Poles No.
Description
Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Poles
Spun Poles 36 Feet No.
Spun Poles 45 Feet No.
Conductor
ACSR DOG No.
HT Cables 240 MM SQ. No.
11-KV Line Assembly
1-L No.
2-L No.
7-L No.
10-L No.
16-L No.
21-L No.
23-L No.
Ordinary Stay
HT No.
LT No.
Total
Total 1-L
Sr. No. Description Quantity QTY
(NOS.) NOS. NOS.
1 STEEL CROSS ARM 35
2 X-ARM BRACE 1.25'' X 1/4'' X 2'.8'' 70
3 CROSS ARM STEP BRACE 0
4 DISC INSULATOR 42
5 DEAD END CLAMP 42
6 EYE NUT 5/8'' 42
7 M.S BOLT 1/2'' X 1-1/2'' 70
8 M.S BOLT 5/8''X 10'' 13
9 M.S BOLT 5/8'' X 9'' 13
10 M.S BOLT 5/8'' X 6'' 0
11 D.A BOLT WITH NUTS 510 MM 33
12 D.A BOLT WITH NUTS 305 MM 8
13 M.S CLAMP ASSEM. COMPLETE 3
14 ROUND WASHER 1'' DIA 7/16'' H 70
15 ROUND WASHER 1.75'' DIA 0.693'' H 26
16 SQUARE WASHER 123
17 PIN TYPE INSULATOR 51
18 INSULATOR PIN 51
19 P.G. CLAMPS 2-BOLT TYPE 18
20 D-SHACKLE WITH PIN 0
2-L 7-L 10-L 20-L 21-L
QTY QTY QTY QTY QTY
NOS. NOS. NOS. NOS. NOS. NOS. NOS. NOS. NOS. NOS.
23-L
QTY
NOS. NOS.
Sr. No. Description UNIT QTY
1 CONDUCTOR (HT) ACSR DOG KM.
2 HT CABLES 1-CORE 240 MM2 AL/XLPE M
3 STEEL CROSS ARM NO.
4 DISC INSULATOR NO.
5 DEAD END CLAMP HT NO.
6 ANCHOR SHACKLE NO.
7 G.S EYE NUT 5/8'' DIA NO.
8 G.S BOLT 5/8'' DIA 2'' LENGTH NO.
9 G.S BOLT 5/8'' DIA 10'' LENGTH NO.
10 G.S BOLT 5/8'' DIA 9'' LENGTH NO.
11 D.A BOLT WITH NUTS 510 MM NO.
12 D.A BOLT WITH NUTS 305 MM NO.
13 ROUND WASHER 1'' DIA 7/16'' H NO.
14 ROUND WASHER 1.75'' DIA 0.693'' H NO.
15 SQUARE WASHER NO.
16 PIN INSULATOR NO.
17 INSULATOR PIN NO.
18 STAY ASSEMBLY COMPLETE WITH STRIP AND
THIMBLES (ORD.) HT/LT NO.
19 M.S CLAMP ASSEMBLY NO.
20 PARALLEL FROVE CONNECTORS T-150 NO.
21 BARBED WIRE KG.
22 GALVANIZED STEEL WIRE 10 MM2 KG.
23 TERMINATION KIT OUTDOOR 1-CORE 240 MM2 SET
24 DANGER PLATE WITH FITTING NO.
COST OF MATERIAL RS.
WAPDA/MEPCO INSTALLATION COST (@ 20%) RS.
11-KV GRID END PANEL, MATERIAL WITH A INSTALLATION
SUB TOTAL (A)
CONTRACT WORK
1 PCC POLES (HT) 36' NO.
2 SPUN POLE (HT) 45' NO.
3 INSTALLATION OF PCC POLE (HT) 36' NO.
4 INSTALLATION OF SPUN POLE (HT) 45' NO.
SUB TOTAL (B)
GRANS TOTAL
COST/UNIT TOTAL COST
91378 0
850 0
2323 0
682 0
149 0
60 0
52 0
18 0
48 0
45 0
130 0
126 0
15 0
15 0
20 0
192 0
247 0
1200 0
100 0
94 0
85 0
109 0
11200 0
150 0
0
16500 0
26000 0
1800 0
3500 0
0
0
Sr. No. Description UNIT QTY
1 ST. STRUCTURE 36' NO. 2
2 HT PCC POLES 36' NO. 5
3 COST OF MATERIAL RS.
7 DISMANTLING CHARGES (10%) RS.
COST/UNIT TOTAL COST
16499 32998
12690 63450
96448
9644.8
Sr. No. Description Qty Unit
2
4-WAY No.
3-WAY No.
HT Cables Aluminium 15-KV Class.
As Per WAPDA Standards
3
1-Core 240 mm2 XLPE/PVC/AWA KM.
3-Core 120 mm2 XLPE/PVC/SWA/PVC KM.
LT Cables Aluminium 600/1000 V
4
4-Core 120mm2 PVC/PVC KM
Termination Kit for HT Cables item 4 Above:
5 HT 1-Core 240 mm2 SET
HT 3-Core 120 mm2 SET
Termination Kits for LV Cables Item 4 Above: with
6 Aluminium Lugs & Bi metalic Lugs
4-Core 120mm2 PVC/PVC SET
Straight Joints for HT Cables: Item 3 Above
7 3- Core 120mm2 XLPE Cables SET
1-Core 240 mm2 XLPE Cables (3x 1-Core) SET
8 HT & LT Cable route markers No.
9 LT Distribution Boxes No.
10 11-KV Earth Fault Indicator No.
Earthing set Complete with accessories for Pad mounted
Transformer, HT Switches and LT Distribution Boxes
11 SET
2275000 0
1870000 0
1150000 0
985000 0
1275000 0
1188000 0
850000 0
2350000 0
942000 0
22200 0
15500 0
6720 0
33600 0
42000 0
900 0
18500 0
30000 0
900 0
150 0
0
Item No. Description Qty Unit
Preparation of foundation for following pad Mounted HT
switches, conforming to requirements, technical
specification, standards, drawings etc: and to the approval
of the consultant
A-1
4-WAY Each
3-WAY Each
Preparation of foundation for following pad Mounted HT
switches, conforming to requirements, technical
specification, standards, drawings etc: and to the approval
of the consultant
A-2
630-KVA Each
400-KVA Each
200-KVA Each
100-KVA Each
Preparation of foundation for LT Distribution Boxes (Service
Box), conforming to requirements, Technical specification,
A-3 standards, Drawings and to the approval of the Each
consultant/WAPDA
Sub Total
Rate Total Price (Rs.)
36000 0
36000 0
42000 0
42000 0
42000 0
42000 0
7200 0
0
Item No. Description Qty Unit
Excavation of every type of trench in any type of soil with
in the project area for laying of HT< Cables, as per
B-1 dimensions given on the drawings, and to the approval of m3
the consultant
RFT
Sub Total
Rate Total Price (Rs.)
42000 0
42000 0
42000 0
2050
0