Check the supports of cables and ties are adequate and spacing as per in
4 the approved typical instalaltion drawings
5 Cable identification /tags fitted as per the approved drawings ✘
✘
6 Verify that no obvious damage to outer shealth and conductors.
Verify the approved installation procedure follows for the installation of Direct
8
buried cables .
Verify the Earth conductors are properly tagged and tied as per the approved ✘
11