn 4180. STAAD MODEL FCR PIPE SUPPORT-TYPE 4 4.0 STAD INPUT FOR PIPE SUPPORT TYPEM.. 47.0 STAAD OUTPUT FILE FOR PIPE SUPPORT TYPE 4... 18.0 STEEL PILE DESIGN... 419.0 CONCRETE PILE DESIGN. aa er ath RAWAT BASIN OIL. Al ly, (qe | DevELopmenr prosect We ceNTROID DOC NO: FSF-CAL-CIV-1e25ANW2-0500 REV. Page 3 of 29 40 SCOPE ‘This Design document contains design of design calculation for pipe supports and foundation st well aren. Design calculation ic presented below. {As forthe geotechnical condions al the ste, hard desiccated clays with high potential for Swoling and song expansion and shrinkage, elavely low expected bearing capaciy ‘values on saturation with vator andthe antipated volume change charactrstes ofthe ‘ay so superficial foundation shoul not be rectly buon the top Layer. This sheet ‘contains the steel pipa ple design and concrete ple foundation design. Some data is fssumed aocording te dasecated cay charactors, the cohesion and skin fin can be fully used for pla design fo overcome the characteristic of sttong sweling and Shrinking when the water cntont of subso is changed, 2.0 REFERENCES, CODES & STANDARDS ACE318. Buldrg Code Requirements for Stuctural Conerete and Commentary ‘AISC American ietute of Stoo! Construction ‘GEN-SPC-CIV-1825A/02-0502 Speciation for Ping Design (GEN-SPC-CIV-18254/WV2-0501 Speciation for site work constructon GEN-SPC-CIV-15254/W2-0503 Specification for ping installation GEN-SPC-CIV-1325412.0516 Specification for structural design 7 Geotechnical Invatgation report. 30 LOADS 34 Dead Load (OL) Self weight ofthe stuctue and Pipe 32 LiveLoad (LL) Live load considered a8 weight of qui insie pipe and friction load as given by Piping epartment, 3:3 Wind Load (WL) Maximum design wind speed! 195 knsir Design parameters as per UNIFORM BUILDING CODE (1997) 34 Selsmic Load Seismic Zone uae zone 1 Design parameters #8 per UNIFORM BUILDING CODE (1897) Seismic toad not censiered fr Rui weight ructures ao Ile not likly to govern the dese. 40° LOAD COMBINATIONS 44 Stool Design peters LonD1 140 Lomb 120 + 1.6L Long 12 +1 LL + 13 LEON LOAD = A2OL + TLL AS LEX) RAWAT BASIN OIL DEVELOPMENT PROJECT NW hee ‘cexTROWD ‘DOG NO: FSF-CAL-CIV-1825A)W2.0500 REV. Page 4 of 23 LOADS -1.2DL+ 1LL + 13 WLeZ) LOADS = 1.2DL + 1LL+ 1.3 WLEX) Lono? gL + 4.3 WLOX) Loa = gol + 1.3 LK) Lope = gL + 1.3 WLEZ) LoaDio ogi + 1.3002) 42, For Foundation Design Lomi 1.001 voan2 = 100L+ LL LOADS 1.0DL+ TLL + 1.00%) LOADS = 1.0DL+ 1LL+ 1.0 W(X) LOADS — 1.0L + 1LL + LO WL eZ) LOAD ODL +4 LL + LOWE) LoAD7 ODL + 1.0 WL) Lops = L0DL+ LOWE) LoADe —4.00L+ LO WL(z) Lompin —4.0DL+ 10 (2) 0 ACTUAL LOAD APPLIED 54 Typet DLotpine = 1.87KN LL en pipe InXaiection = 0.4 KN In direction = 0.88 KN InZéiection = 0.75 KN. \Wind ead on column in X direction = 0,178 KNim Wind ead on pipe aopied as pont Toad ontop of calm in X direction ‘Wind lead an ealumnin Z rection 52 Tweez DLotppe = 187KN Len pipe InXdkecton = O4KN InYarecton = O83KN InZarecton = 075KN ‘Wind load on column inX direction ‘Wind lad on pipe applied a point Toad on top of colume in X rection 0.478 KN 0.178 KN 0.673 KN RAWAT BASIN OIL Al WW IENT PI DEVELOPMENT PROJECT | ihe oy DOC NO: FSF-CAL-CIV-1825ANW2-0600 REV. Page 6 of 29 Windiosd onsotunn in Zetion = 0-78 KN 53 Types DLofpie = 1.67KN Lon pipe InXdivecion = O4KN In cirect O8SKN Inzdeecton = 0.75 KN ‘Wind oad oncolumnin X drecton = 0.178 Km \Wind tad onppe apped as pint Toad ontop ofcokmnin x dreaion = 0.673KN ‘Wind load onbeam in Zdrectin = 0.288 KN Wind oad oneolurn in drecton = 0.178 KNm 54 Typed Dlofpie = 1.67KN Ubon pe InXdirecion = O4KN InY drecon = 0.83 KN InZdecton = O.78KN Wind fad oncolumn in X deecton = 0.178 KN \Wied fad onpipe applied as pint load ontop ofcolumn in Xrecton = 0.673 KN Wind load onbeam in Z 202 mn hence ok

You might also like