R E M E D I A L A C T I O N O P E R AT I O N
(RAO)
S R I H A R J AT I S U H A R D I
THE GOAL
• Plots of cost and performance data are tools used to assess cost
efficiency.
• These plots should be used to
– track remediation system operation costs,
– mass of contaminant removed/destroyed,
– and cost per pound of contaminants removed/destroyed.
• The cost efficiency plots should be evaluated to identify
trends in cost and performance data.
• General conclusions that can be drawn from these
plots include:
– Efficient system operation demonstrated by cost
effective mass removal
– Decreasing system efficiency demonstrated by
decreasing cost effectiveness over time, resulting from
increasing O&M costs or decreasing mass removal
– Poor system efficiency demonstrated by asymptotic
conditions in the cost efficiency plots
CUMULATIVE MASS REMOVED VERSUS TIME
1. Background
1.1. Purpose and Scope
1.2. Site Description and History
1.3. Remedial System and Monitoring Activity Status
6. Optimization Recommendations
6.1. Optimization Strategy
6.2. Cost-benefit Analysis
7. Implementation Plan
7.1. Annual regulatory review
7.2. Regulatory documentation
7.3. Schedule for Implementation
SUMMARY
REMEDIATION PROCESS
OPTIMIZATION (RPO)
• is the systematic evaluation and enhancement of site remediation
processes to ensure that human health and the environment are being
protected over the long term at minimum risk and cost.
KEY ELEMENTS OF RPO INCLUDE THE
FOLLOWING
• Appropriate use of up-to-date conceptual site model (CSM),
• Flexible remedial action (RA) operations considering
technology limitations and risk assessments
• Use of treatment trains for each target zone
• Developing performance objectives for each element of each
treatment train
• Developing an exit strategy for each remedy component
considering life-cycle factors
• Cost analysis as a decision-making tool with the requirement
that protectiveness must be maintained or improved
• Consideration of life-cycle factors in remedial design
• Continual evaluation of all the above through RA operations.