RAWAT BASIN OIL
DEVELOPMENT PROJECT
ly
“RPOC cennow
‘DOG NO: FSF-CAL-CIV-1625AW2-0500
REV.4
Page 1 0f29
RAWAT PETROLEUM OPERATING COMPANY LTD.
DESIGN CALCULATION FOR PIPE SUPPORTS AND
FOUNDATION-WELL AREA |
(FSF)
CONTRACT NO: C/RPOC/1/16/;
WORK ORDER REQUEST NO.
CREATIVE SOLUTIONS CO., ut
CHINA PETROLEUM ENGINEERING CO., LTD.
+ | eames, [mae] ve | wa | tas [ibe
o | SRRBEOR, [aeons] Y¥e | A | Las
8 issueororrevew | 160719) YYC uA | Las
Rev DEscRIPTION | parE | PREPARED | CHECKED | APPROVED) guiewrAP RAWAT BASIN OIL. NI
‘ag | DEVELOPMENT PROJECT
‘DOG NO: FSF-CAL-CIV-1626AW2.0500 REV. Page 2 of 28
‘TABLE OF CONTENTS
149 score.
20 REFERENCES, CODES & STANDARDS.....
30 LOADS...
4.9 LOAD COMBINATIONS non
5.0. ACTUAL LOAD APPLIED
60 STAD MODEL FOR PIPE SUPPORT-TYPE 1.
70 STAADINPUT FORPIPE SUPPORT TYPE =n
80 STAAD OUTPUT FILE FOR PIPE SUPPORT- TYPE fox.
9.0 STAAD MODEL FOR PIPE SUPPORT-TYPE 2vcnnnnsnnnnnnnsnnnnnnet
10.0 STAADINPUT FOR PIPE SUPPORT TYPE-2... =)
41.0 STAAD OUTPUT FLE FOR PIPE SUPPORT TYPE 2. pine
420 STAAD MODEL FOR PIPE SUPPORT-TYPE 3.
4130. STAAD INPUT FOR PIPE SUPPORT TYPE Senn
440 STAAD OUTPUT FILE FOR PIPE SUPPORT TYPE Scnnunsn
4180. STAAD MODEL FCR PIPE SUPPORT-TYPE 4
4.0 STAD INPUT FOR PIPE SUPPORT TYPEM..
47.0 STAAD OUTPUT FILE FOR PIPE SUPPORT TYPE 4...
18.0 STEEL PILE DESIGN...
419.0 CONCRETE PILE DESIGN.aa er
ath RAWAT BASIN OIL. Al ly,
(qe | DevELopmenr prosect
We ceNTROID
DOC NO: FSF-CAL-CIV-1e25ANW2-0500 REV. Page 3 of 29
40 SCOPE
‘This Design document contains design of design calculation for pipe supports and
foundation st well aren. Design calculation ic presented below.
{As forthe geotechnical condions al the ste, hard desiccated clays with high potential for
Swoling and song expansion and shrinkage, elavely low expected bearing capaciy
‘values on saturation with vator andthe antipated volume change charactrstes ofthe
‘ay so superficial foundation shoul not be rectly buon the top Layer. This sheet
‘contains the steel pipa ple design and concrete ple foundation design. Some data is
fssumed aocording te dasecated cay charactors, the cohesion and skin fin can
be fully used for pla design fo overcome the characteristic of sttong sweling and
Shrinking when the water cntont of subso is changed,
2.0 REFERENCES, CODES & STANDARDS
ACE318. Buldrg Code Requirements for Stuctural Conerete and Commentary
‘AISC American ietute of Stoo! Construction
‘GEN-SPC-CIV-1825A/02-0502 Speciation for Ping Design
(GEN-SPC-CIV-18254/WV2-0501 Speciation for site work constructon
GEN-SPC-CIV-15254/W2-0503 Specification for ping installation
GEN-SPC-CIV-1325412.0516 Specification for structural design
7 Geotechnical Invatgation report.
30 LOADS
34 Dead Load (OL)
Self weight ofthe stuctue and Pipe
32 LiveLoad (LL)
Live load considered a8 weight of qui insie pipe and friction load as given by Piping
epartment,
3:3 Wind Load (WL)
Maximum design wind speed! 195 knsir
Design parameters as per UNIFORM BUILDING CODE (1997)
34 Selsmic Load
Seismic Zone uae zone 1
Design parameters #8 per UNIFORM BUILDING CODE (1897)
Seismic toad not censiered fr Rui weight ructures ao Ile not likly to govern the
dese.
40° LOAD COMBINATIONS
44 Stool Design
peters
LonD1 140
Lomb 120 + 1.6L
Long 12 +1 LL + 13 LEON
LOAD = A2OL + TLL AS LEX)RAWAT BASIN OIL
DEVELOPMENT PROJECT
NW
hee ‘cexTROWD
‘DOG NO: FSF-CAL-CIV-1825A)W2.0500 REV. Page 4 of 23
LOADS -1.2DL+ 1LL + 13 WLeZ)
LOADS = 1.2DL + 1LL+ 1.3 WLEX)
Lono? gL + 4.3 WLOX)
Loa = gol + 1.3 LK)
Lope = gL + 1.3 WLEZ)
LoaDio ogi + 1.3002)
42, For Foundation Design
Lomi 1.001
voan2 = 100L+ LL
LOADS 1.0DL+ TLL + 1.00%)
LOADS = 1.0DL+ 1LL+ 1.0 W(X)
LOADS — 1.0L + 1LL + LO WL eZ)
LOAD ODL +4 LL + LOWE)
LoAD7 ODL + 1.0 WL)
Lops = L0DL+ LOWE)
LoADe —4.00L+ LO WL(z)
Lompin —4.0DL+ 10 (2)
0 ACTUAL LOAD APPLIED
54 Typet
DLotpine = 1.87KN
LL en pipe
InXaiection = 0.4 KN
In direction = 0.88 KN
InZéiection = 0.75 KN.
\Wind ead on column in X direction = 0,178 KNim
Wind ead on pipe aopied as pont
Toad ontop of calm in X direction
‘Wind lead an ealumnin Z rection
52 Tweez
DLotppe = 187KN
Len pipe
InXdkecton = O4KN
InYarecton = O83KN
InZarecton = 075KN
‘Wind load on column inX direction
‘Wind lad on pipe applied a point
Toad on top of colume in X rection
0.478 KN
0.178 KN
0.673 KNRAWAT BASIN OIL Al WW
IENT PI
DEVELOPMENT PROJECT | ihe oy
DOC NO: FSF-CAL-CIV-1825ANW2-0600 REV. Page 6 of 29
Windiosd onsotunn in Zetion = 0-78 KN
53 Types
DLofpie = 1.67KN
Lon pipe
InXdivecion = O4KN
In cirect O8SKN
Inzdeecton = 0.75 KN
‘Wind oad oncolumnin X drecton = 0.178 Km
\Wind tad onppe apped as pint
Toad ontop ofcokmnin x dreaion = 0.673KN
‘Wind load onbeam in Zdrectin = 0.288 KN
Wind oad oneolurn in drecton = 0.178 KNm
54 Typed
Dlofpie = 1.67KN
Ubon pe
InXdirecion = O4KN
InY drecon = 0.83 KN
InZdecton = O.78KN
Wind fad oncolumn in X deecton = 0.178 KN
\Wied fad onpipe applied as pint
load ontop ofcolumn in Xrecton = 0.673 KN
Wind load onbeam in Z 202 mn hence ok