BOQ for 11-KV SOURCE FEEDER

Poles No.
Description
Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Poles
Spun Poles 36 Feet No.
Spun Poles 45 Feet No.
Conductor
ACSR DOG No.
HT Cables 240 MM SQ. No.
11-KV Line Assembly
1-L No.
2-L No.
7-L No.
10-L No.
16-L No.
21-L No.
23-L No.
Ordinary Stay
HT No.
LT No.
Total
Total 1-L
Sr. No. Description Quantity QTY
(NOS.) NOS. NOS.
1 STEEL CROSS ARM 35
2 X-ARM BRACE 1.25'' X 1/4'' X 2'.8'' 70
3 CROSS ARM STEP BRACE 0
4 DISC INSULATOR 42
5 DEAD END CLAMP 42
6 EYE NUT 5/8'' 42
7 M.S BOLT 1/2'' X 1-1/2'' 70
8 M.S BOLT 5/8''X 10'' 13
9 M.S BOLT 5/8'' X 9'' 13
10 M.S BOLT 5/8'' X 6'' 0
11 D.A BOLT WITH NUTS 510 MM 33
12 D.A BOLT WITH NUTS 305 MM 8
13 M.S CLAMP ASSEM. COMPLETE 3
14 ROUND WASHER 1'' DIA 7/16'' H 70
15 ROUND WASHER 1.75'' DIA 0.693'' H 26
16 SQUARE WASHER 123
17 PIN TYPE INSULATOR 51
18 INSULATOR PIN 51
19 P.G. CLAMPS 2-BOLT TYPE 18
20 D-SHACKLE WITH PIN 0
2-L 7-L 10-L 20-L 21-L
QTY QTY QTY QTY QTY
NOS. NOS. NOS. NOS. NOS. NOS. NOS. NOS. NOS. NOS.
23-L
QTY
NOS. NOS.
Sr. No. Description UNIT QTY
1 CONDUCTOR (HT) ACSR DOG KM.
2 HT CABLES 1-CORE 240 MM2 AL/XLPE M
3 STEEL CROSS ARM NO.
4 DISC INSULATOR NO.
5 DEAD END CLAMP HT NO.
6 ANCHOR SHACKLE NO.
7 G.S EYE NUT 5/8'' DIA NO.
8 G.S BOLT 5/8'' DIA 2'' LENGTH NO.
9 G.S BOLT 5/8'' DIA 10'' LENGTH NO.
10 G.S BOLT 5/8'' DIA 9'' LENGTH NO.
11 D.A BOLT WITH NUTS 510 MM NO.
12 D.A BOLT WITH NUTS 305 MM NO.
13 ROUND WASHER 1'' DIA 7/16'' H NO.
14 ROUND WASHER 1.75'' DIA 0.693'' H NO.
15 SQUARE WASHER NO.
16 PIN INSULATOR NO.
17 INSULATOR PIN NO.
18 STAY ASSEMBLY COMPLETE WITH STRIP AND
THIMBLES (ORD.) HT/LT NO.
19 M.S CLAMP ASSEMBLY NO.
20 PARALLEL FROVE CONNECTORS T-150 NO.
21 BARBED WIRE KG.
22 GALVANIZED STEEL WIRE 10 MM2 KG.
23 TERMINATION KIT OUTDOOR 1-CORE 240 MM2 SET
24 DANGER PLATE WITH FITTING NO.
COST OF MATERIAL RS.
WAPDA/MEPCO INSTALLATION COST (@ 20%) RS.
11-KV GRID END PANEL, MATERIAL WITH A INSTALLATION
SUB TOTAL (A)

CONTRACT WORK
1 PCC POLES (HT) 36' NO.
2 SPUN POLE (HT) 45' NO.
3 INSTALLATION OF PCC POLE (HT) 36' NO.
4 INSTALLATION OF SPUN POLE (HT) 45' NO.
SUB TOTAL (B)

GRANS TOTAL
COST/UNIT TOTAL COST
91378 0
850 0
2323 0
682 0
149 0
60 0
52 0
18 0
48 0
45 0
130 0
126 0
15 0
15 0
20 0
192 0
247 0

1200 0
100 0
94 0
85 0
109 0
11200 0
150 0
0

16500 0
26000 0
1800 0
3500 0
0

0
Sr. No. Description UNIT QTY
1 ST. STRUCTURE 36' NO. 2
2 HT PCC POLES 36' NO. 5
3 COST OF MATERIAL RS.
7 DISMANTLING CHARGES (10%) RS.
COST/UNIT TOTAL COST
16499 32998
12690 63450
96448
9644.8
Sr. No. Description Qty Unit

Pad Mounted Transformer as per WAPDA specification #


P.41:81 ameded to date
630 KVA No.
1
400 KVA No.
200 KVA No.
100 KVA No.
Pad Mounted H.T Switches as per WAPDA Specification

2
4-WAY No.
3-WAY No.
HT Cables Aluminium 15-KV Class.
As Per WAPDA Standards
3
1-Core 240 mm2 XLPE/PVC/AWA KM.
3-Core 120 mm2 XLPE/PVC/SWA/PVC KM.
LT Cables Aluminium 600/1000 V
4
4-Core 120mm2 PVC/PVC KM
Termination Kit for HT Cables item 4 Above:
5 HT 1-Core 240 mm2 SET
HT 3-Core 120 mm2 SET
Termination Kits for LV Cables Item 4 Above: with
6 Aluminium Lugs & Bi metalic Lugs
4-Core 120mm2 PVC/PVC SET
Straight Joints for HT Cables: Item 3 Above
7 3- Core 120mm2 XLPE Cables SET
1-Core 240 mm2 XLPE Cables (3x 1-Core) SET
8 HT & LT Cable route markers No.
9 LT Distribution Boxes No.
10 11-KV Earth Fault Indicator No.
Earthing set Complete with accessories for Pad mounted
Transformer, HT Switches and LT Distribution Boxes
11 SET

GI Wire (10 mm dia) for earthing of Pad mounted


12 Transformerd, HT Switches and LT Distribuition Boxes. (8- KG.
KG) for each earth

Grand Total of HT and LT Material


MEPCO Installation Cost (@20 Percent)
Total Cost
Unit Price (Rs.) Total Price (Rs.)

2275000 0
1870000 0
1150000 0
985000 0

1275000 0
1188000 0

850000 0
2350000 0

942000 0

22200 0
15500 0

6720 0

33600 0
42000 0
900 0
18500 0
30000 0

900 0

150 0

0
Item No. Description Qty Unit
Preparation of foundation for following pad Mounted HT
switches, conforming to requirements, technical
specification, standards, drawings etc: and to the approval
of the consultant
A-1

4-WAY Each
3-WAY Each
Preparation of foundation for following pad Mounted HT
switches, conforming to requirements, technical
specification, standards, drawings etc: and to the approval
of the consultant
A-2
630-KVA Each
400-KVA Each
200-KVA Each
100-KVA Each
Preparation of foundation for LT Distribution Boxes (Service
Box), conforming to requirements, Technical specification,
A-3 standards, Drawings and to the approval of the Each
consultant/WAPDA

Sub Total
Rate Total Price (Rs.)

36000 0
36000 0

42000 0
42000 0
42000 0
42000 0

7200 0

0
Item No. Description Qty Unit
Excavation of every type of trench in any type of soil with
in the project area for laying of HT&LT Cables, as per
B-1 dimensions given on the drawings, and to the approval of m3
the consultant

Back Filling of any type of trench already excavated as per


Item B-1, After laying various cables (HT&LT) including sand
, protective bricks and excavated earth compacted in layers
not exceeding 9 in thick, site cleaning etc. as per drawings,
and to the approval of the
B-2

(a) Sand (Bed and Cover) m3


(b) Bricks (Protection Cover) (3'' Thick) m2
(c ) Excavated earth back filling and compaction m3
Supply, Excavation, Laying, Jointing, Back filling and
compaction of RCC pipes for road crossing of HT, LT cables
as per requirements, Standards, specification and to the
approval of consultant RCC/PVC Pipe
B-3 (a) 6'' Dia

RFT
Sub Total
Rate Total Price (Rs.)

42000 0
42000 0
42000 0

2050
0