General Information
Show Name: Heiress
Organization: IU Ruth N. Halls
Estimate by: M. Hapeman Construction Period
Material Budget: $ 3,500.00 Start Date: Aug. 27, 18
Contingency: 10% added to each unit Est. End: Sept. 14, 18
Shop Time: 360 $21.00 Hr.Rate
Time Contingency: 1.54 added to each unit
* 1.540
Sub-Total: $ 120.28
Contingency: $ 12.03
Total: $ 132.31
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 159.44
Contingency: $ 15.94
Total: $ 175.38
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Carp Time
Current Cost: $ 266.42
Call Name Materials Unit Unit Price Quantity Cost
Pine1x4x16 1x4x16', #2 Pine Window 16' $5.89 2 11.78
MDF 1/4" 1/4" MDF 49"x97" Window Sht. $10.80 1 10.80
SPF2x4x16 2x4x16', SPF Stud Window 16' $4.59 2 9.18
Molding on Page 16
Sub-Total: $ 242.20
Contingency: $ 24.22
Total: $ 266.42
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 243.08
Contingency: $ 24.31
Total: $ 267.39
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 652.94
Contingency: $ 65.29
Total: $ 718.23
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 166.31
Contingency: $ 16.63
Total: $ 182.94
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 83.13
Contingency: $ 8.31
Total: $ 91.44
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 133.16
Contingency: $ 13.32
Total: $ 146.48
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 44.77
Contingency: $ 4.48
Total: $ 49.25
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 164.14
Contingency: $ 16.41
Total: $ 180.55
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 292.16
Contingency: $ 29.22
Total: $ 321.38
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 35.97
Contingency: $ 3.60
Total: $ 39.57
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Current Cost: $ -
Call Name Materials Unit Unit Price Quantity Cost
Sub-Total: $ -
Contingency: $ -
Total: $ -
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Current Cost: $ -
Call Name Materials Unit Unit Price Quantity Cost
Sub-Total: $ -
Contingency: $ -
Total: $ -
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
Sub-Total: $ 175.09
Contingency: $ 17.51
Total: $ 192.60
Technical Production Technology
IU Department of Theatre, Drama, and Contemporary Dance
* 1.540
MDF 1/2" 1/2" MDF; 48" x 96" G-176 Sht. $24.87 1 24.87
Sub-Total: $ 868.27
Contingency: $ 86.83
Total: $ 955.10
Materials List Quantity Unit Price Cost Unit
Mastercraft® 11/16 x 3-1/4 x 16' Pine Colonial Casing 444 4 $ 8.89 $ 35.56
Mastercraft® 11/16 x 1-3/8 x 8' Pine Base Cap Moulding
163 14 $ 7.05 $ 98.70
1x6x16', #2 Pine 9 $ 7.38 $ 66.42
1/2" MDF; 48" x 96" 4 $ 24.87 $ 99.48
Bobbinette 3 $ 38.17 $ 114.51 Yd.
Mastercraft® Traditional 2-3/8" x 2-1/4" x 8' Ready-to-
Finish Oak Stair Handrail with Fillet 2 $ 43.86 $ 87.72
CELLOFOAM CUSTOM PROFILE 80
1/4" MDF 49"x97" 43 $ 10.80 $ 464.40 Ft.
OUTWATER CR-108 2 $ 141.46 $ 282.92 Sht.
3/4" BC Plywood 10 $ 32.98 $ 329.80
OUTWATER CR-10SCA 2 $ 165.85 $ 331.70 Sht.
3/4" MDF; 49" x 97" 15 $ 28.93 $ 433.95
1x4x16', #2 Pine 64 $ 5.89 $ 376.96 Sht.
Grand Total 381 $ 1,235.40 $ 3,325.38