You are on page 1of 3
Marking characters on the rating plate are made in a manner that ensures the legibil- ity and durability of the inscriptions for the period of service of the pump. The pump serial number is marked intaglio by impact chiseling out on the dis- charge nozzle flange. The place for application of the serial number is shown in the drawings. A pump rotor rotation indicator arrow is attached on the suction casing. Assembly units and parts of the pump are marked as required in their drawings Spare parts, tools and appurtenances, included in the scope of delivery, bear marks (or identified with affixed tags) with drawing designation. The tie bolts of the pump as well as ports of the suction and discharge nozzles are provided with seals. : Type, number of seals and places where they are to be affixed are specified in the technical documentation. Preservation and Packaging Prior to proceed to packaging, all the bare (unpainted) rust-prone metallic parts and assembly elements of the pump, spare parts, tools, appurtenances and acces- sories have been preserved for the period of their transportation and storage ac- cording to [OCT 9.014-78: 1) parts located inside the pump casing (except mechanical seals) and bear- ings: as per variant of protection B3-1 (with slushing oil K-17 TOCT 10877-78), variant of internal packaging BY-9; 2) exposed bare (unpainted) machined surfaces of parts, which project out of the pump casing, bearings and counter flange for suction nozzle: as per variant of protection B3-4 (with gun grease according to [OCT 19537-83), variant of internal packaging BY-4; spare parts supplied along with the pump (except O-rings of rubber and seal rings of graphite): as per variant of protection B3-4 (with gun grease ac- cording to TOCT 19537-83), variant of internal packaging BY-5, ) rubber rings are strewed with milled tale of grade TPIIB TOCT 19729-74, variant of internal packaging BY-5; ‘tools and devices supplied along with the pump: as per variant of protection B3-4 (with gun grease according to [OCT 19537-83), variant of internal kaging BY-4; eal rings of graphite are not to be preserved. Variant of internal packaging graphite rings BY-1 = the preservation, ports of the suction and discharge nozzles as well as all penings and connecting flanges have been blanked off with blind flanges > shipment to the Customer, the pump unit, accessories, spare parts, spurtenances as well as technical documentation have been packaged. caging of the pump, fluid coupling, pressure lubrication installation, assemblies removed for the period of transportation is of category ding to [OCT 23170-78. driver as a component of the pump unit is preserved and packaged ed in its technical documents of supply. ing along with the preservation protect the products against me- damages and precipitation as well as ensure their safety for the trans- and storage period. when a flanged joint in the hot water pipeline is burst; - pump vaporization; - aseal failure of the pump; an accident. Holding the Motor Pump Unit For a Standby Duty 7.3.1 The pump unit is considered as a standby one, if after the last stopping neither its assembly elements have been dismantled, nor the pipelines and valves have been disjoined. 7.3.2 In case of holding the pump unit in the standby condition for a long perjod of time it is necessary: - to close all the valves, gate valves and cocks in the pipelines; - to proceed to a trial start of the pump unit not less than once a fortnight. While doing that, check the functioning of the instrumentation. 74 Placing the Motor Pump Unit Out of a Standby Duty In order to carry out routine inspections, eventual repairs and elimination of re- vealed defects, the pump unit shall be put out of standby. For this,muqnase it is necessary” to disconnect the motor from the mains; - to close the gate-valves in the suction and delivery pipelines and in the mini- mum flow discharge pipe; - to close the valves and cocks for manometers; to draw off handled product from the pump; to remove instruments and detectors from the motor pump unit; - to shoot troubles found during the operation; - to open the bearings (if required) and to apply a thin coat of rust preventive to the shaft journals; - to give (if required) a thin coat of rust preventive compound to all the ma- chined and unpainted surfaces. PH17.061.000.00-25 NC ee ee 2

You might also like