CALCULATION OF SHAFT ALIGNMENT
K C KIM
8 SCALE DRAWING NO
DRAWN SUNG-GEUN PARK
8R-2820-208-100
A
HYUNDAI HEAVY INDUSTRIES CO LTD
ULSAN SHIPYARD KOREA
CONSOLIDATED NO FM-1O
~B-C300-101 A4 (2I0MMX297MM)
n/s n/H A4
l630/l IG7I/2
SHIP NO -
A PLAN HISTORY DWG. NO. 8R-2820-208
REV.
DATE MARK
DESCRIPTION BY ;HECKED PPROVED
NO. (A) BY BY
ORI 05-04-13 ORIGINALLY PREPARED FOR SHIP NO 1630/1, 1671/2, 1699-1701, 1733. K. C. KIM J. G. KIM
A) BEFORE LAUNCHING
1. AFTER BORING THE STERN TUBE , FIT THE AFT/FWD BUSHES INTO THE PROPELLER
BOSS CASTING.
4 CHECK THE GAP / SAG BETWEEN PROPELLER SHAFT FLANGE AND AFT INTER SHAFT
FLANGE BY ADJUSTING NO 3 INTER SHAFT BEARING AND TEMPORARY JIG HEIGHT.
B) AFTER LAUNCHING
I . INSERT CHOCK LINERS FOR INTERMEDI ATE SHAFT BEARI NG AND TI GHTEN THE
FOUNDATI ON BOLTS AFTER TESTI NG THE LOADS OF I NT. SHAFT. BEARI NG.
2. CONFIRM THE SHAFT ALIGNMENT BY MEANS OF JACK UP TEST ON
THE INTERMEDIATE SHAFT BEARINGS AT AFLOATING/COLD CONDITION
SHOWN ON DRAWING P A G E j H O . , IN THE ATTENDANCE OF SHIP OWNER AND CLASS.
3. IF THE CONVERTED BEARING LOAD BASED ON JACK UP LOAD ARE NOT WITHIN
THE TOLERANCE, THE INTERMEDIATE SHAFT BEARING HEIGHT TO BE ADJUSTED
BY SCRAPING THE CHOCK LINER OR INSERTING SHIM PLATES.
PROPELLER
SHAFT
ca
o
o
TANK TOP
CO
1. HEIGHT OF BEARINGS(H)
-INTER BEARING SEAT (HI) : 1255 M
-INTER BEARING BODY (H2) : 655 \
-MAIN ENGINE SUMP TANK (H3) : 1134
-MAIN ENGINE BODY (H4) : 1800
AW -- C X H X ( T2 - TI ) ( MM )
WHERE,
C : COEFFICIENT OF THERMAL EXPANSION ( I°C )
-STEEL (BEARING SEAT) : 1.075 X I0E-05
-CAST IRON (INT. BRG BODY ) : 1.02 X IOE-05
-MAIN ENGINE BRG : 4.6 X IOE-06
T2 : TEMPERATURE AT HOT CONDITION (°C)
TI : TEMPERATURE AT COLD CONDITION X) SHIP NO. DWG NO. PAGE
H : HEIGHT OF BEARING 1630/1,1G71/2
8R-2820-208
1699-1701,1733
HSFB-C300-40Z-2 A4 (210X297] tt>l»l
SHIP NO. HDS NO.
INTER BRG SEAT INTER BRG BODY M/E SUMP TANK M/E BODY
TEMP f t ) 25 35 55 55
0 MM DOWN
>•
M/E (AFT MOST)
: 0 48 MM DOWN 0u c o
: 0 35 MM DOWN 10°C
OF S / T BUSH
oc C 1.0 M M DOWN •55 MM DOWN
oc C 0 7 U M DOWN : 0.21 MM DOWN 20 °C o
10° C 0.87 A/ M DOWN IO°C ! . 4 2 M M DOWN 10° C 0. 57 n M DOWN -n
0.12 MM DOWN : 0.07 MM DOWN 30 °C
20'X 0 . 7 4 AiIM DOWN 20° C .29 DOWN 20 5C 0. 4 4 K 4M DOWN WITH SLANTED -2.23 X I 0 " 4 RAD en
3OC3C 0.61 MM DOWN 30° C .16 MM DOWN 30 3C 0. 31 M M DOWN 33
>•
o°c
1.2 MM DOWN Ti
•H
10° C 1.07, MM DOWN- co
20e C 0.94 Mb1 DOWN
30e C 0.81 M DOWN
DETAIL "A" rn
^ co
r o ^ j
o O
<=> O
OJ ro
•z.
DOWN
%
C3 o CD
CD
CD
S S
s
<r> u-> r-~
ÖJ O
<o <O O
CD
o O
CJ>
o o
O
O C5
H31NI CON
0.94MM DOWN
1.07 MM DOWN
0.81 MM DOWN
en
CD
<c CD "
—1 r O
Ll_
CD C3
OJ
\ 20N
_J CJ> CJ> o
Q_ C3 o 0
>
") o C3 CNJ r-O
o O
C 'S
CD o o>
cr> CO
CD
CJ
o o
o
05
831NI CON
CO
630/1,1671/2
1G39 1701.1733 ^R-2820-208
HSFB-C3OO-4O2-2 A4 1210X297) V=t»l
JACK UP METHOT^FOR NO.3 Ö NO.2 INT. BEARING
AFLOATING CONDITION PROPELLER HALF IMMERSED
l>
POSITION OF HYP. JACK
NO.2 INT. BRG. O
CO
o
-n
en
CO
3) CALCULATION OF BEARING LOAD
2) MEASURE OF HYDRAULIC JACK LOAD -a
THE BEARING LOAD CAN BE CALCULATED FROM THE o
THE JACK LOAD CORRESPOND TO KNUCKLE FOLLOWING EOUAITION USING THE HYDRAULIC JACK LOAD.
POINT AS SHOWN IN FOLLOWING GRAPH
WHERE, R : BEARING LOAD rn
ACK LOAD .;:,R = K X J
K : CORRECTION FACTOR
J : JACK LOAD
DATE
o
4-1) CORRECTION FACTOR -- 4-2) CORRECTION FACTOR CO
>
o
DESIGNED BEARING LOAD CORRECT. DESIGNED BEARING LOAD CORRECT
\ TEMP k FACTOR
-JOU- FACTOR
NO 3
0°C 207 + 45 21.1 + 4. 6 N0.2 269 + 5 0 27.4±5.
INTER IO°C 209 ±45 21.3 ±4. 6 0.989 y INTER IO°C 268 ±50 27.3+5.
INDICATION OF DIAL GAUGE 0.968
SHAFT 20°C 210 + 45 21.4 + 4.6 SHAFT 20°C 267 ±50 27.2+5.
JACK LOAD " J " = Jmox + Jmm BEARING BEARING
2 30°cl ,212 + 45 21.6 ±4. 6 L266 +50 27.1 +5.
JACK UP METHOD FOR NO.I INT. BEARING 1>
POSITION OF HYD. JACK AFLOATING CONDITION PROPELLER HALF IMMERSED
NO.I INT. BRG. FWD INTER. SHAFT
QD
0 •©.
710
2655 4840
CO
''•• ^ C A L C U L A T I O N OF BEARING LOAD
2) MEASURE OF HYDRAULIC JACK LOAD
- THE BEARING LOAD CAN BE CALCULATED FROM THE
THE JACK LOAD CORRESPOND TO KNUCKLE '"FOLLOWING EQUAITION USING THE HYDRAULIC JACK LOAD.
POINT AS SHOWN IN FOLLOWING GRAPH
R = K XJ WHERE, R : BEARING LOAD
JACK LOAD
K : CORRECTION FACTOR
J : JACK LOAD
DATE
4) CORRECTION FACTOR o
CO
r-
o
c
r™
>•
o
2 - 20 KNOCK
PIN HOLES
( P a S ) o
rn
CD
Ö >•
•n
CO
rn
CO
<-o0 VIEW "H-H"
DATE
o
CO
CO X-Y : CENTER LINE OF STERN TUBE CASTING INNER DIAMETER E : ECCENTRICITY DUE TO THE DEFLECTION o
I
( BORING CENTER LINE ) OF PROPELLER SHAFT ACCORDING TO
co
ro
<O SHAFT ALIGNMENT ( = 0.54 MM )
I
ro I-J : CENTER LINE OF FWD SEAL CASING P.CD. OF SECURING
co
BOLT AFTER FINISHING THE SHAFT ALIGNMENT .
Ship No. 1630/1, 1671/2 only
Vertical plane
A positive moment turns clockwise at the forward end.
A positive shear force points upward at the forward end.
**** A sign is contrary to page 6, 7 & 8. ****
ELEMENT DISTANCE DEFLECTION SLOPE MOMENT STRESS SHEAR FORCE
******* ******** ********** ***** ****** ***********
[m] [mm] [rad] [Nm] [N/mm2] [N]