Scada Control Room: EFS-A1 EFS-B1

This document provides a diagram and details of the communication network for a SCADA control room. It shows routers, media converters, fiber optic cables and other network equipment connecting the control room to remote access centers and substations. Communication between devices occurs over IEC 60870-5-104 protocol.

Uploaded by

Prem Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
966 views1 page

Scada Control Room: EFS-A1 EFS-B1

This document provides a diagram and details of the communication network for a SCADA control room. It shows routers, media converters, fiber optic cables and other network equipment connecting the control room to remote access centers and substations. Communication between devices occurs over IEC 60870-5-104 protocol.

Uploaded by

Prem Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

COMMUNICATION LINK /CHANNEL ON IEC-60870-5-104

(NOT IN GE SCOPE) SCADA CONTROL ROOM *EXISTING CONTROL ROOM


TO SLDC
ON IEC-60870-5-104 TO REMOTE ACCESS CENTER
$$
GSM
EQUIPMENT

ROUTER-1 ROUTER-2
=NWPM1 =NWPM2
10.22.91.14 RJ45 TO FO
ON IEC-60870-5-104 MEDIA CONVERTER
=NWPM1
10.22.91.04 LIU-OWS-B
=NWPM1 10.22.91.200 =NWPM1 =NWPM2 =NWPM1 10.22.91.14 =NWPM2 10.22.91.15
=NWPM1 10.22.91.05 10.22.91.01 10.22.91.02 =NWPM1 10.22.91.03 ARMORED FO CABLE

10.22.91.06 =NWPM1 10.22.91.07 =NWPM2 LIU-OWS-A

RJ45 TO FO
10.22.91.11 MEDIA CONVERTER

=NWPM2 10.22.91.10

** =NWPM1**
LIU-S LIU-S
=NWPM2 EFS-A1 10.22.91.21 =NWPM2 =NWPM2 **
**
LIU-S LIU-S
=NWPM2 EFS-B1 10.22.91.22 =NWPM2

C & R PANEL ROOM


EFS-A2 10.22.91.31 EFS-A3 10.22.91.32 EFS-A4 10.22.91.33
LIU-A1 LIU-A2
=2R1AM =2R1AM =2R4AM =1R8M =1R8M
EFS-B2 10.22.91.34 EFS-B3 10.22.91.35 EFS-B4 10.22.91.36
LIU-B1 LIU-B2
=2R1BM =2R1BM =2R4BM =1R10M
ICT-2 =1R10M
ICT-1 BUSBAR 1R8M BAY-108
2R1AM/2R1BM BAY-201 2BBM BCU
C264
BCU
C264 87BRY B90

10.22.91.59 10.22.91.68
EM
10.22.91.51 87BB B90 67/67N
P141
87T1 P643 10.22.91.60 10.22.91.69
10.22.91.52 87BLU B90
87T2 T60 10.22.91.61
ICT-1
10.22.91.53 1R10M BAY-110
BCU
C264

AREEKODE KANIAMPETTA 10.22.91.70

2R2AM/2R2BM BAY-202 2R4AM/2R4BM BAY-204 67/67N


P141
BCU BCU 10.22.91.71
C264 C264

EM EM
10.22.91.54 10.22.91.62

87L1 P543
87L1 P543
10.22.91.63
10.22.91.55
87L2 L90
87L2 L90 10.22.91.64
10.22.91.56
ICT-2
2R5AM/2R5BM BAY-205
BUS COUPLER BCU
C264
2R3M BAY-203
BCU EM
10.22.91.65
C264 87T1 P643
10.22.91.57 10.22.91.66
87T2 T60
50/51N P141
10.22.91.67
10.22.91.58

CUSTOMER : KERALA STATE ELECTRICITY BOARD LTD.


LEGEND:-
CONTRACTOR : GE T&D INDIA LTD.
MULTIMODE FIBER OPTIC PATCH CORD (LINK-A)
PROJECT : 220 kV GIS PACKAGE 1- KALOOR / ALUVA / KUNNAMANGALAM
RING ON IEC 61850 PRP PROTOCOL GPS: GLOBAL POSITIONING SYSTEM SUB-STATION : 220/110kV KUNNAMANGALAM GIS S/S
MULTIMODE FIBER OPTIC PATCH CORD (LINK-B) LJP: COLOUR LASERJET PRINTER PO. NO. : 5427-4500980364
RING ON IEC 61850 PRP PROTOCOL
MULTIMODE FIBER OPTIC PATCH CORD EFS: ETHERNET FIBRE SWITCH DATED : 29/06/2018

FOR BUSBAR PROTECTION B90 $$NOTE: SYSTEM ARCHITECTURE DRAWING


LIU: LINE INTERFACING UNIT 1. POWER SUPPLY WILL BE TAKEN FROM EXISTING 1-PHASE 230V AC. TITLE : OVER-ALL ARCHITECTURE DRAWING OF SAS

g
ARMOURED MULTIMODE FIBER OPTIC CABLE FOR LAN-A
BCU: BAY CONTOL UNIT
ARMOURED MULTIMODE FIBER OPTIC CABLE FOR LAN-B B SECOND ISSUE 06.09.19 GE T&D India Ltd.
ETHERNET LINK (RJ45-CAT6) EM: ENEGRY METER A FIRST ISSUE 24.06.19 (Formerly Alstom T&D India Ltd.)
REV DESCRIPTION DATE
Grid Automation-Pallavaram India
COAXIAL CABLE (GPS ANTENNA LINK) OWS: OPERATOR WORKSTATION
ENGG.REF.NO. : KY2G PREPARED BY : MP SCALE: - DRG. REF.: KY2G-SA3
RS485 CABLE **LIU-S: 24 PORT, 1No. MOUNTED IN NWPM2 PANEL CHECKED BY : ACS
SALES ORDER NO : 3269048167 FILE : KY2GSA3 APPROVED BY: SSS SHT 1 OF 1 DATE: 06.09.2019 REV: B

LEGEND:-
SYSTEM ARCHITECTURE DRAWING
APPROVED BY:
DRG. REF.:
PREPARED BY :
DATE:
SCALE:
TITLE                 :
PO. NO.