You are on page 1of 80
“RULES FOR BUILDING AND (area cy SINGLE POINT MOORINGS © MISSION. The wission of te American Burau of Shipping ‘sto sere the public interest as crllas he nea of our clients by prnuotng the ecwity of Bf, property andthe nauumbeneinnment primarily through the devslopment and wrifleton of stones for te design, construction and operational maintenance of marine rated fds. 6——~ QUALITY POLICY 11s the pti of the American ‘ur of Shipping to proce quedity sevice i support of curmisciont nd tobe respi tote iad and eolectie neoksof orden as onl as ths ofthe publi a a of urclen commatents supporting actos, card services deliened ineust be recognized as expressions of quality, 11 pledge to meritr ou performance Asan ongoing acti and to tie for connuonsinprotnent SABS Rules for Building and Classing Single Point Moorings 1996 American Bureati of Shipping Incorporated by the Legislature of the State of New York 1862 Copyright © 1996 ‘American Bureau of Shipping ‘Two World Trade Center, 106th Floor New York, NY 10048 U.S.A. & FOREWORD Jn 1993, ABS initiated a project to update the 1975 Rules for Building and Classing Single Point Moorings to reflect current design practice. A four Part format has been adopted for these Rules for the convenience of the user. A comparison of new versus old Section are as follows: 1995 Section No. Description 1975 Section No. Classification, Testing aid Surveys Parl Section 1 ‘Scope and Condition of Classification 1 Parti Section 2 Testing During Construction 5,7, 10 & New Partl Section 3 Surveys after Construction 10 & New Partl Section 4 Definitions 2&New ‘Materials and Welding Part2 Section 1 Materials 1 Part2 Section? ‘Welding and Fabrication 9.1-9.7 & New Part2 Section 3 Weld Design 9.9-9.15 & New Mooring System Design Part3 Section 1 Site and Environmental Conditions 3&New Part3 Section 2 Design Loads 4&New Part3. Section3 ‘Structural Design and Stability 5 & New Part3 Section 4 ‘Mooring and Anchoring 6 Equipment and Systems Part4 Section 1 Cargo or Product Transfer Systems 7 Part4 — Section 2 Ancillary Systems and Equipment 89 Part4 Section 3 Hazardous Areas and Electrical Installations 8.5 & New Part4 Section 4 Safety Provision 8.1, 8.3, 8.7 & New Current industry practice has been reflected by inclusion of requirements for tower moorings, SALM Systems, rigid yokes and gravity boxes, Cargo/Product Transfer System requirements have been enhanced for hoses, flexible risers, bearings, swivels, PLEMS, etc. Other significant changes include: Mooring leg factors of Safety have been revised based on criticality of operation and results of associated damage due to failure, Section 1/3: ‘New requirements for annual survey have been introduced, ‘Section 3/1: Site conditions have been modified, Section 3/2: Additional guidance has been provided regarding environmental loading Contents Part 1 Classification, Testing and Surveys Secrion 1 Scope and Conditions of Classification 2 Testing During Construction 3 Surveys After Construction 4 Definitions Part? Materials and Welding SecTION 1 Materials 2 Welding and Fabrication 3 Weld Design Part 3 Mooring System Design SzcTio 1 Site and Environmental Conditions 2 Design Loads 3 Structural Design 4 ‘Mooring and Anchoring Part4 Equipment and Systems SECTION 1 Cargo or Product Transfer Systems 2 Ancillary Systems and Equipment 3 ‘Hazardous Areas and Electrical Installdtions 4 Safety Provisions Part 1 Classification, Testing and Surveys PART 1 SECTION 1 - Scope and Conditions of Classification via Classification U1 Process (1 Jan. 1996) _ ‘The Classification process consists of a) the development of Rules, Guides, Standards and other criteria for the design and construction of marine vessels, materials, equipment and machinery, b) the review of design, and survey during and after construction to verify compliance with Such Rules, Guides, Standards or other criteria and c) the assignment and registration of class when such ‘compliance has been verified and d) the issuance of a renewable class certificate, with amual endorsements, ‘Valid for five years. ‘The Rules and Standards are developed by Bureau staff and passed upon by committees made up of naval architects, marine engineers, shipbuilders, engine builders, steel makers and by other technical, ‘operating and scientific personnel associated with the ‘worldwide maritime industry. ‘Theoretical research and development, established engineering disciplines, as well as satistactory service experience are utilized in their development and promulgation. The Bureau and its committees can act only upon such theoretical and practical considerations in developing Rules and Standards. 411.2 Certificates and Reports (1 Jan. 1996) Plan review and surveys during and after construction are conducted by the Bureau to verify to itself and its committees that a Single Point Mooring (SPM) structure, item of material, equipment or machinery is in compliance with the Rules, Guides, Standards or other criteria of the Bureau and to the’ satisfaction of the attending Surveyor. All reports and certificates are issued solely for the use of the Bureau, its committees, its clients and other authorized entities. 1b The Bureau will release information from reports and certificates to the Port State to assist in rectification of deficiencies during port state control intervention. Such information’ includes text of conditions of classification, survey due dates, and certificate expiration dates. The owner will be advised of any request and/or release of information. © The Bureau will release certain information to the SPM’s underwriters and Pél clubs for underwriting Purposes. Such information includes text of overdue conditions of classification, survey due dates, and certificate expiration dates. The owners will be advised of any request and/or release of information. In the case of overdue conditions of classification, the ‘owners will be given the opportunity to verify the accuracy of the information prior to release. PART, SECTION tI W113 Representations as to Classification Classification is a representation by the Bureau as to the structural and mechanical fitness for a particular use oF service in accordance with its Rules and Standarés. "The Rules of the American Bureau of Shipping are, ot meant a te for the independent judgment of professional designers, naval architects, Trine engineer, fovmers, operators, masters and crew nor as a substitute for the quality control procedures of bull or buoy builders, engine builders, steel makers, suppliers, manufacturers and sellers of hulls or buoys, materials, machinery or equipment. The Bureau, being a technical society, can only act through Surveyors or others who are believed by itto be skilled and competent, ‘The Bureau represents solely to the SPM Owner or other client ofthe Bureau that when asaniag Sse tl eee ddue diligence in the development of Riles, Guides and Standards, and in “using” normally applied testing standards, procedures and techniques as called for by the ules, Gules, Standards orotic etter ofthe Beas for the purpose of assigning and maintaining class. ‘The Bureau further represents to the SPM Ownet or other client of the Bureau that its certificates and reports evidence compliance only with one or more of the Rules, Guides, Standards or other criteria of the Bureau in accordance with the terms of such certificate or report. Under no cizcumstances whatsoever are these representations to be deemed to relate to any third party VLL4 Scope of Classification Nothing contained in any certificate or report is to be deemed to relieve any designer, builder, Owner, manufacturer, seller, Supplier, repairer, operator, other entity or person of any ‘warranty expressed or implied. Any certificate or report evidences compliance only with fone or more of the Rules, Guides, Standards or other titeria of the American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. Nothing cootainied in any certificate, report, plan or document review or approval is to be deemed t0 be in any way a representation or statement beyond those contained in 1/1.1.3. The validity, applicability and interpretation of any certificate, report, plan or Teview or approval are governed by the Rules and Standards of the American Bureau of Shipping ‘who shall remain the sole judge thereof, The Bureau is not responsible for the consequences arising from the use by other partes of the Rules, Guides, Standards or other criteria of the American Bureau of Shipping, without review, plan approval and survey by the Bureau ‘The term "approved" shall be interpreted to mean that the Plans, reports or documents have been reviewed for ‘Scope and Conditions of Classification compliance with one or more of the Rules, Guides, Standards, or other criteria of the Bureau. ‘The Rules are published on the understanding that responsibility for operation, reasonable handling and loading, as well as for avoidance of distributions of loads which are likely to set up abnormally severe stresses in ‘SPM does not rest upon the Committee. VL2 Suspension and Cancellation of Class (Jan. 1996) W121 Termination of Classification ‘The continuance of the Classification of any SPM is conditional upon the Rule requirements for periodical, damage and other surveys being duly carried out. The Commitee reserves the right to reconsider, withtold, (of cancel the class of any SPM or any part of machinery for noncompliance withthe Rules, fc defects reported by the Surveyors which have not been rectified in accordance with their recommendations, or for nonpayment of fees which are due on account of classification and other surveys. Suspension or cancellation of class may take effect immediately or ater a specified period of time. W122 Notice of Surveys It is the responsiblity of the owner to ensure that all surveys necessary for the maintenance of class are carried gutat the roger ime, The Buea wl ge prope oie to an owner of upcoming surveys. ‘This may be done means of a letter, a quarterly vessel status or other communication. The non-receipt of such notice, however, does not absolve the owner from his responsibility to comply with survey requirements for maintenance of 112.3 Special Notations If the survey requirements related to maintenance of special notations are not carried out as required, the suspension or cancellation may be limited to those special notations only. W124 Suspension of Class Includes: @ Class is suspended for any use, operation, loading condition or other application of any SPM for which it hhas not been approved and which affects or may affect classification or the structural integrity, quality or fitness for a particular use or service. If the periodical surveys required for maintenance of class are not carried out by the due date and no Rule allowed extension has been granted, class will be suspended. © If recommendations issued by the Surveyor are not carried out within their due dates, class will be suspended. d Class is suspended for any failure deterioration or rep hat has not beck Sapa recommended, If proposed repairs as referred to in 1/1.15.1 have not ‘been submitted to the Bureau and agreed upon prior to ‘commencement, class may be suspended, 1125 — Cancellation of Class a Ifthe circumstances leading to suspension of class are not corrected within the time specified, the SPM’s class will be canceled. b An SPM’s class is canceled immediately when an SPM resumes operation without having completed recommendations which were required to be dealt with before resuming operations. U3 Class Designation 1/1.3.1 Single Point Moorings Built Under Survey PM's which have been built under the supervision of the Surveyors of the Bureau to the requirements of these Rules or to their equivalent, where approved by the Classification Committee, will be classed and distinguished in the Record by the symbols © Al Single Point Mooring. This document is mainly applicable to SPM systems which are designed for temporarily moored vessels. For vessels which will be permanently moored to a SPM, the ABS "Guide for Building and Classing Floating Production and Storage Systems" applies. Data as described in 1/1,3.4 will be indicated in the record. W132 Single Point Moorings Not Built Under Survey SPM’s which have not been built under the supervision of the Surveyors to the Bureau, but which are submitted for classification, will be subject ‘to a special classification survey. Where found satisfactory, and thereafter approved by the Classification Committee, they will be classed and distinguished in the Record in the manner as described as in 1/13.1 but the mark "»" signifying the survey during construction will be omitted. VL3.3 Single Point Mooring as a Part of a Floating Production System ‘SPM's built under survey for use as part of the mooring system for a classed floating production system do not equire a separate classification under these Rules, Requirements for mooring systems of floating production systems are found in the ABS "Guide for Building and Classing Floating Production, Storage and Ofloading Systems" PART 1, SECTION 12 Scope and Conditions of Classification ¢ 4134 — Classification Data ° Data on single point moorings will be published in the Record as to the latitude and longitude of the location of the mooring, the length overall and displacement of the ship it is designed to moor, the depth of water at the site, maximum hawser tension where applicable, and general types of cargo and other fluids which the mooring is designed to handle. WLS Rules For Classification VALS.1 Application of Rules These Rules are applicable to unmanned SPM’s as defined in Section 1/4 and are generally intended for temporary moored vessels. ‘These Rules are applicable to those features of the system that are permanent in nature and can be verified by plan review, calculation, physical survey or other appropriate ‘means. “Any statement in the Rules regarding other features is to be considered as a guidance to the designer, builder, owner, et al VLS2 Alternatives ‘The Committee is at all times ready to consider alternative arrangements and scantlings which can be shown, through either satisfactory service experience or a systematic analysis based on sound engineering principles, to meet the overall safety and strength standards of these Rules. The Committee will consider special arrangements or details of buoyant structures, equipment, or machinery which can be shown to comply swith standards recognized in the country in which the SPM is registered or built, provided they are not less effective VLS3 Novel Features SPM’s with novel features of design in regard to ‘buoyancy, structural and mooring arrangements, machinery, equipment, permanent manning, etc, t0 which these Rules are not directly applicable, may be classed when approved by the Committee on the basis that these Rules, insofar as applicable, have been complied ‘with and that special consideration lhas been given to the novel features, based on the best information available at 3¢ time, ULS.4 Effective Date of Rule Change a) Six Month Rule Changes to these Rules are to become effective six (6) months from the date on which the Technical Committee approves them. However, the Bureau may bbring into force individual changes before that date if necessary or appropriate ¥) Implementation of Rule Changes In general, the Rules in effect will apply unless application of new Rules before their effective date is specifically requested by the party signatory to the application for classification, Where designs for one or more SPM’s comply with the Rules applicable at the time of approval, no retroactive application of later Rule changes to such SPM's will be required unless necessary or appropriate, W155 Other Conditions ‘The committe reserves the right to refuse classification of| any SPM where items for which there are Rule requirements are found not in accordance with the Rules, V1.7 Other Regulations W171 Governmental and Other Regulation While. these Rules cover the requirements for the classification of new SPM’s, the attention of Owners, builders, and designers is directed to various governmental regulations which control _ stability, structural, machinery, and electrical features, particularly in hazardous areas’ where gas may be’ present of accumulate, Other considerations may include the arrangement and extent. of watertight bulkheads and decks, fire-retarding bulkheads, the acceptability of watertight and weathertight closures, ventilation, and means of escape. 1/1.72 Governmental Regulations Where authorized by a government agency and upon request of the Owners of a classed SPM or one intended to be classed, the Bureau will survey and certify a new or existing SPM for compliance with particular regulations of that government on its behalf. V9 —_IACS Audit The International Association of Classification Societies (ACS) conducts audits of process followed by all its member societies to assess the degree of compliance with the TACS Quality System Certification Scheme requirements. For this,purpose, auditors from LACS may accompany “ABS pefsonnel “at, any stage of the classification or statutory work which may necessitate the auditors having access to the SPM installation or access to the premises of the manufacturer or the fabricator. such instances, prior authorization for the auditors ‘access will be sought by the local ABS office. WLI1 Plans and Design Data to be Submitted wVidL1 Plans Plans showing the scantlings, arrangements, and details of the principal parts of the structure, associated piping and ‘equipment of each SPM to be built under survey are to be submitted for review and approved before construction is commenced. These plans are to clearly indicate the scantlings, joint details and welding, or other methods of connection. The number of copies to be submitted is to be ParT 1, SECTION 13 Scope and Conditions of Classification in accordance with 1/1.11.6 and UJ.11.7. In general, plans are to include the following where applicable. General arrangement An arrangement plan of watertight compartmentation, including the location, type and disposition of watertight and weathertight closures Structural arrangement showing shell plating, framing, bulkheads, flats, main and bracing members, joint details, as applicable Details of watertight doors and hatches Welding details and procedures Corrosion control arrangements ‘Type, location and amount of permanent ballast, if any Bilge, sounding and venting arrangements Hazardous areas Electrical system one line diagrams Location of fire safety equipment ‘Mooring arrangement Mooring components including anchor legs, associated hardware, hawser(5), and hawser _load-deflection characteristics Foundations for mooring components, industrial equipment, etc. showing attachments to hull structure Anchoring system showing the size of anchor, holding capacity of piles, pile sizes, and eapacity, ete. Pipe Line End Manifold (PLEM) as applicable SPM main bearing Cargo. or product swivel including swivel driving mechanism, swivel bearings, and electrical swivel details Product or cargo system piping schematic drawing with bill of materials, Design data of equipment, piping and related components including minimum and maximum design pressure and temperatiie Ancillary piping systems schematic drawings with bills of material Floating and underbuoy hoses/flexible risers Telemetry/Control system ‘Navigation aids ‘Methods and locations for non-destructive testing (NDT) Plans for conducting underwater inspections in lieu of dtrydocking ‘Test and inspection plan for all major load carrying or pressure retaining components including cargo or product swivel, electrical swivel, bearings. Test Procedures PART 1, SECTION 1|4 Scope and Conditions of Classification V/.112 Site Chart . To demonstrate that navigational considerations shave bbeen taken into account in establishing the mooring location, site chart of the mooring area is to be submitted in accordance with Section 3/1 which shows the location of the mooring, potential navigation hazards and ‘existing and planned ‘navigation aids, bottom contour elevations, maneuvering area and swing circle. UL1L3 Site Condition Reports To demonstrate that site conditions have been ascertained and taken into consideration in establishing design criteria, reports on subjects including the following are to be submitted in accordance with Section 3/1. a) Environmental conditions of wind, waves, current, seiche, tide, visibility, temperature, and ice. ») Water depth, at berth and throughout the maneuvering area, bottom soil conditions, and subsurface hazards. WV/L114 — Model tests ‘When model tests are used to determine the design loads fo to demonstrate that the established design loads have been based on the results of physical dynamic model tests, a report is to be submitted describing the design loads, calculations, description of model test facilities and procedures,’ and a. summary of the results. It is recommended that the designer consult with the Bureau concerning model testing, procedures, methods and data analysis to ensure the investigation is adequate. MALS — Calculations In general, where applicable, the following calculations are to be submitted: 2) ‘Structural design in accordance with Section 3/3 ’) Stability calculations in accordance with Section 3/3 ©) Mooring and anchorage in accordance with Section 4) Piping in accordance with Sections 4/1 and 4/2 ©) Calculations for all pressure retaining and load bearing components in accordance with Part 4 1) Swivel stack static and dynamic analysis in accordance with Part 4 Calculations when submitted are to be footnoted indicating references, 4/1116 Additional Plans Where certification under the other regulations described in 1/1.7 is requested, submission of additional plans and calculations may be required. W/111.7 Submissions ‘The number of copies for submission should be adequate to include a minimum of two copies for the Bureau, and number of copies to be returned to the submitter. Plans and specifications from designers and builders are generally to be submitted in triplicate, one copy to be retumed to those making submission, one copy for the use of the Surveyor where the SPM is being built, and one copy to be retained in the Technical office for records. Manufacturer's plans are to be submitted in quadruplicate ‘where construction is to be carried out at a plant other than that of the builder. Additional copies may be required when the required attendance of the Surveyor is anticipated at multiple locations. All plan submissions originating from manufacturers are understood to have been made with the cognizance of the builder. Calculations, analyses, and reports are to be submitted to the Bureau in duplicate, 1/113 Information Booklet & Maintenance Manual For each SPM, a document is to be submitted. This document is to include recommendations regarding operation and maintenance of the SPM facility, the design criteria for the SPM, information regarding the mooring area, and the comporients of the SPM. 1/1.13.1 Items Included in Information Booklet & ‘Maintenance Manual ‘The document isto include the following information. a) Site chart as described in 1/1.11.2 bv) Design vessel data, including deadweight, length, draft and distance from bow to manifold, ©) Environmental design criteria with various sizes of vessels, including the operating wind, wave, current and tides. 4) Design cargo transfer criteria, including type of cargo and design maximum working pressure, temperature, flow rate, and minimum valve closing times including the vessel's manifold valves. ©) Plans showing the general arrangement of the single point mooring components and details of those components required to be handled during operation or inspected during maintenance, including details of access to these components, Description of navigation aids and safety features, Recommended procedure for the mooring and disconnecting a vessel at the SPM. h) Recommended procedure for connecting and disconnecting floating hose toa tankers manifold eo i) Recommended maintenance schedule and procedures for the SPM facilities, including a check list of items recommended for periodic inspection. Where applicable, procedures for adjusting anchor leg tension, removal and reinstallation of hoses, inspection of flexible risers, adjustment of buoyancy’ tanks, and replacement of seals in the cargo swivel are to be included. ParT 1. SECTION 1I5 Scove and Conditions of Classification JD Recommended cargo system pressure testing ‘The Information Booklet & Maintenance Manual is to be submitted for review by the Bureau solely to ensure the presence of the above information which is to be consistent with the design information and limitations gpesider in the SPM clssifcadon, The American jureau of Shipping is not responsible for the operation Bureau of Shipping is not respo operat ‘The Information Booklet & Maintenance Manual required by these Rules may contain information required by flag and coastal Administrations. These Administrations may Tequire that additional information be included in the Operation & Maintenance Manual. VLAS Conditions for Surveys after Constructions W118 Damage, Failure and Repair (J Jan. 1996) a) Examination and Repair Damage to SPM. structure, machinery, equipment, mooring system_or risers’ which affects or may affect classification, is to be submitted by the: Owmers or their representatives for examination by the Surveyor, at the first opportunity. All repairs found necessary’ by the Surveyor are to be carried out to his satisfaction. b) Representation Nothing contained in this section or in a nile or regulation of any government or other administration, or the issuaice of any report or certificate pursuant to this section or such a rule oF regulation, is to bbe deemed to enlarge upon the representations expressed in 1/11 through 1/1.1.5 thereof and the issuance and use of any such reports or certificates are to be governed in all respects by I/1.1.] through 1/1.1.5 thereof. 4418.2 Notification and Availability for Survey (Jan, 1996) ‘The Surveyors are to have access to classed SPM's at all reasonable times. For the purpose of Surveyor ‘monitoring, monitoring surveyors shall also have access to classed SPM’s at all reasonable times. Such access may include attendance at the same time as the assigned Surveyor or during a subsequent visit without the assigned Surveyor. ‘The Owners or their representatives are 10 notify the Surveyors on all occasions when an SPM can be examined in the dry condition. The Surveyors are to undertake all surveys on classed SPM's upon request, with adequate notification, of the ‘Owners or their representatives and are to report thereon to the Committee. Should the Surveyors find occasion during any survey to recommend repairs or further cexamitiation, notification isto be given immediately to the Owners or their representatives in order that appropriate action may be taken. ‘The Surveyors are to avail themselves of every convenient ‘opportunity for carrying out periodical surveys in conjunction with surveys of damages and repairs in order to avoid duplication of work. WLIS3 Attendance at Port State Request (1 Jon. 1996) It is recognized that port State authorities 1 have accest to a vescel In cooperation wath pert ute, ABS Surveyors will attend on board a classed vessel when 0 requested by a port State, and upon concurrence of the SPM owner, will carry out’a survey in order to facilitate the rectification of reported deficiencies or other discrepancies that affect or may affect classification, ABS Surveyors will also cooperate with Port States by providing inspectors with background information, if equested. Such information includes text of conditions of class, survey due dates, and certificate expiration dates. ‘Where appropriate, the SPM's flag state will be notified of such attendance and survey. W17 Fees Fees in accordance with normal ABS schedules will be charged for all services rendered by the Bureau, Expenses incurred by the Bureau in connection with these services will be charged in addition to the fees. Fees and expenses will be billed to the party requesting that particular service, 1.19 Disagreement VLI9.1 Rules Any disagreement regarding either the proper interpretation of the Rules, or translation of the Rules from the English language edition, is to be referred to the ‘Bureau for resolution. 4/1.19.2 Surveyors In case of disagreement between the Owners or builders and the Surveyors regarding the material, workmanship, extent of repairs, or application of the Riles relating to any SPM classed or proposed to be classed by this Bureau, an appeal may be made in writing to the Committee who ‘will order a special survey to be held. Should the opinion of the Surveyor be confirmed, the expense of this special survey is to be paid by the party appealing, PART 1, SECTION 1|6 Scope and Conditions of Classification 6. ” lity of the American Bureau’ of Shipping, its committees, officers, employees, agents oF subcontractors for any loss, claim, or damage arising from its negligent performance or aonperformance of any of its services or from breach of any implied or expressed warranty of workmanlike performance in connection with those services, or from any other Feagon, to any person, corporation, partnership, business entity, sovereign, country or uation, will be limited to the greater of 2) $100,000 or b) an amount equal to ten (10) times the sum actually paid for the services alleged to be deficient. ‘The limitation of liability may be increased up to an amount twenty-five times that sum paid for services upon receipt of Client's written request at or before ‘the time of performance of services and upon payment by Client of an additional fee of $10.00 for every {$1,000.00 increase in the limitation. PART 1, SECTION 1|7 Scope and Conditions of Classification PART 1 SECTION 2 Testing During Construction 121 Tank, Bullhead and Fittings/Tightness Testing W211 General After all hatches and watertight accesses are installed, penetrations including pipe connections are Stted, all tanks and watertight ids or flats are to be tested and proven tight. Refer to Table 1/2.1 for specific test quirements" Close viqual examination combined with ‘may be accepted in certain areas where specially approved, as an alternative to hose testing. ‘V212 Tank Testin A tak testing procedure i obs submited for review and approval. ‘Table 1/2.1 ‘lists the types of tests which normally apply. ‘Where permitted in Table 1/2.1, air testing or combined air. hydrostatic testing by an approved procedure may be accepted unless the specified test is deemed necessary by the Surveyor, Where air testing is adopted, all boundary welds, crection joints and penetrations including pipe connections are to be examined under the approved test procedure with a suitable leak indicator solution prior to the application of special coatings. . Air test pressure differential should normally be 0.137 bar (0.14 keflem?, 2 psi. Means are to be provided to prevent accidental over pressuring of tanks during testing. Air pressure drop testing, i.e, checking for leaks by monitoring drop in pressures, is not an acceptable substitute for required hydrostatic ot air/soap testing. Tank testing is to be carried out to the satisfaction of the attending surveyor, and additional or alternative testing ‘may be required at the surveyors discretion. U/213- Hydrostatic Testing Tank designs and configurations of a non-conventional nature may be required to be hydrostaticaly tested. Tanks or units which will be submitted in service and designed to withstand external hydrostatic loading will require hydrostatic testing unless otherwise approved. When hydrostatic testing applies, tests may be carried out before or after the buoy is launched. Special coatings may be applied before hydrostatic testing provided all welded Joint ‘and penetrations are visually examined to the Satisfaction ‘of the Surveyor before special coating is applied. PART 1, SECTION 2|1 Testing During Construction 12.1.4 Hose Testing for Tanks Hose testing i8 to be carried out under simultaneous inspection of both sides of the joint. ‘The pressure in the hhose isnot tobe less than 2.06 bar (2.1 kgflem?, 30 psi), 23 Tank Test for Structural Adequacy Jn order to demonstrate the structural adequacy, representative hydrostatic testing of tanks or buoyant structures may be required in connection with the approval of the design. In general this would include at Teast one tank of each type of new or unusual buoy design, 12.5 Mooring System Tests ach anchor leg is to be examined together with attachments and securing devices provided for connection to the buoy. Proper fitting of components, connectors and securing devices is to be demonstrated. Anchor Legs consist of mooring chains, connectors such as shackles, connecting links, and other fitings. ‘These are to be in accordance with 2/1.13 and 2/1.15 of the ABS "Rules for Building and ‘Classing Mobile Offshore Drilling Units’ and tested in the presence of the attending Surveyor. Each mooring leg is to be pull tested upon installation in accordance wit an approved procedure inthe presence ot Surveyor.” The pull test isto be im aczordance with 3/43. Mooring between Vessel and SPM__which may include Giber Decblo haves or agit moodng siuctare (igsd arms and yokes) are to be examined. The hawsers are to ‘be examined and verified for size, materials, iSzanona, and pt of the approved aclign Propet Etting and securing of all components is to be verified. NDT of the rigid mooring structure to the SPM buoy is to be caried out the satisfaction ofthe attending Surveyor, Tower Mooring designed as a fixed structure, usually made of tubular members, may be used in place of buoyant structure and mooring lines. The testing of such mooring structure is to be in accordance with the ABS “Rules for Building and Classing Offshore Installations: art | Structures’ Pile and Anchor Where piles or gravity boxes are used ‘as anchoring system of an SPM system, NDT is to be performed in accordance with the ABS “Rules for Building and Classing Offshore Installations: Part 1 Structures’. Surveys regarding the manufacturing and testing of anchors are to be in accordance with 21.11 of ABS “Rules for Building and Classing Mobile Offshore Drilling Units*, 2.7 Cargo Transfer System ‘The entire cargo transfer system including hoses/lexible risers, swivels, and valves is to be hydrostatically tested after installation to the design pressure, Refer t0 1/2.11 and Table 1/2.2 for specific requirements, TABLE 1/2.1 2.9 Control and Safety System Alll control and safety equipmeit is to be examined and proven to be adequate for the intended service. Refer to Table 1/2.2 for specific requirements. 12.11 Hoses/Flesible Risers 12111 Hose/Flesible Riser Testing Refer to 4/1.5.5 of these Rules. 1/2.11.2 Buoyancy Tank Pressure Test ‘Any buoyancy tank intended to be pressurized to equalize the external pressure will be tested to a pressure 1.5 times the maximum allowable working pressure. Initial Tank & Bulkheads Tightness Test Requirements Item Test Method Tanks Aix Testor Hydro Test Watertight Bulkheads, Air Testor Hydro Test Flats & Boundaries Dry Spaces Air Testor Hydro Test : Chain Lockers To Be Filled With Water Hlawse Pipes Hose Test ‘Watertight Closing Hose Test Appliances Oil Storage Air Testor Hydro Test Void Space Boundaries Air Test or Hose Test ‘Required to be Watertight Note: “Hose Test" in this Table and Section 1/2.1.4 is intended fo mean testing of boundaries with a stream of water fram a hose provided for this purpose. PART 1, SECTION 2|2 Testing During Construction TABLE 12.2 . Survey and Testing Requirements During Construction 1TEM A B c D ‘Buoy Structure, Buoyancy Element, and other Structure Piles/Anchors Cargo/Product Swivel x x OM Om x MORON Hydraulic Swivel, Electrical Swivel Swivel Driving Mechanism SPM Main Beating i Flexible Risers, Underbuoy Hoses x x OM MX OM MM OM MOM Floating Hoses ea Expansion Joins of Piping x Mooring Chain x Mooring Hawser Standard valves, fitings, anges Electrical Controls/Telemetry KOK OM OM ‘Navigation Aids . LEGEND, A. ABS Attendance at Vendor's shop to verify materials for cmpliance with drawings/specification and their traceability record and to review welding and NDT specifications and procedures, and welder and NDT personnel qualification records. B. ABS attendance at Vendor's shop during critical phases of fabrication such as fit-up, alignment, and NDT ‘examination as indicated in Test and Inspection plan, C. ABS attendance at Vendor's shop in order to witness and report on factory acceptance testing. D, Exempt from ABS Shop Inspection and Testing Attendance. Those items may be accepted based on Vendor or manufacturer providing acceptable documentation that component is designed, manufactured, and tested in accordance with an applicable standard or code. ‘Refer to all parts of these Rules for further testing requirements. PART 1, SECTION 2/3. Testing During Construction a PART 1 SECTION 3 Surveys After Construction v3.1 Conditions for Surveys after Construction U311 Damage See V/1,15.1 3.12 Notification and Availability for Survey See 1.15.2 13.13 Annual Classification Surveys ‘Annual Classification Surveys are to be made within three G) months either way of each annual anniversary date of the crediting of the previous Special Periodical Survey or original construction date. 1314 _ Special Periodical Surveys ‘A Special Periodical Survey isto be completed within five (years afer the date of uid or afer the crediung date Gi the previous Special Periodical Survey. ‘The ierval between Special Periodical Surveys may be reduced by the Committee. If a Special Periodical Survey is not completed at one time, it will be credited as of the completion date of the survey but no later than five (3) Seats fom the date of bud e¢ fom te date recorded for the previous Special Periodical Survey. If the Special Periodical Survey is completed prematurely but iin three (3) months prior to the due date, the Special Periodical Survey will be credited to agree with the effective due date. Special consideration may be given to Special Periodical Survey requirements in the case of Single point moorings of wnial design, in lay-up or i ‘anal circumstances, ‘The Commitee reserves Ue right to authorize extensions of Rule-required Special Periodical Surveys under extreme circumstances. Special Periodical Surveys may be commenced at the fourth annual survey and be continued with a view to completion by the due date, in connecuon withthe preparation forthe Special Periodical Survey, thickness Enupings required forthe Spetal Periodical Surveys are to be taken to the extent accessible and practical in Connection withthe fourth annual survey. Where the Special Periodical Survey is commenced prior to the fourth annual survey the ene survey is nontally to be completed within 12 months if such work is to be credited to the Special Periodical Survey. ¥/3.1.5 Continuous Surveys ) At the request of the Owner, and upon the approval of the proposed arrangements, a system of continuous Surveys may be undertaken whereby the Special Periodical Survey requirements are carried out in PART 1, SECTION 3}1_ Surveys After Construction regular rotation to complete all the requirements of the particular Special Periodical Survey within a five (5) year period. Tf the Continuous Survey is completed beyond the five (5) year period, the completion date will be recorded to agree with the original due date of the cycle, If the Continuous Survey is completed prematurely but within three (3) months prior to the due date, the Special Periodical Survey will be credited to agree with the effective due date. The Committee eserves the right to. authorize extensions of Rule required Special Periodical Surveys under extreme circumstances, Each part (tem) surveyed becomes ‘due again for survey approximately five (3) years from the date of survey. For continuous Surveys, a suitable notation will be entered in the Record and the date of completion of the cycle published. If any defects are found during the survey, they are to be dealt with to the satisfaction ofthe Surveyor. b) Ata survey approximately four (4) years after each ‘Special Continuous Survey of an SPM hull or buoy has been credited, thickness gaugings that are required for forthcoming ' Special Periodical Survey that are accessible are tobe taken. 4/3.1.6 — Lay-up and Reactivation 4) The Bureau is to be notified by the Owner that an SPM bas been laid-up or otherwise removed fom service, ‘This status will be noted in the record and any surveys falling due during lay-up may then be held in abeyance until the SPM is placed back in service. Lay-up procedures and arrangements for maintenance of conditions during lay-up may be submitted to the Bureau for review and verification by survey. ') In the ease of SPM3 which have been laid up for an extended period (ie, six (6) months or more) the requirements for the surveys for reactivation are to be specially considered in this case, due regard being ‘Biven to the status of the surveys at the time of the Commencement of the lay-up period and the Iength and the conditions under which the SPM had been maintained during that period. ©) Where the lay-up preparation and procedures have been submitted to the Bureau for review and survey, and re-verified annually by survey, consideration may be given to deducting part of all of the time in lay-up fiom the progression ‘of surrey, intervals, of to modifying the requirements of the up-dating Survey at time of reactivation, 4) For SPMs returning to active service regardless of ‘whether the Bureau has been informed previously that the SPM has been in lay-up, a Reactivation Survey is required. 13.1.7 Incomplete Surveys When a survey is not completed, the Surveyor is to report immediately upon the work done in order that Owners and the Committee may be advised of the parts sill to be surveyed. 131.8 Alterations No alterations which affect or may affect classification are to be made to the hull or machinery of a classed SPM unless plans of the proposed alterations are submitted and approved by the ABS Technical Office before the work of alterations is commenced and such work, When approved, is carried out to the satisfaction of the Surveyor. Nothing contained in this section or in the rule or regulation of any government or other administration, or the issuance of ‘any report or certificate pursuant to this section or such a rule or regulation, is to be deemed to enlarge upon the Tepresentations expressed in V/L.L1 through —I/1.1.5 ‘thereof and the issuance and use of any such reports or certificates are to in all respects be governed by 1/1.1.1 ‘through 1/1.1.5 thereof, 3.1.9 Welding and Replacement of Materials a) Ordinary and Higher Strength Structural Steels Welding or other fabrication performed on structural steels is to be in accordance with the requirements of Part 2 of these Rules and Section 2/3 of the "Rules for Building and Classing Mobile Offshore Drilling Unit b) Special Materials Welding or other fabrication performed on other steel or adjacent to such steel is to be accomplished with procedures approved for the special materials, involved. Refer to Part 2 of these Rules and Sections 2/2. and 2/3 of the "Rules for Building and Classing ‘Mobile Offshore Drilling Units’ ©) Substitutions and Alterations Substitutions of steel differing fiom that originally installed, alteration of original structural configuration, or change from riveted to welded joints is mot to be made without approval by the ABS Technical Office. 13.3 Drydocking Surveys or Equivalent ‘An examination of the underwater parts of each SPM and associated mooring hardware is to be made at intervals, not exceeding five (5) years. This examination is to align With the due date of the Special Survey. Parts to be examined include extemal surfaces of the SPM, Prior to examination, all mooring and anchoring attachments are to be cleaned including all openings t0 the sea, if any. Anchor legs including connecting hardware are to be examined over the full length from the lowest exposed point at the seabed to the connection point at the SPM. PART 1, SECTION 3|2_ Surveys After Construction WSS Annual Surveys At cach Annual Survey, the SPM is to be generally examined so far as can be seen and placed in satisfactory condition as necessary. For a fixed mooring system ep, tower mooring system, the surveys are to be carried out it accordance with the ABS "Rules for Building and Classing Offshore Installations: Part 1 Suuctures" For floating SPM systems, the following items are to be examined, placed in satisfactory condition and reported upon: 43.5.1 Protection of Hatches and other Openings ) Hatchways, manholes, and scuttles. ) Coamings including deck connection, stiffeners, and brackets, ©) Hatches fited with mechanically operated steel covers including cover plating, stiffener, cross joint, gaskets, cleats and dogs. Exposed steel hatch covers are to be examined to confirm structural integrity and capability of maintaining weathertighiness. Where significant wastage of hatch covers is noted, thickness gaugings are to be carried out and renewals made as necessary, Proper operation and functioning of hatch covers and securing arrangements isto be confirmed. © Ventilators, air pipes together with flame screens, scuppers and discharges serving spaces in the SPM. ©) Watertight bulkheads, bulkhead penetrations, and the operation of any doors in the same, 3.52 Other Areas ) Protection of personnel: guard rails, lifelines, and access ladderways ) Verification of loading guidance and stability data as applicable ©) Verification that no alterations have been made to the SPM which affect the classification. ) Anchoring and mooring equipment verification of mooring chain tensions. ©) Confirmation that electrical equipment in hazardous locations has been properly maintained, 1) Prodbct lines, swivels and seals. 8) Confirmation that there are no potential sources of ignition in or near the cargo area and that access ladders are in good condition. 1) Cargo equipment and piping apparatus including ‘Supports, gland seals, remote control and shut-down devios including 4) Bilge pumping system. D Ventilation system including ducting, dampers and screens, k) Verification that cargo discharge pressure gauges and level indicator systems are operational. 1) Structural areas of the SPM hull or buoy particulatly susceptible to corrosion, including spaces used for sat water ballast, as accessible. Thickness gaugings may be required. 1m) Lights, navigational aids, etc, if applicable. 3.7 Special Surveys Special Survey No. 1 of the SPM hull or buoy is to include ‘sompliance with the foregoing Annual Survey and Drydocking Survey requirements and in addition, the following requirements as listed below are to be carried out as applicable, the parts examined, placed in satisfactory condition, and reported upon. 3.71 Structure 4) The SPM buoy or platform structure including bracing, members, tanks, ‘watertight bulkheads and decks, cofferdams, void spaces, sponsons, chain lockers, machinery spaces, and all other internal spaces are to be examined externally and internally for damage, fractures, or excessive wastage. Thickness gauging of plating and framing may be required where wastage is evident or suspected. Suspect areas may be required to be tested for tightness, non-destructive tested or thickness gauged. Tanks and other normally closed compartments filled with foam or corrosion inhibitors, and tanks used only for lube oil, Hight fuel oil, diesel oil, or other non corrosive products may be waived provided that upon a general examination, the Surveyor considers their condition to be salisfactory. External thickness gaugings may be required to confirm corrosion control, ) Mooring components including chain stoppers, hawser padeyes, etc. are to be examined. © Foundations and supporting headers, brackets and stiffeners from cargo transfer related apparatus, where attached to hull or deck structure are to be examined. © Survey of parts of the SPM which are underwater and inaccessible to the Surveyor may be accepted on the basis of an examination by a qualified diver carried out in the presence of the Surveyor. Survey by ROY, in lieu of a diver, is to be specially considered, ‘The underwater examination is to be carried out in accordance with an approved procedure using two (2) ‘way audio visual communication. ©) At each Special Survey, thickness gaugings are to be ‘arried out where wastage is evident or suspect. At Special Survey No. 2 and subsequent Special Surveys, representative gaugings will be required. Special attention should be paid to splash zones on the bull, related structure, in ballast tanks, and free-flooded spaces. ) Where inspection of underwater joints is required, sufficient cleaning is to be carried out in way of, and water clarity is to be adequate to permit meaningful visual, video, camera or NDT examination as required. PART 1, SECTION [3 Surveys After Construction Every effort should be made to avoid cleaning damage to special coatings. ) All openings to the sea, together with the cocks and valves connected therewith are to be examined internally and externally while the SPM is in drydock, or at the time of underwater examination in liew of drydocking, and the fastenings to the shell plating are to be renewed when considered necessary by the Surveyor. 1) For a tower mooring, the applicable requirements of the ABS "Rules for Building and Classing Offshore Installations: Part I Structures" shall govern. 13.72 Mooring Hardware a) The complete mooring system including anchors, chains, chain stoppers, mooring line connectors, securing devices and pilings as applicable are to te examined. Arrangements are to be made for examination of all underwater areas. Areas not accessible by divers may be examined by ROV. All chain and accessories are to be checked for damage or ‘wastage. Particular attention should be given to mooring components or complete leg assemblies for further examination. ') Removal of one section of the mooring system for examination out of the water will be required at Special Survey No. 4 (20 years of service). ©) Mooring system components (flexible or rigid) for mooring of the attached vessel are to be examined ut provided this equipment is associated with the classed SPM. NDT of high stressed joints in rigid mooring connection may be required at the Surveyors discretion, Flexible hawsers are to be examined for ‘wear and filament breakage. Items found worn may require replacement, 43.13 a) Cargo Hoses Cargo hoses forming part of the SPM classification are to be removed, disassembled, pressure tested to rated working pressure and examined at each Special Survey. This requirement applies to all hoses that have been in service for five (5) years. In the event cargo hoses have been renewed or replaced with new hoses within the five (5) year period, the above requirements may be modified and removal and testing deferred until the hose has been in service five GS) years. Vacuum testing of cargo hoses is required in association with Special Survey or after five (5) years of service as indicated above. b) Flexible Risers ‘An inspection manual for risers included as part of the SPM classification is to be submitted to the Bureau for approval. The manual is to include procedures for the following: Cargo Hoses or Flexible Risers 1, Underwater examination of the flexible risers including arch support buoyancy tanks, 2, Examination of high stress areas such as areas in ‘way of the end flanges, in way of the arch support clamps and the bottom of all looped areas. 3. Examination of wear and tear on spreader bars, if fitted, which separate one riser string from another. 4, Hydrostatic testing of flexible risers to be carried ‘ut to working pressure with special attention paid 10 upper end terminations. 3.14 Safety Equipment Safety equipment associated with the classification of the SPM is to be examined and tested as required by the attending Surveyor. Refer to Section 4/4 for requirements applicable to the safety equipment. V3.1.5 Swivel and Cargo Transfer Equipment ‘Swivel assemblies, foundations, seals and associated piping assemblies are to be examined externally. Pressure retaining. sections “which convey corrosive or erosive ‘materials are to be opened and examined internally. ‘Thickness gaugings may be required to be taken on cargo transfer pipe lines and associated exposed equipment. ‘Upon completion’of the examination, the swivel assembly is to be hydrostatically tested to design pressure and the sealing capability of the swivel is to be verified through one complete revolution. 1/3.7.6 © Electrical Installations Satisfactory operation of equipment is to be verified and Gircuits are to be inspected for possible development of physical changes or deterioration. The insulation esistance of the circuits is to be measured between conductors and between conductors and ground. These values are to be compared with those previously measured, Any large and abrupt decrease in insulation resistance is to be further investigated and either restored to normal or reviewed as indicated by the conditions found. PART 1, SECTION3|4 Surveys After Construction PART 1 SECTION 4 Definitions & Abbreviations Wl Defini Anchor Leg, ‘Mooring element connecting the single point mooring structure to the seabed at the anchor Buoyancy Element Cargo Hawser ‘Hose, Floating ose, Underbuoy Main Bearing Product Swivel Riser, Flexible Single Point Mooring (SPM) ‘SPM, Fixed SPM, Floating Swing Circle point, and is essential for station keeping of the system, ‘A buoyancy member provided to support the weight of mooring equipment or riser, and designed to resist differential pressure from submergence and internal pressure. Any fluid transferred between the moored vessel and the pipe line end manifold (PLEM) such as crude oil, petroleum product, petroleum gas, siurry, and bunkers. ‘Mooring line between SPM structure and moored vessel. Conduit designed to convey Auids between supply and delivery points with significant relative movement and able to tolerate large deflections. ‘Typically, a. hose is ‘comprised of string or series of short hose segments joined together at fanged ends. Hose or hose string located between the SPM structure and the moored vessel for the Purpose of conveying fluid. When not connected to a moored vessel it remains ‘connected to the SPM structure and floats on the sea water surface. Hose or hose string located between the SPM structure and the pipe line end manifold (PLEM) for the purpose of conveying fluids. : The bearing which supports the load from the mooring and hawser and provides a ‘mechanism for the moored vessel to rotate or weathervane about the mooring structure, ‘A mechanism which provides for passage of cargo or product while allowing the main Structure to weathervane freely with respect to the fixed or anchored structure without significant leakage a the rated design pressure. « Conduit designed to convey fluids between supply and delivery points with or without significant relative movement and able to tolerate large deflections. A flexible vier is usually comprised of one continuous length, used for relatively greater water depths and constructed to be used totally submerged. A system which permits a vessel to weathervane while the vessel is moored to a fixed or floating structure anchored to the seabed by a rigid or an articulated structural system or by catenary spread mooring. Examples of such system are CALM, SALM, tower mooring, ete. ‘A tower mooring and a Single Anchor Leg Mooring (SALM) which are gravity based (Gxed or pinned) system are defined here as fixed SPMS. ‘A Catenary Anchored Leg Mooring (CALM) is an example of a floating SPM. ‘The swing circle is the area swept by the moored vessel as it revolves about the mooring point. ParT 1. SECTION 4I1 Definitions & Abbreviations v4.3 AFBMA, Isc ANSI APL ASME u4s Abbreviationis Anti Friction Bearing Manufacturers Association American Institute of Steel Construction American National Standards Institute American Petroleum Institute American Society of Mechanical Engineers ‘American Society for Testing and Materials Dead Weight Expansion Joint Manufacturer's Association National Association of Corrosion Engineers Non-Destructive Testing il Companies International Marine Forum Pipe Line End Manifold Remotely Operated Vehicle Underwater Inspection In Liew of Drydocking ‘Systems of Measurement ‘These Rules are written in the three systems of units, i.e., SI units, MKS units and US customary units. Each system is to be used independently of any other system. ‘The format of presentation in the Rules of the three systems of units is as follows: STunits (MKS units, US Customary units) unless otherwise indicated. PART 1, SECTION 4|2 Definitions & Abbreviations i) Part 2 Materials and Welding PART 2 SECTION 1 : Materials wa General ‘These Rules are intended for single point moorings (SPM) to be constructed of materials manufactured and tested in accordance with the requirements of these Rules and where applicable, Part 2 of the “Rules for Building and Classing Mobile ‘Offshore Drilling Units", Where it is intended to use materials of different process, manufacture or of different properties, the use of such materials and corresponding scantlings will be specially considered, 213° Structure For most applications, ordinary strength steel, such as, ABS Grade A or ASIM A36, is considered acceptable. Critical toad carrying components in the mooring load path, such as hawser connection, padeyes, are to. be considered as. primary application’structare. Materials used in the construction of the SPM buoy structure ae to comply with Section 2/1 of the "Rules for Building and Classing Mobile Oftshore Drilling Units". Materials used in the construction of the tower mooring structure are to tbe in accordance with the ABS "Rules for Building and Classing Offshore Installations: Part 1 Structures", ‘The use of other commercial material specifications for SPM applications will be specially considered. 2.5 Mooring System ‘Materials used in the construction of anchors, anchor legs, associated hardware, etc. are to comply with one of the following when applicable: 2) | Section 2/1 ofthe "Rules for Building and Classing Mobile Offshore Drilling Units b) ABS "Guide for the Certification of Offshore 2 APL Recomménded Practices, and APT Specifications 2F and 9A. Where synthetic materials are used, material specifications are to be submitted for review. 2.7 Cargo or Product Transfer Systems ‘Materials used in the construction of cargo or product transfer systems are to comply with appropriate material specifications as may be approved in connection with a particular design. ‘The material specifications are to comply with recognized standards and are to specify 2 suitable range of established values for tensile strength, yield strength and ductility at design temperature. ‘Materials need not be tested in the presence of the Surveyor. In general they may be accepted on the basis of a review of mill certificates by the Surveyor. Materials used in cargo or product transfer systems that will be exposed to hydrogen sulfide are to be selected Part 2, SECTION 1]1 Materials ‘within appropriate Limits of chemical composition, heat treatment and hardness to resist sulfide stress cracking. Material selection is to comply with the requirements of NACE MR-O1-75, Material selection is to consider the possibility of chloride stress cracking if chlorides are present in the cargo or product uid, Refer to 4/1.5.4 for further requirements regardi underbuoy hosesflexible risers and floating hoses, PART 2 SECTION 1 Materials wa General ‘These Rules are intended for single point moorings (SPM) ib be constncted of materais necubctured and eed ih accordance with the requirements of these Rules and where applicable, Part 2 of the "Rules for Building and Classing Mobile ‘Offshore Drilling Units", Where it is intended to use materials of different process, manufacture or of different properties, ‘the use of such materials and corresponding scantlings Will be specially considered. 213 Structure For most applications, ordinary strength steel, such as, ABS Grade A or ASIM A36, is considered acceptable. Critical Toad carrying compotents in the mooring load ath, such as hawser connection, padeyes, are to be considered as primary application structure. Materials used in the construction of the SPM buoy structure are to ‘comply with Section 2/1 of the "Rules for Building and Classing Mobile Offshore Drilling Units". Materials used in the construction of the tower mooring structure are to be in accordance with the ABS "Rules for Building and Classing Offshore Installations: Part 1 Structures’. The use of other commercial material specifications for SPM applications will be specially considered. 211.8 Mooring System Materials used in the construction of anchors, anchor legs, associated hardware, etc. are to comply with one of the following when applicable: a) Section 2/1 of the "Rules for Building and Classing ‘Mobile Offshore Drilling Units" b) ABS "Guide for the Certification of Offshore Mooring Chain” Q API Recommended Practices, and API Specifications 2F and 94. Where synthetic materials are used, material specifications are to be submitted for review. 24.7 Cargo or Product Transfer Systems Materials used in the construction of cargo or product ‘transfer systems are to comply with appropriate material specifications as may be approved in connection with a particular design. ‘The material specifications are to ‘comply with recognized standards and are to specify a suitable range of established values for tensile strength, yield strength and ductility at design temperature Materials need not be tested in the presence of the Surveyor. In general they may be accepted on the basis of a review of mill certificates by the Surveyor. ‘Materials used in cargo or product transfer systems that will be exposed to hydrogen sulfide are to be selected PART 2, SECTION 1]1 Materials ‘within appropriate limits of chemical composition, heat treatment and hardness to resist sulfide stress cracking. Material selection is to comply with the requirements of NACE MR-O1-75, Material selection is to consider the possiblity of chloride stress cracking if chlorides are present in the cargo or product fluid, Refer to 4/1.5.4 for further requirements regarding underbuoy hoses/flexible risers and floating hoses. PART 2 SECTION 2 Welding and Fabrication 221 General 2N11 Welding ‘Welding in SPM hull or buoy construction of the mooring, system is to comply with the requirements of this section, linless specially approved otherwise. It is recommended that appropriate permanent markings be applied to the side shell of welded SPM buoys or hulls to indicate the location of bulicheads for reference. In all instances, welding procedures and filler metals are to produce sound welds having strength and toughness comparable to the base material. ‘Welding of tubular and/or bracing members which may be used in tower mooring is to comply with the ABS "Rules for Building and Classing Offshore Installations: Part 1 Structures", 22.1.2 Plans and Specifications The plans submitted are to clearly indicate the proposed extent of welding to-be used in the principal parts of the structure, The welding process, filer metal and joint design are to be shown on the detail drawings or in separate specifications submitted for approval which should distinguish between manual and automatic welding, The builders are to prepare and file with the Surveyor a planned procedure 10 be followed in the ‘erection and welding of the important structural members. 22.1.3 Workmanship and Supervisi ‘The Surveyor is to satisfy himself that all welders and welding operators to be employed in the construction of SPMs to be classed are properly qualified and are experienced in the work proposed. The Surveyor is also to be satisfied as to the employment ofa sufficient number of skilled supervisors to ensure a thorough supervision and ‘control of all welding operations. Inspection of welds employing methods outlined in 2/2.5.9 is to be carried out to the satisfaction of the Surveyor. 22.1.4 Welding Procedures @) General Procedures for the welding of all joints are to be established before construction for the welding Processes, types of electrodes, edge preparations, Welding techniques, and positions proposed. See 2/3C.5 of the ABS “Rules for Building and Classing ‘Mobile Offshore Drilling Units", Details of proposed welding procedures and sequences may be required to bbe submitted for review depending on the intended application, b) Weld Metal Toughness-Criteria for ABS Grades of Steel For steels shown in Tables 2/1.1 and 2/1.2 of the ABS "Rules for Building and Classing Mobile Offshore Drilling Units* approved filler metals PART 2, SECTION 211 Welding and Fabrication, appropriate to the grades shown in Appendix 2/C of the ABS "Rules for Building and Classing Mobile Offshore Drilling Units", may be used. ©) Weld Metal Toughness-Criteria for Other Steels Weld metal is to exhibit Charpy V-notch toughness values at least equivalent to transverse base metal requirements (2/5 of the longitudinal base metal requirements) 22.3 Preparation for Welding 2.3.1 Edge Preparation and Fitting ‘The edge preparation is to be accurate and uniform and the parts to be welded are to be fitted in accordance with the approved joint detail, "All means adopted for correcting improper fitting are to be to the satisfaction of the attending Surveyor." The Surveyor may accept a ‘welding procedure for build up of each edge that does not exceed one balf the thickness of the member or 12.5 mm (0/2 in.) whichever is the lesser. ‘The Surveyor may accept edge build up in excess of the above up to the full thickness of the member on a case-by-case basis provided he is notified af such cases before the members are welded together. Where plates to be joined differ in thickness and have an offset on either side of more than 3 mm (1/8 in), 4 suitable transition taper is to be provided. For butts in bottom shell, strength deck plating and other joints which may be subject to comparatively high stresses, the ‘transition taper length is to be not less than three (3) times the offset, ‘The transition may be formed by tapering the thicker member or by specifying a weld joint design which will provide the required transition. 22.3.2 Alignment Means are to be provided for maintaining the parts to be welded in correct position and alignment during the welding operation. “In genera, strong backs, or other appliances used for this purpose’ are to be so arranged as, to allow for expansion and contraction during production ‘welding. The removal of such items is to be carried out to the satisfaction ofthe Surveyor. 22.3.3 Cleanliness All surfaces to be welded are to be fee from moisture, ‘ease, loose mill scale, excessive rust, or paint. Primer Coatings of ordinary thicknesses, thin coatings of linseed oil, or equivalent coatings may be used provided it is demonstrated that their use has no adverse effect in the production of satisfactory welds. Slag and scale are to be femoved not only from the edges to be welded but also from each pass or layer before the deposition of subsequent passes of layers. Weld joints prepared by arc- air gouging may require additional preparation by gzinding or chipping and wire brushing prior to welding to minimize the possibility of excessive carbon on the scarfed surfaces." Compliance with these cleanliness requirements is of prime importance in the welding of higher-strength steels especially those which are quenched and tempered. 23.4 Tack Welds Tack welds of consistent good quality, made with the same grade of filler metal as intended for production welding and deposited in such a manner as not to interfere with the completion of the final weld, need not be removed provided they are found upon examination to be thoroughly clean and free from cracks or other defects. Preheat may be necessary prior to tack welding when the materials to be joined are highly restrained. Special consideration is to be given to use the same preheat as specified in the welding procedure when tack welding higher-strength steels, particularly those materials which are quenched and tempered. These same precautions are to be followed when making any permanent welded ‘markings. 22.3.5 — Run-on and Run-off Tabs ‘When used, run-on and run-off tabs are to be designed to minimize the possibility of high-stress concentrations and. bbase-metal and weld-metal cracking. 223.6 Stud Welding ‘The attachment of pins, hangers, studs, and other related. items to ordinary and higher-strength hull structural steels, ‘oF equivalent, by stud welding may be accepted by the ‘Surveyor in accordance with 2/3C.5.2 of the ABS "Rules for Building and Classing Mobile Offshore Drilling Units" or satisfactory trial stud welding. Stud welded attachments to quenched and tempered steel is to be specially approved. ‘Trial stud welds may be required by the Surveyor to demonstrate that the base material in way of the stud welds is free from cracking and excessively high hardness. The use of stud welding for structural attachments is subject to special approval and may require special procedure tests appropriate to each application. 223.7 Forming Steel is not to be formed between the upper and lower critical temperatures; forming in the range between 205°C (00°F) and 425°C'(800°F) should be avoided. If the forming temperature exceeds 650°C (1200°F) for as- rolled, ‘controlled rolled, thermo-mechanical controlled rolled or normalized steel, or is nat at least 28°C (50°F) lower than the tempering temperature for quenched and tempered steels, mechanical tests are to.be made to assure that these temperatures have not adversely affected the mechanical properties ofthe steel For applications where toughness is of particular concert (such as Class TV or Class V of Table 3/2.1b of the ABS "Rules for Building and Classing Mobile. Offshore Drilling Units"), when steel is formed below 650°C (1200°F) beyond'3% strain* on the outer fiber, supporting data is to be provided to the satisfaction of the Surveyor indicating that the impact properties meet minimum PART 2, SECTION 2|2 Welding and Fabrication requirements after forming. After straining, specimens wed in Charpy impact tests are to be subfeced to an artificial aging treatment of 288°C (50°F) for 1 hour before testing. Rule steels of Tables 2/1.1 and 2/1.2 of the ABS "Rules for Building and Classing Mobile Ofishore Drilling Units" or equivalent steels used for radius gunwales (in accordance with Tabie 3/2.1b of the ABS "Rules for Building and Classing Mobile Offshore Drilling Units") may be cold formed to a minimum radius of 15t without requiring stress relieving or other supporting data. 65 x plate tieiness “Calculated on the basis of % strain = 22.5 Production Welding 2251 Environment Proper precautions are to be taken to insure that all welding is done under conditions where the welding site is protected against the deleterious effects of moisture, wind and severe cold, 22.52 Sequence ‘Welding is to be planned to progress symmetrically so that shrinkage on both sides ofthe structure willbe equalized The ends of frames and stiffeners should be left unattached to the plating at the subassembly stage until connecting welds are made in the intersecting systems of plating, framing and stiffeners at the erection stage, Welds are not to be carried across an unwelded joint or beyond an unwelded joint which terminates at the joint ‘being welded unless specially approved. 2253 Preheat ‘The use of preheat and interpass temperature control are Tease pa od es gee oe materials of thick cross-section or materials subject 1 high restraint, When welding is performed under high hhumidity conditions or witen the temperature of steel is below O°C (32°F), the base metal is to be preheated to at least 16°C (60°F) or to a temperature appropriate to the and he thickness, whichever is higher The control of interpass temperate is to be specially consi when welding quenched and tempered higher-strength steels. "When preheat is used, the preheat and interpass tempergtures are to be in accordance with the accepted welding procedure and to the satisfaction of the Surveyor. In all cases preheat and interpass temperature control are to be sufficient to maintain dry surfaces and minimize the possibility ofthe formation of Fractures. 2254 — Low-hydrogen Electrodes. or Welding Processes a) Welding of Ordinary and Higher Stren Stel he seat owetogen elects or weting processes is recommended for welding all higher- strength steel and may also be considered for ordinary- strength steel weldments subject to high restraint, When using low-hydrogen electrodes or processes, proper precautions are fo be taken to ensure that the electrodes, fluxes and gases used for welding are clean and dry. : b) Welding of Quenched and Tempered Steels Unless approved otherwise, matching strength, low-hydrogen. electrodes or welding processes are to be used for welding quenched “and tempered steels and overmatching should be generally avoided. When ‘welding quenched and tempered steels to other steels, the weld filler metal selection is to be based on the lower strength base material being joined and low- hydrogen practice being comparablé to that for the higher strength material, In all cases, filler metal strength is to be mo less than that of the lowest strength member of the joint unless approved otherwise. The Surveyor is to be satisfied that the procedures for handling and baking filler metals and fluxes are commensurate with the low-hydrogen practices appropriate to the highest strength steel. 20.55 Back Gouging Chipping, grinding, arc-air gouging or other suitable methods ae to be etployed atthe root or underside of the weld to obtain sound metal before applying subsequent beads for all full-penctration welds. When arc-air ‘gouging is employed, a selected technique is to be used so ‘that carbon buildup and burning of the weld or base metal is minimized. Quenched and tempered steels are not to be flame gouged, 22.5.6 — Peening ‘The use of peening is not recommended for single-pass welds and the root or cover passes on multipass welds. Peening, when used to correct distortion or to reduce residual’ stresses, is to be effected immediately after depositing and cleaning each weld pass. 22.5.7 airing and Flame Shrinking Fairing by heating or flame shrinking and other methods of correcting distortion or defective workmanship in fabrication of main strength members and other plating ‘which may be suibject to high stresses is to be carried out only with the express approval of the Surveyor. These corrective measures sare to be kept to an- absolute minimum when the higher-strength steels are involved, due to high local stresses and the possible degradation of the mechanical properties of the base material. 22.5.8 Surface Appearance and Weld Soundness a) Surface Appearance The surfaces of welds are to be visually and are to be regular and uniform with 2 minimum amount of reinforcement and Feasonably fe ffom undercut and overlap, Welds and adjacent base metal are to be fee from injurious arc strikes. b) Weld Soundness Welds are to be sound, crack free throughout the weld cross section, and fused to the base material to the satisfaction’ of the attending Surveyor and should generally be considered on the basis of 2/2.1.3, 2/2.1.4, and 2/2.5.9. PART 2, SECTION 2[3 Welding and Fabrication 22.5.9 Inspection of Welds Inspection of welded joints in important locations is to be carried out by an approved non-destructive test method such as radiographic, ultrasonic, magnetic-particle or dye- penetrant inspection, The Bureau's separately issued "Rules for Non-destructive Inspection of Hull Welds" or an approved equivalent standard is to be used in evaluating radiographs and ultrasonic indications. Evaluation of radiographs and ultrasonic indications is fone of the factors in assessing shipyard weld quality control, Radiographic or ultrasonic inspection, or both, is to be used when the overall soundness of the weld cross section is to be evaluated. Magnetic-particle or dye~ ppenetrant inspection or other approved methods are to be used when investigating the outer surface of welds or may be used as a check of intermediate weld passes such as root passes and also to check back-gouged joints prior to depositing subsequent passes. Surface inspection of important tee or corner joints in critical locations, using ‘an approved magnetic particle or dye penetrant method, is to be conducted to the satisfaction of the Surveyor. Extra high-strength steels, [415-690 Nimm? (42/70 kgf/mm?, 60,000-100,000 psi) minimum yield strength] may be susceptible to delayed cracking. When welding these materials, the final NDT is to be delayed sufficiently to permit detection of such defects. Weld run-on or run-off fabs may be used where practical and be sectioned for examination, Where a method (such as radiographic or ultrasonic) is selected as the primary non-destructive ‘method of inspection, the acceptance standards of such a method govern. However, if additional inspection by any method should indicate the presence of defects that could jeopardize the integrity of structure, removal and repair ‘of such defects are tobe tothe satisfaction ofthe attending Surveyor. 225.10 Repair Welding Defective welds and other injurious defects, as determined by visual inspection, non-destructive test_methods, or leakage are to be excavated in way of the defects to sound metal and corrected by rewelding using a suitable repair ‘welding procedure to be consistent with the material being, welded. Removal by grinding of minor surface imperfections such as scars, tack welds and arc strikes may be carried out where’ permitted by the attending Surveyor, Special precautions, such as the use of preheat, interpass tem onirol, and low-hydrogen electrodes, are to be considered when repairing welds in all higher strength steel, ordinary streagth steel of thick cross section, of steel subject to high restraint, Materials thicker than approximately 19 mm (/4 in) are considered to be of thick cross-section. In all cases, preheat and interpass temperature control are to be Sufficient to maintain dry surfaces and minimize the ibility ofthe formation of fractures. 22.7 Butt Welds 22.7.1. Manual Welding Using Covered Electrodes Manual, welding using covered electrodes may be ordinarily employed for butt welds in members not exceeding 6.5 mm (1/4 in) in thickness without beveling the abutting ‘edges, Members with thickness exceeding 6.5 mm (1/4 in.) are to be prepared for welding in a manner acceptable to the Surveyor by using an appropriate edge preparation, root opesing and rot face (and) te, provide for welding from one or both sides. For welds made from both sides, the root of the first side ‘welded is to be removed to sound metal by an approved method before applying subsequent weld passes on the reverse side. Where welding is to be deposited from one side only, using ordinary welding techniques, appropriate backing (cither permanent or temporary) isto be provided. ‘The backing is to be fitted so that spacing between the backing and the members to be joined is in accordance with established procedures. Unless specially approved otherwise, splices in permanent backing strips are to, be welded with full penetration welds prior to making the primary weld, 227.2 — Submerged-Arc Welding ‘Submerged-Arc welding, using wire-flux combinations for butt welds:in members not exceeding 16 mm (5/8 in.) in thickness, may be ordinarily employed without beveling the abutting edges. Members with thickness exceeding 16, mam (5/8 in,) are normally to be prepared for welding in a manner acceptable ta” the Surveyor by using an appropriate edge preparation, root opening and root face (land) to provide for welding from one or both sides. When it is determined that sound welds can be made without back gouging, the provisions of 2/2.5.5 are not applicable.“ Where the metal isto be deposited from, one side- only, using ordinary welding techniques, backing (ither permanent or temporary) is to be provided and the members are to be beveled and fitted in accordance with ‘established procedures, 22.73. Gas. Metal-Arc and Flux Cored-Are Welding ‘Manual semiautomatic or machine automatic gas metal- ‘arc welding: and flux cored-are welding using wire-gas ‘combinations and associated processes, may be ordinarily employed utilizing the conditions as specified in 2/2.7.1 except that specific joint designs ‘may differ between processes. Gas metal-arc welding utilizing short circuiting-dre transfer technique (the consumable electrode is deposited uring repeated short circuits) is to be restricted to welding thickness up to 6.5 mm (1/4 in.) unless specially approved otherwise, (see 2/3C.11.2 of the ABS "Rules for Building and Classing Mobile Offshore Drilling Units" for special requirement for welder qualification). 22.74 __ Electroslag and Electrogas Welding The use of electrosiag and electrogas welding processes wall be subject.to special consideration, depending upon the specific application and the mechanical properties of the resulting welds and heat-affected zones. PART2, SECTION 2/4 Welding and Fabrication 2275 Special Welding Techniques Special welding techniques employing aly of the basic welding processes mentioned in 2/2.7.1 through 2/2.7.4 will be specially considered, depending upon the extent of the variation from the generally accepted. techniques. Such special techniques include one-side welding, narrow-gap welding, tandem-arc welding, open-ar¢ welding and consumable-nozale elecroslag welding, ‘The use of gas tungsten-arc welding will also be subject to special Consideration, depending upon the application and ‘whether the process is used manvally or automatically, 22.9 Alternates ‘The foregoing are considered minimum requirements for electric arc welding in hull construction, but altemate ‘methods, arrangements and details will be considered for approval, 22.11 Welding of Piping See Section 2B of the ABS "Rules for Building and Classing Mobile Offshore Drilling Units" and ASME 31.3 a8 applicable, for welding procedures and details of piping and machinery components 22.13 Welding Procedures See Section 2/3C of the ABS "Rules for Building and Classing Mobile “Oflshore Drilling Units" for the proceduire to be followed in obtaining the approval of the Bureau for electrodes.and welding procedures, for qualifying welders and for demonstrating satisfactory ‘workmanship. For tubular members 6f SPM structure as in a tower mooring, welding procedure is to comply with ABS “Rules for Building and Classing Offshore Installations: Part 1 Structures", PART 2 SECTION 3 Weld Design 2131 Fillet Welds 2311 General a) Plans and Specifications The actual sizes of fillet ‘welds are to be indicated on detail drawings or on a separate welding schedule and submitted for approval in cach individual case, 8) Workmanship Completed welds are to be to the satisfaction of the attending Surveyor. The gaps between the faying surfaces of members being joined should be kept to. minimum. Where the opening ‘between members being joined exceeds 2.0 mm (1/16 in.) and is net greater 5 mm (3/16 in), the weld leg size is to be increased by the amount of the opening. Where the opening between members is ‘greater than 5 mm G/16 in), corrective procedures are to be specially approved by the Surveyor. ©) Special Precautions Special precaution such as the use of preheat or low-hydrogen electrodes of low- hydrogen welding processes may be required where stall lets are used to atach heavy plates or sections When heavy sections are attached to relatively light plating, the weld size may be required to be modified. 2. ‘Tee Connections a) Size of Fillet Welds. Tee connections are generally to be formed by continuous or intermittent fillet welds on cach side, as required by Table 2/3.1. The leg size, w, of fillet welds (see figure in Table 2/3.1) is obtained ‘rom the following equations, w = ty Cf + 200mm w= ty Cs + 0.08 Win 0-3 fy OF4.5 mm (0.18 in.). Where’ 23.1.5 is applicable, Wig = 4.0mm (0.16 in}. where, 41> the actual length of weld fillet, clear of cater, in mm or in, $= the distance between successive weld fillets, from center to center, in mm or in. 3/1 = 1.0 for continuous fillet weldiig fo = thickness of the thinner of the two members being joined in mm or in, C = weld factors given in Table 23.1 Part 2. section 3I1 Weld Desian In sclecting the leg size and spacing of matched fillet welds, the leg size is to'be taken as the lesser of the designed leg size or 0.7¢,, + 2.00 mm (0.1, + 0.08 in). In determining weld sizes based on the above equations, the nearest half millimeter or one-thirty second of an inch may be used, ‘The throat size, f, is to be not less than 0.70 w. For the weld size for f,, less than 6.5 mm (0.25 in), see 2.1.28, ©) Legh aed Aruagemint Fed When intermittent weld is permitted by Table 2/3.1, the Serva e ee ae Selmer ene oneicon vey eae eet tered ©) Intermittent Welding at Intersection Where beams, stiffeners, frames, etc., are intermittently welded and pass through slotted girders, shelves or stringers, there is to be a pair of matched intermittent welds on each side of each such intersection and the beams, stiffeners and frames are to be efficiently attached to the girders, shelves and stringers, a) Welding of Longitudinal to Plating Welding of ongitudinals to plating is to have double continuous Welds at the ends and in way of transverses equal in length to-depth of the longitudinal. For deck ongitudinals only, a matched pair of welds is required atthe transverses. ©) Stiffeners and Webs to Hatch Covers Unbracketed stiffeners and webs of hatch covers are to be Welded continuously to the plating and to the face plate for a fength at ends equal to the end depth of the member. {) Thin Plating For plating of 6.5mm (0.25 in) or less, the requirements of 2/3.1.2a may be modified as follows: Wo by Cf +2.00(1.25 -Us) mm wo =, C of +0.08(125 -Us) in, Yin = 3.5mm (0.14 in). ‘The use of above equations for plating in excess of 6.5 mm (0.25 in.) may be specially considered depending upon the location and quality control procedure. 231.3 Tee-Type End Connections ‘Tee-type end connections where fillet welds are used are to have continuous welds on each side, In general, the leg sizes of the welds are to be in accordance with Table 2/3.1 for unbracketed end attachments, but in special cases where heavy members are attached to relatively light plating, the sizes may be modified. Where only the webs of girders, beams and stiffeners are required to be attached to plating, it is recommended that the unattached face plate or flanges be cut back. 23.14 Ends of Unbracketed Stiffeners Unbracketed stiffeners of shell, watertight and oiltight bulkheads are to have double continuous welds for one- tenth of their length'at each end. Unbracketed stiffeners of nontight structural bulkheads, deckhouse sides and alter ends are to have a pair of matched intermittent welds at each end, 2315 Reduced Weld Size Reduction in filet weld sizes except for slab longitudinals of thickness greater than 25 mm (1.0 in.) may be specially approved by the Surveyor in accordance with either 2/3,1.5a or b provided the requirements of 23.1.2 are ) Controlled Gaps Where quality control facilitates ‘working to a gap between members being attached of 1 ‘mm (0,04 in, of less, a reduction in fillet weld leg size w of 0.5 mm (0.02 in.) may be permitted. ) Deep Penetration Welds Where. automatic double ‘continuous fillet welding is used and quality control facilitates working to a gap between members being attached of 1 mm (0.04 in. or less, a reduction in fillet weld leg size of 1.5 mm (1/16 in) may be permitted provided that the penetration atthe root is atleast 1.5 mam (1/16 in. into the members being attached, 213.16 Lapped Joints Lapped joints are generally to have overlaps af not less ‘width than twice the thinner plate thickness plus 25 mm in). 213.164 Overlapped End Connections Overlapped end connections of main strength members are to have continuous fillet welds on both edges each equal in size w to the thickness of the thinner of the two plates joined. All other overlapped end connections are to have continuous welds on each edge of sizes w such that the sum of the two is not less than 1.5 times the thickness of the thinner plate, 2131.60 Overlapped Seams Oveslapped seams are to have continuous welds on both edges of the sizes required by Table 2/3.1 for the boundaries of deep tank or watertight bulkheads, except that for seams of plates 12.5 mm (1/2 in.) or less clear of tanks, one edge may have intermittent welds in accordance with Table 2/3.1 for watertight bullhead boundaries. 2/3.1.7 Plug Welds or Slot Welds Plug welds or slot. welds may be specially approved for Particular applications, Where used in the body of Pant? serriny 312 Wald Nesinn doublers and similar locations, such welds may be spaced vabout 305 mm (12 in.) between centers in both directions 23.18 — Weld in Tubular Joints ‘The weld design of joints of intersecting tubular members which are used in fixed structure in a tower mooring is to bbe in accordance with the ABS "Rules for Building and Classing Offshore Installations: Part 1 Structures", 213.3 Full or Partial Penetration Corner or Tee Joints ‘A full or partial penetration weld may be required at Srtitical joints. Measures taken to achieve full or partial ppenetraiion comer or tee joints, where specified, are to-be to the satisfaction of the attending Surveyor. The designer is to give consideration to minimize the possibility of lamellar tearing in such joints. 235 Alternatives ‘The foregoing are considered minimum requirements for electricare welding in bull construction, but alternative methods, aangements and details will be considered for spproval, See 25-5 ofthe ABS "Rules for Building and Classing Mobile Offshore Drilling Units". Fillet weld $y eden fom sca ie ed on sound engineering. principles provided they mest the overall sength standards ot the Res TABLE 2/3.1 Weld Factors G a Ke _ ‘Staggered ——s——+] Chained }-—-s—+| w = leg size in mm orin. 1 = throat size in mm or in, L Periphery Connection C =Continuous DC=Double Continuous A Tight Joints 1. Main bulkhead to deck, bottom or inner bottom 2 Allother tight joins a. watertight bulkhead fy 12.5 mm (0.50 in) vb, Mother joints B. —_Non-tight Joints 1. Platform decks 2. Swash bulkheads in deep tanks 3, Nonctight bullcheads other than item B2 1 Bottom Floors 1. To Shell 2 Tolnner Bottom 3, To Main Girders 4. To Side Shell and Bulkheads 5. Open Floor Bracket a. to center girder b. to margin plate m1 Bottom Girders 1. Center Girder ‘Web Frames, Stringers, Deck Girders and Deck Transverses L To Plating a. intanks b. _ elsewhere 2, To Face Plates a. face area < 64,5 om? (10 in?) bb, _ face area > 64.5 em? (10 in*) 3. End Attachment a. unbracketed (see note 1) b. bracketed PaRT 2, SECTION 3|3. Weld Design one side other side Factor C 042 DC 058 C 0.12 035 DC 028 DC 0.20 ous 020 DC 020 DC 030 DC 035 DC ols 030 DC 02s 0.20 ons 12 ous 055 DC 049 DC v. Frames, Beams and Stiffeners 1. To'Shell 025 pe 2. To plating elsewhere 012 3. End attachment &.unbracketed (see note 1) 04s De e b. bracketed . 035 De vL Hatch Covers 1. Oiltight Joints 040 De 2. Watertight Joins outside 040 Cc inside o.1s 3. Stidfeners and Webs to Plating and to Face Plate (see note 2) 02 4. Stiffeners and Web to Side Plating or other stiffeners cunbracketed (see note 1) 045 DC “bracket 035 DC vo. Hatch Coamings and Ventilators 1. To Deck a athatch comer 045 De b._elsewhere 025 DC 2 Coaming stays 2 todeck 020 De B. tocoaming ois Dé van. Foundations 1. Major Equipment and Auxiliaries 040 DC Notes 1, The weld size is to be determined from the thickness of the member being attached. 2. Unbracketed stiffeners and webs of hatch covers are to be welded continuously to the plating and to the face plate for a length at ends equal to the end depth of the member, 3. With longitudinal framing the weld size is to be increased to give an equivalent ‘weld area to that obtained without cut-outs for longitudinal PART 2, SECTION 3|4 Weld Design Part 3 Mooring System Design PART 3 SECTION 1 Site and Environmental Conditions SMA General ‘The provisions of this section are intended to establish the method of defining the location of the SPM, the environmental conditions which will affect operations at the SPM and which are to be considered in establishing design criteria, and the bottom soil conditions which affect the anchorage of the SPM. 3/13 Mooring Location 3/131 Site Chart ‘A complete chart of the mooring area is to be submitted, ‘This chart is to show depth soundings and obstructions ‘within the swing circle, the maneuvering area, and where applicable, the approach channel from deep water or an established navigation channel. The chart may be based on local charts published by government agencies or on hydrographic surveys conducted by a marine consultant. In case of charts based on hydrographic surveys,-a survey report is to be submitted describing the surveying method, equipment, and personnel employed to conduct the survey” ‘The exact location and water depth of the mooring base or ‘Pipe line end manifold (PLEM), and each anchor point, is to be indicated on the chart. ‘The route of the submarine pipeline and of all other pipelines and cables is to be Indicated on the chart. If the mooring is associated with other SPMs in the area, or with a pumping or control platform, these features are to be indicated on the chart. All other features and water use areas which may present potential navigational hazards are to be identified. All existing and planned navigation aids such as lights, ‘buoys, “and shore markers which will be used conjunction with the mooring are to be indicated and ‘identified on the chart. 33.2 ‘All depths on the chart are to be referenced to the datum of the local navigational chart. The chart is to be based on depth soundings taken at 15 m (50 ft) horizontal intervals or less. ‘The chart is to show bottom contours ata vertical interval of 1.5 m (5 8), Where the bottom is irregular, the spacing cof soundings is to be reduced. Where side scan sonar or Pare drag 1 employed, the spacing of Soundings may be All obstacles, such as sunken wrecks, rocks, and pinnacles are to be identified and their clear depths indicated. Where such obstacles are encountered, wire drag at a depth beneath the required water depth or a side scan sonar survey is to be conducted throughout. PARTS, SECTION 1|1 Site and Environmental Conditions Bottom Topography . Where itis shown that water depth is far in excess of the required water depth, the survey may be appropriately ie 3.3.3 Maneuvering Area ‘The maneuvering area is to be indicated and captioned on the site chart. The maneuvering area is defined as the area through which a vessel is to maneuver in making an approach (, or a departure from, the SPM. The shape and size of the maneuvering area are to be established bbased on pertinent local conditions. ‘The radius of the ‘maneuvering area about the isto be at least three G) times the length of the largest vessel for which the SPM is designed. Where it can be shown that the prevailing environment (wind, waves, current, and tides) favorably influences the mooring maneuver, ‘and that the vessel can ala manewver to and from the SPM without danger, maneuvering aea may be appropriately modiied.| Where tugs Iways be used to assist in the maneuvering area may be appropriately modied. Where mooring maneuvers are to be made in extreme ‘environment, the minimum radius is tobe increased. Fixed obstacles such as platforms or buoys, other than the mooring, are not to be anywhere within the maneuvering area, ‘The route of the submarine pipelines may be marked by a buoy at the edige of the maneuvering area. It is suggested that no other pipelines exist in the SPM ‘maneuvering area. 3/34 Swing Circle ‘The swing circle as defined in 14.1 is to be indicated and captioned on the site chart, The radius of the swing circle is the sum of the horizontal excursion of the SPM from its center position under operating hawser load and minimum tide, the horizontal projection of the length of the hawser under operating ‘hawser the length overall of the largest vessel for which the SPM is designed, and a safety allowance of 30 m (100 ft). BE 3.3.5 Water Depth ‘The water depth at any place within the maneuvering area is to be such that no vessel which may use the SPM system will touch the sea bottom or any protrusion therefrom in any sea condition under which such a vessel is expected to be present as outlined in the design premises within the maneuvering area. ‘The designer may elect to specify limiting drafts for various vessel sizes when the proposed water depth is not sufficient to allow a vessel of the maximum size to be ‘moored in the maneuvering area under the design operating environmental condition. The determination of the required water depth is to be based upon calculations, data from ship model tests or full scale tials, designers! experience or other available sources of information. The designer is to submit evidence to demonstrate to the satisfaction of the Bureau that in determining the required water depth, the following effects have been Considered: a) Vessel's dimensions and other relevant characteristics b) Wave height, wave period, and compass direction with respect to the vessel, ¢) ‘The prevailing wind and astronomical tides. ) The expected vessel's heaving, rolling and pitching and adequate vessel ude kee learance ©) The consistency of the sea bottom material or the character of any protrusion from the sea bottom. ) The level of accuracy of the depth survey data. 3.5 Soils Data 3/1.5.1 Bottom Soil Condition The general character of the soil on the sea floor throughout the maneuvering area isto be indicated on the site chart. The presence of a rock bottom or af rock outcroppings is to be clearly indicated. Where soil movements such as soil slides, excessive erosion or deposition of soll, or an active fault are an analysis by a soils consultant of the nature and degree of this hazard is to be submitted. 3/152 Sub-Bottom Soil Conditions Soil data should be taken in the vicinity of the mooring site; an interpretation of such data is to be submitted by a soils consultant. In the case of a mooring having a piled or gravity base, a boring or probing is to be ake atthe loaton of he base to the depth of any piles or to a depth sufficient to establish the soil characteristics of the site. For mooring systems with anchor piles, gravity boxes, of drag anchors, borings or probings are to be taken af all anchor locations to the depth of any piles or to a depth sufficient to establish the soil characteristics of the site, AAs an alternative, sub-bottom profile runs may be taken and correlated with at least two (2) borings or probings in the SPM vicinity and an interpretation may be made by a soils consultant to adequately establish the soil profile at all anchor pile locations. 3/7 Design Environmental Condition and Data 3.7.1 Design Environmental Conditions The design of an SPM system is to consider the following two environmental conditions: 8) Operating Condition The operating environmental condition for an SPM is defined as’ the maximum PART 3, SECTION 1[2_ Site and Environmental Conditions seastate in which a vessel is permitted to remain moored to the SPM without exceeding the allowable loads and stresses required in Parts 3 and 4 of these Rules. Wind, waves and the associated currents used in the design shall be based on site specific data, as determined by marine and meteorological consultants. ) Storm Condition The storm condition for an SPM. design is defined as the environmental condition with ‘maximum wind, waves and associated currents based on a 100 year recurrence interval. AC this condition no ‘vessel is moored to the SPM system, unless the SPM system is specifically designed for this environmental loading, The wind, waves and the associated currents are to be established by marine and meteorological consultants. 37.2 Waves 8) Operating Wave _ The characteristic ofthe wave for the operating environmental condition described in 3/1.7.1 is to be established. The wave characteristics are to include wave height in terms of significant wave height (the average of the highest one third wave heights), associated wave spectrum and associated ‘mean spectral period. b) Design Storm Wave The wave characteristics resenting the: storm condition as described in 3/1.7.1 for the design of an SPM and its anchorage are to be established based on not less than a 100 year eourrence interval. The characteristics to describe the storm wave are to include: the significant wave height and the maximum wave height, the maximum wave in terms of maximum crest elevation above mean ‘low water, an indication if the wave is expected to be a breaking wave, the wave spectrum, associated mean spectral period corresponding to the maximum wave, and the tide surge associated with the maximum wave. ‘When component parts are designed for a wave representing lesser recurrence interval, they are to be noted in the design document. ©) Wave Statistics A report is to be submitted presenting wave statistics for the mooring area. The Statistics are to be based on wave data analyzed and interpreted by a marine consultant, The statistics are to include; a table showing the frequency distribution ‘of wave height, period, and direction, and a table or ‘graph showing the recurrence period of design storm waves. It is recommended that data be obtained from a wave recorder operated in the general vicinity of the SPM for a period of time sufficiently long to establish the reliability of the wave statistics. If the site of the wave recorder is in a different water depth or different from the mooring site, an interpretation to transfer the data to the mooring site isto be performed by a marine consultant. Alternatively, data may be based on wave observation records for a'period of time sufficiently long to establish the reliability ofthe wave Statistics from a local shore station or Som published references. The bias of such observations against design storms and therefore against extreme wave heights is to be accounted for. The statistics for the maximum wave arc to be based fon wave records for a period of time sufficiently tong to establish the’ reliability of the wave statistics performed by a marine consultant. 373 Wind a) Operating Wind The wind characteristics for the operating ‘condition described in 3/1.7.1 are to be established. ‘The wind velocity is to be specified at a height of 10 m (33 ft) above the ocean surface, and averaged over a one minute period. A one-hour wind ‘with appropriate wind spectrum may be used as an alternative approach, Storm Wind The wind characteristics for the storm condition described in 3/1.7.1 for design of SPM, are to be established based on not less than a 100 year recurrence interval. The wind velocity is to be specified at a height of 10 m G3 ft) above the ocean surface, and averaged over a one minute period. A ‘one:hotic wind with appropriate wind spectrum may be used a5 an alternative approach Wind Statistics A report is to be submitted presenting wind statistics for the mooring area. The Statistics are to be based on wind data analyzed and interpreted by a marine consultant. The statistics are to include; a wind rose or table showing the frequency distribution of wind velocity and direction, a table or graph showing the recurrence period of extreme ‘winds, and the percentage of time which the operating wind Velocity is expected to be exceeded during a year and during the worst month or season. ‘Where possible, statistics are preferably to be based on data from an anemometer operated in the general vicinity of the mooring for a period of time sufficiently long to establish the reliability of the wind statistics. If the site of the anemometer is influenced by terrain for is inland, or if the mooring site is far offShore, an interpretation to transfer the data to the mooring site, performed by a marine consultant is to be submitted. Alternatively, the statistics may be based on wind velocity determined from synoptic weather chart pressure gradients for @ period of time sufficiently long. fo establish the reliability of the wind statistics performed by a marine consultant. If synoptic weather charts are not available, the statistics may be based on » 9 observations from published references. These records are to be reviewed and interpreted for the site by a marine consultant The bias of such observations against extreme storms and therefore against extreme ‘wind speeds is to be accounted for. 374 Current a) Operating Current The current characteristics for the operating condition described in 3/1.7.1 are to be ‘established. ‘The operating current is defined as the ‘maximum current associated with the maximum wind and waves in which a vessel will remain mooted. The current velocities at the sea surface and seabed are to be included. If the current profile is not linear, the velocities at a sufficient number of intermediate depths are also to be included. PART 3, SECTION 1[3 Site and Environmental Conditions ) Storm Current __ The storm current characteristics for the siorm condition described in 3/1.7.1 are to be established. ‘The current velocities at the sea surface and seabed are to be included. If the curreat profile is not linear, the velocities at a sufficient number of intermediate depths are tobe included, 3LTS — Seiche The location of the mooring site in relation to seiche nodal points is tobe investigated by a marine consultant if the site is in a basin or other area known for seiche action. Seiche is defined as long period oscillation ofthe water in a basin as excited by a disturbance such as wind, waves, ‘atmospheric pressure, or earthquake. Mooring sites located at or near seiche nodal points may be influenced by currents not otherwise predicted. If the mooring site is at or near a seiche nodal point, currents induced by seiche are to be reflected in the operating current and maximum current, and the influence af the period of the current on the dynamic response of the moored vessel is to be considered. 3.7.6 Tidal Data Tidal data is to be based on astronomical tides and storm surge. ‘The astronomical tidal extremes and tidal means for the mooring site are to be established. Sufficient dala is to be submitted to establish the validity of the tide data, Tide levels may preferably be determined from records of a tide gauge in the vicinity of the site or from published tide tables for a location in the vicinity of the site. If the location from which the tide data is obtained is from a emote mooring site, a transformation of the tide data to the mooring site is to be performed by a marine consultant, ‘The maximum storm surge for the mooring site is to be established if the mooring is in a coastal or location. Sufficient data isto be submitted to establish the validity ofthis storm surge. ‘Maximum storm surge may preferably be determined from tide records taken near the location. If the location from which the tide data is obtained is remote from the mooring site, a transformation of the tide data to the mooring site is to be performed by a marine consultant. Storm surge hindcasts for design (extreme) storms performed by a marine consultant may be subraitted. 3/1.7.7 ‘Temperatures and Ice Where drift ice may be a hazard to a mooring or to a vessel navigating to or moored at a mooring or to floating hoses at a mooring, an analysis of the nafure and degree of this hazard is to be submitted. When air temperature and precipitation, spray, or tidal action may combine to cause substantial ice formation on the mooring, an analysis of the degree to which ice may form and how this ice may affect the performance of the ‘mooring is to be submitted, ‘The structure, equipment, hoses/flexible risers, component parts and their respective material which may be affected by low temperatures are to be examined. o PART 3 SECTION. 2 Design Loads 37.1 Design Loads ‘The design conditions are to be established by varying ‘vessel size and loading conditions to determine the critical loading conditions under the enviornmental conditions described in 3/1.7. The designer is to submit calculations for the design condition. The following loads are to be considered in the design: Dead Loads and Buoyancy Environmental Loads Mooring Loads Fatigue Loads 323 - Dead Loads and Buoyancy Dead loads are the weight of the SPM structure and associated structural appendages, and equipment which are permanently attached tothe structure. ‘The buoyancy of the SPM structure results in upward forces, the distribution of which depends on the distribution of the submergence of the structure 3/25 Environmental Loads The crivironmental Toads due to the following environmental parameters ate to be considered in the design: Waves Wind Currents Tides and storm surges Tce and snow Marine growth: ‘Air and sea temperatures Other phenomena, such as tsunamis, submarine slides, fd, sbearmalcomporiion of air end wae, ait humidity, salinity, ice drift, icebergs, etc. may require special consideration, 3.51 Wave Loadings ‘The wave loads on the SPM structure and the moored ‘vessel are to be determined by suitable methods such as strip theory, diffraction theory, Morison’s equation, etc. ‘The wave loading on a tower mooring is to be in PART 3, SECTION 2/1 Design Loads accordance with the ABS "Rules for Building and Classing Offshore Installations - Part I Structures’ The Wave induced responses of a vessel consist of three categories of response, e.g, first order (wave frequency) motions, low frequency or slowly varying motions, and steady drift are to be taken into account for designing the SPM structure including the mooring line, anchors, ples, ete. as applicable. 3252 — Wind Forces For a moored vessel, wind forces on the vessel may be calculated using the coefficients presented in the document "Prediction of Wind and Current Loads on VLCCs*, Oil Companies Intemational Marine Forum Qad Edition, OCIMF), 1994. For equipment onboard ‘with unusual shape and arrangement, wind forces on such equipment may be calculated as drag forces and are to be added as necessary. Wind tunnel tests may be required in some design to determine the wind loads. ‘The wind force on the SPM structure and the moored vessel is considered as a constant (steady) force due to the one-minute wind. Altematively, the designer may use a ‘one-hour wind with appropriate wind spectrum, ‘The wind force on the SPM structure and wind exposed appendages and unusual items onboard the vessel may be calculated as drag force. The wind pressure Pypg 00 31 particular windage may be calculated using the following equations: 0.6100 x 6, Gx Hagelin 0.0623 x Cox Ch x Me Ren? 0.00338 x,x Cy xVeje bff Vang i im mvs for the first two of the above three equations, while itis in knots for the third equation, CG, = Shape Coefficient (dimensionless) C= neigh Content (Gimensionless) ‘The height coefficient C, is used in the formulation above to take into account of the effect of wind velocity (Vi) profile in the vertical plane. The height coefficient given by the following equation: C= WV g* where, the velocity of wind V, at a height z above water line is to be calculated as follows: Ve = Vigx@/ Zp V,, is to’be taken as equal to V gat elevations below the reference elevation Z Vig = Velocity of wind at an reference elevation Z,y of ‘10 m (33 feet) A = 0.10 typically for one-minute average wind, other values supported by site specific data will be specially considered, ‘The corresponding wind force F,,,0n the windage is: Frnt = Proind®A sana N (heh to) where Arvind Projected area of windage on a plane normal to the direction of the wind, in m” (®t) ‘The total wind force is then obtained by suraming up the wind forces on each windage. ‘The shape coefficients for typical structural shapes are resented (for reference only) in Table 3/2.1. The height coefficients to represent- the wind velocity profile (Corresponding to i value of 0.10) are presented in Table 372.2 for height intervals of 50 feet. 32.5.3 Current Forces For a moored vessel, current forces on the vessel alone may be calculated by using coefficients based on model test data as presented in "Prediction of Wind and Curzent Loads on VLCCs", published by OCIMF (nd Edition, 1994). For underwater bodies of unusual shape and arrangement, model tests may be required to determine the current forces. ‘The current forces on the submerged buoy and/or mooring, structure, hull of the moored vessel, mooring lines, risers cor any other submerged objects associated with the system, are to be calculated using the appropriate current profile. The basis of the current profile depends on the environmental conditions described in 3/1.7.1. Current force F, on the submerged part of the mooring structure, mooring lines, risers, etc. are to be calculated as, ‘the drag force as shown below: Fl = 4px CoxA,xu,x|u av (, 1p where: P = mass density of water = 1.025 (SD, 0.1045 (KS), 1.99 (USC) PART 3, SECTION 2|2 Design Loads CC, = drag coefficient, in steady flow (dimensionless H, current velocity vector normal to the plane of projected area in m/s (is, ts) A, = projected area exposed to current inm (nf) 312.7 Mooring Loads ‘The design loads of mooring legs, and mooring elements (exible hawsers or rigid mooring elements such as arm and yoke) between the vessel and SPM may be calculated based on physical model testing of the system, or by analytical methods verified by physical model testing of a similar system. The calculation to determine the mooring load is to include high frequency, low fequency, and mooring line dynamics, The most probable extreme ‘values are to be obtained by time domain analysis for the design storm described in 3/1.7.2 using a storm duration of three hours, unless specific site data supports other durations. 3/2.71 Operating Mooring Loads Operating mooring, loads are the loads on the SPM. structure and foundation with the vessel moored to it. The loads are to be determined in the operating environment for the established design condition as indicated in Section 3/1. Operating mooring loads are to be established and submitted for the hawser, rigid connection, between the vessel and the SPM as applicable, and the ‘SPM anchor leg loads, a) Operating Mooring Load between Vessel and SPM ‘The operating mooring load between vessel and SPM is to be established for the SPM system. The operating mooring load is defined as the maximum load imposed on the mooring element (e.g, hawser or rigid arm and yoke) for the maximum size vessél for the operating environmental condition described in 3/1.7.1, unless a smaller moored vessel is apt to impose higher loads under the influence of the operating wind, wave, current and tides as established in Section 3/1. Data and calculations are to be submitted to establish the validity of this ‘operating mooring load. ‘The operating mooring load may be statistically determined from model testing and/or analysis. The model testing and analysis on which the operating mooring load is based is to reflect the combined effects of wind, waves, current and tides on the loaded and unloaded vessel, The model testing is to model the mooring system appropriately in regard to _load-displacement characteristics, and pretensioning of mooring legs as applicable, b) Operating Anchor Leg Loads . The anchor leg loads in the operating environmental condition are to be established for the anchor leg or legs ‘with the vessel at the mooring. ‘The operating anchor leg Joad is defined as the maximum load in the most highly oaded anchor leg for the maximum size vessel for which the SPM is designed, or other vessel of a smaller size if the smaller vessel is’apt to impose higher loads. For a mooring system with several anchor legs of different size or construction, an operating anchor load is to be established for each anchor leg. Model test data and/or calculations are to be submitted to establish the validity of the operating anchor load. 32.7.2 Design Storm Loads Design storm loads are to be established for the SPM Sturt, sich anchor leg and the foundation 28 applicable for the storm condition as described in 3/1.7.1, Model test data and/or calculations are to be submitted to establish the validity of these loads. 329 ‘Fatigue Loading For tower mooring system, fatigue analysis of the structure is to be performed in accordance with the ABS "Rules for Building and Classing Offshore Installations - Part Structures", Table 3/2.1 Table 3/22 Shape Coefficients C, for Windages Height Coefficients C, gor $= 0.19) Cylindrical Shapes 0:50-1.00, Height above Waterline C ‘Hull above waterline 1.00 Z ‘a Deck House 1.00 Movers Tet J-min Isolated structural shapes 00- 153 0 = 50 1.00 (Cranes; channels, beams, 153- 305 50 - 100 Ls angles, etc.) 1.50 305- 46.0 100 - 150 131 Under deck areas (smooth) 1.00 460-610 150 - 200 140 Under deck areas (exposed 610- 769 200 - 250 147 beams and gieders) 130 760- 915 250 - 300 1.53 Truss structure (each face) (+), 125 91.5~ 106.5 300 _- 350 1.58 (©) 30% of projected block areas for both front and back sides, PART, SECTION 23 Design Loads PART 3 SECTION 3 . Structural Design and Stability 33.4 General ‘An SPM structure is generally characterized as a floating or fixed type. 33.1.1 Floating SPM Structure A floating: SPM structure consists of a buoyant hull held in position by anchor leg(s) that transmit mooring forces to the seabed, the equipment and piping “used to carry fluid cargo or products, and provides a platform for ‘hawser mooring attachment points. 313.12 Fixed SPM Structure Fixed SPM structures, such as a SALM or a tower ‘mooring, are typically supported at the seabed by piles or a gravity based foundation. A SALM is often designed as, ‘buoyant structure, while a tower mooring may be designed with tubular members. The structure supports the equipment and piping used to camry fluid cargo or products, and provides a platform for hawser (or rigid) mooring attachment points. 313.3 General Design Criteria 3/3.3.1 Strength of Structure The structure and framing members are to be of adequate size and strength to withstand the operating and storm loads established in Section 3/2. Each mooring attachment point between vessel and the SPM is to be designed to withstand an appropriate portion of the total operating mooring load on the connecting structure (hawser ‘or rigid yoke), Each anchor attachment point or pile foundation is to be designed to withstand the ‘operating load or the storm load, whichever is greater. Stress levels due to loads as determined from Section 3/2 are to be within the requirements given in 3/3.$ and 3/3.7. 33.3.2 Pile Foundation For an SPM structure intended to be anchored by piles, the pile design is to be in accordance with the appropriate sections of “API RP 2A, "Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms. 33.3.3 Corrosion Control Where deemed necessary to suit the particular type and service of the structure, a reduction in scantlings in association with protective coatings with or without sacrificial anodes may be considered from those determined by the requirements in 3/3.9.1, 3/3.9.2, and PART 3, SECTION 3]1 Structural Design and Stability 3/393. The maximum reduction that will be allowed is 10% of the sbell plating, but not more than 0.125 in. G ‘mum), provided that the section modulus reduction is no ‘more than 10%, In such instances, the justification for the reduction is to be submitted for review together with the particulars of the coatings with or without sacrificial anodes including the program for maintenance. The plans are to show scantlin oth slay icenied "Whee aby St ibe propos reductions are approved, a notation will be made in the Record that such reductions have been taken, ‘Where scantlings and structural design are determined by the requirements of 3/3.5 and 3/3.7, or by alternative structural design methods other than the requirements in 3/3,9, the following apply: a) Where effective methods of corrosion control are provided, additional scantlings may not be needed. ‘The particulars of the coatings with or without sacrificial anodes including the program for ‘maintenance are to be submitted. v) Where effective methods of corrosion control are not provided, the elena to be suitably incr ‘a margin based on expecte rates of corrosion particular to the SPM's location and the type of corrosive environment in contact with the structure. The scantling increases are to be submitted to the Bureau for review. 3135 Stresses 3/381 Structural Analysis ‘The overall structure of the SPM buoy is to be analyzed using appropriate mitthods, such as frame analysis or finite element methods to determine the resultant stresses {for each member, under the loadings stipulated herein. A complete analysis is to be submitted for each of the structural frames for review. Full consideration is to be taken of secondary stresses, carry over moments, etc, and of three dimensional aspects such as direction of applied forces or reactions. Consideration is to be given to the need of analysis for each loading condition, including the following: 4) Transmission of the operating hawser (or yoke) load from the hawser (or yoke) attachment point(s) to the anchor leg attachment point(s) or tothe foundation, ) Application of the. maximum anchor load to the anchor leg attachment point including application of appropriate wave and hydrostatic loads, in the case of a floating structure, ©) Application of the maximum wave, maximum wind and maximum current loads in the case of a fixed « structure, 33.5.2 Bending Stresses 8) Provisions Against Local computing bending stresses, the effective flange areas are to be reduced in accordance with accepted "shear Jag" and local buckling theories, Local stiffeners are to be of sufficient size to prevent local buckling or the allowable stress is to be reduced proportionately. ») Consideration of Eccentric Axial Loading In the consideration of bending stresses, elastic deflections ‘ae to be taken into account when determining the effects of eccentricity of axial loading and the resulting bending “moments superimposed on the bending ‘moments computed for other types of loadings. 3/383 Buckling Stresses ‘The possibility of buckling of structural elements is to be specially considered in accordance with 33.73. For & ‘SPM structure, the buckling of tubular members is to be evaluated in accordance with ABS “Rules for Building and Classing Offshore Installations: Part 1 Structures", 3135.4 © Shear Stresses ‘When computing shear stresses in bulkheads, plate girder ‘webs, or shell plating, only the area of the web is to be considered effective. The total depth of the girder may be considered as the web depth. 313.7 Allowable Stresses 33.7.1 General ‘The members of effective structural elements of the SPM structure are to be analyzed using the loading conditions stipulated below and the resultant stresses. are to be determined. For each loading condition considered, the following stresses are to be determined, and are not to exceed the allowable stresses in 3/3.7.2. ) Stresses due to combined gravity, environmental and ‘mooring loading at operating design condition as described in 3/1.7.1. 9) Suess due ta combined gravity, cavironmental and ‘mooring loadings at design storm condition as =a, 313.72 Member Stresses Individual stress components and, as applicable, direct combinations of such stresses, are not to exceed the allowable stress F, as obtained from the following equation. FBS. PARTS, SECTION 3[2 Structural Design and Stability, F, ~ specified minimum yield point or yield strength as defined in Part 2 of the ABS "Rules for Building and Classing Mobile Offshore Drilling Units". FS. = factor of safety for design operational loadings as defined in 3/3.7.1a = 1.67 for axial or bending stress = 2.50 for shear stress for design storm loadings as defined in 3/3.7.1b = 125 for axial or bending stress = 1.88 for shear stress 3/3.1.3 Buckling Considerations Where buckling of a structural element due to compressive or shear stresses, or both is a consideration, the compressive or shear stress is not to exceed the ‘corresponding allowable stress F as obtained from the following equation. FoF,/FS. critical compressive or shear buckling stress of the structural element, appropriate to its dimensional configuration, boundary conditions, loading pattern, material, et. FS. = factor of safety = 167 for design operational loadings as defined in33.72 = 125 for design storm loadings as defined in38.72 33.74 Members Subjected to Combined Axial Load and Bending a) When structural members are subjected to axial compression in combination with compression due to bending the computed stesses are to comply with the following requirements: + whea fF, S015 (fF) * dF) $1.0 when {JF > 0.15 Cohe C-fiF JF, $0 fdFa* and in addition, at ends of members: 187 (F/F,)+ fy F,) S10 for design operational Cees loadings as defined 38.72 125 YF) + fyF_) $1.0 for design storm loadings as defined in 3/3.7.2 ¥) When structural members are subjected to axial tension in combination with tension due to bending, the computed stresses are to comply withthe following requirements: Sat hes F161 for design operational loadings as defined in372 + hs kas for design storm loadings as defined in 3/3.7.2 However, the computed bending compressive tess, /, taken alone shall not exceed F, where, Zq = computed axial compressive or tensile stress Zy = computed compressive or tensile stress due to bending F,, = allowable axial compressive stress, which is to be the least of the following 1) Yield stress divided by factor of safety for axial stress specified in 3/3.7.2 2) overall buckling stress divided by factor of safety specified in 3/3.7.5a 3) Local buckling stress divided by factor of safety for axial stress specified in 3/3.7.5b Fy, allowable axial compressive stress due to bending, determined by dividing the yield stress oF local buckling stress, whichever is less, by the factor of safety specified in 3/3.7.2 Pe _S513E (iy FF, = Euler buckling stress, may be increased 1/3 for combined loadings as defined in 3/3.7.2 E = Modulus of Elasticity 1 = unsupported length of column K = effective length factor which accounts for support conditions at ends of length /. For cases where lateral defections of end supports may exist K is not be considered less than 1.0, r= radius of gyration Cp = i8 a coefficient as follows 1) For compression members in frames subject to joint translation (sideways), C,, = 0.85 2) For restrained compression members in frames braced against joint translation and not subject to transverse loading between their supports, in the plane of bending. Cy 0.6 - 0.40/84) PART 3, SECTION 3/3. Structural Design and Stability Dut not less than 0.4, where Mj/M@, is the ratio of the'smaller to larger moments at the ‘ends of that portion of the member un-braced in the plane of bending under consideration. ‘The ratio Mj/M,is positive when the member is bent in reverse curvature and negative ‘when itis bent is single curvature. 3) For compressive members in frames braced against joint translation in the plane of Joading and subject to transverse loading ‘between their supports, the value of C,, may bbe determined by rational analysis. However, in liew of such analysis the following values may be used: (@) for members whose ends are restrained, Cy=085 * © for members whose ends are unrestrained, Cy = 1.0 ‘33.78 Column Buckling Stresses 8) Overall Buckling For compression members which are subject to overall column buckling, the critical buckling stress is to be obtained from the following equations, uy when Ki/r < /(Qn*E/F,) Fr, WE in? when Ki/r 2 (2x7 E/F,) Fz, = critical overall buckling stress #, = as defined in 33.7.2 EXKilr, are defined in 3.7.40 ‘The factor of safety for overall column buckling isto be as follows. For gravity and mooring loading as defined in 3/3.7.2 ==) rs-1e (isos Gee when KUr2 [@rE7F) FS. = 192 when Kr 2 axe7B) For combined loadings as defined in 3/3.7.2 Kt) (Qr EIR) when KUr< @xtE7B) FS = 144 FS. = 125 ¢ 1+0.15 when KUr> @x*E/5) b) Local Buckling Members which are subjected to axial compression or compression due to bending are to be investigated for local buckling, as appropriate, in addition to overall buckling as specified in 3/3.7.5a. In the case of unstiffened or ring-stiffened cylindrical shells, local buckling is to be investigated if the Proportions of the shell conform to the following relationship. Dit> E/9F, D = mean diameter of cylindrical shell # = thickness of cylindrical shéll (expressed in the same units as D), Band F, are as defined in 3/3:7.5a 3/3.7.6 Equivalent Stress Criteria for Plated Structures For plated structures considered on the basis of the equivalent stress criterion and analyzed in accordance with the loading given in 3/1.7.1, the factors of safety will be specially considered. 33.9 Structural Design ‘The hull and frame(s) which are part of the floating structure are to be designed. in accordance with the requirements of 3/3.5 and 3/3.7._ In addition to those requirements, the scantlings of plating, stiffeners, and beams are to meet the requirements of 3/3.9.1, 3/3.9.2, and 3/3.9.3, Alternatively the hull and frame design isto be based’ on a systematic analysis based on sound engineering principles and accounting for the external static and dynamic pressures imposed by the marine environment and the internal pressure of the contents of tanks and floodable compartments. 3/3.9.1 Plating a) Hull and Watertight Bulkhead Plating Hull plating is to be of the thickness derived from the following ‘equation. PART 3, SECTION 3/4 Structural Design and Stability 1 = Gk J(@h) 1254) +2.5 mm 1 = (@ YG) 1460) + 0.10 in, ‘but not less then 6.5mm (0.25 in.) or s /150 + 2.5mm (@/150-+ 0,10 in.) whichever is greater 1 = thickness in mm or in, 5 = stiffener spacing in mm or in. k= G.075 2-207 @+0272) (sas) =1(@2 = aspect ratio of the panel (longer edge/shorter edge) q=235/Y (Nimm?), 24/7 (kgffmm?) or 34,000/Y (psi) Y = specified minimum yield point or yield strength in Nimm? (kgimm?, psi), or 72% of the specified minimum tensile stength, whichever is the lesser +h = for plating, the greatest distance in m or ft from the lower edge of the plate to the highest wave crest level: during the most unfavorable design situation, of 1.0 m (3.28 ft), whichever is greater. b) Tank Plating Where the internal space is a tank, the design head h, in association with the equation given in a), is to be taken from the lower edge of the plate to 4 point located at two thirds of the distance from the top of the tank to the top of the overflow or 1.0 m 2.28 8), whichever is greater. Where the specific gravity of the liquid exceeds 1.05, the design head, h, in this section is to be increased by the ratio of the specific gravity to 1.05. 3/3.9.2 _Stiffeners and Beams ‘The section modulus SM of each bulkhead stiffener or beam in association with the plating to which it is attached, is not tobe less than obtained from the following equation. SM = /ohs 1? cm? (in) 7.8 (0.0041) ¢¥ 0.9 for stiffeners having clip attachments to decks or flats at the ends or having such attachments at one end with the other end supported by girders = 1.00 for stiffeners supported at both ends by girders +h = vertical distance, in m (A), from the middle of length { to the same heights to which h for plating is measured (see 3/3.9.1a) 5 = spacing of stifeners, in m (R) J Iength, in m or ft between supports. “Where brackets are fitted at shell, deck, or bulkhead ‘supports, and the brackets are in accordance with Table 3/3.1 and have a slope of approximately 45 degrees, the length / may be measured to a point ‘on the bracket located at a distance from the toe ‘equal to 25% of the length of the bracket. 3/393 Girders and Webs a) Strength Requirements Each girder or web which supports a frame, beam, or stiffener is to have a section modulus SM not'less than obtained from the following equation. SM = fens cm (in) = 4.74 (0.0025) emis f= vertical distance, in m (f), from the middle of s in the case of girders or from the middle of ! in the case of webs, to the same heights to which for plating is measured (see 3/3.9.1a) ‘sum of half lengths, in m (ft) (on each side of girder or web) of the stiffeners or beams ‘Supported T= Iength, in m (ft), between supports; where brackets are fitted at shell, deck or bulkhead supports, and the brackets are in accordance with Table 3/3.1 and have a slope of approximately 45 degrees, the length / may be measured to a point ‘on the bracket located at a distance from the toe ‘equal to 25% of the length of the bracket Where efficient struts are fitted connecting girders or ‘webs on each side of the tanks and spaced not more than four (4) times the depth of the girder or web, the section modulus SM for each girder or web may be one-half that obtained from the above, ») Proportions Girders and webs are to have a depth not less than 0.125 7 where no struts or tes are fitted, and 0.0833 ! where struts are fitted. The thickness iS not to be less than 1 % of depth plus 3 mm (0.12 in.) but need not exceed 11 mm (0.44 in). In general, the depth is not to be less than 2.5 times the depth of cutouts. ©) Tripping Brackets Girders and webs are to be supported by tripping brackets at intervals of about 3 m (10 ft) near the change of the section, Where the ‘width of the unsupported face plate exceeds 200 mm (8 in), tripping brackets are to support the face plate. 313.11 Stability ‘The hull is to be divided by bulkheads into watertight compartments. Watertight manholes are to be provided for access to all main floodable compartments PART 3, SECTION 3|5 Structural Design and Stability 3.111 Intact Stability ‘The hull isto be stable uider the following conditions. a) Incalm water without mooring leg(s) in place ) During instaltation ©) In the operating environment with all mooring lees in place and pretensioned under the operating hhawser load 4) Under tow, ifthe buoy is towed ‘The designer is also to verify the following: 1. Positive GM providing adequate intial stability in the calm water condition ‘without any mooring Jeg(s) in place. 2, Sufficient reserve stability to withstand the overturning moments caused by the environmental and operational loads during towout, installation and operation. The waterline at any equilibrium condition is to be below the first dowaflooding point. 3. The compartments are to be arranged so that the hull or buoy will not capsize or sink due tothe pull of the anchor legs under pretension and of the underbuoy hosesflexible risers under the design storm condition. 33.AL2 Damage Stability ‘The designer isto verify that the buoy has enough reserve buoyancy to stay afloat in a condition with one ‘compartment (adjacent to the sea) damaged. Tt is also required to verify that the waterline is below the rst downflooding point in a damage equilibrium condition with one compartment damaged under the design operating condition, 33.13 Fixed Mooring Structure ‘The fixed mooring structure is to be analyzed as a space frame taking into account the gravity, functional, .-environmental and mooring loads. ‘The analysis isto take into account operating and maximum conditions. For SALM type of mooring structure, the analysis is be in accordance with the requirements of 3/3.5 and 3/3.7. The connections between vessel and fixed mooring piatform other than those stated in Section 3/4.9 should be adequately designed. The design of the fixed mooring platform is to withstand the operating and storm condition as described in 3/17.1, A structure with buoyant structural elements is to meet requirements of 3/3.5 and 3/3.7, while a tower mooring’ structure designed as a sravity based fixed structure with tubular members is o be in accordance with the requirements of the ABS "Rules for Building and Classing Offshore Installations: Part 1 Structures” 33.15 Additional Structural Requirements An appropriate system is to be designed to prevent damage to the cargo transfer system due to impact from attendant vessels, 3317 Buoyancy Tanks for Hoses/Flexible Risers The buoyancy tank provides buoyancy t6 support the ‘weleht of hosts and flexible ase belonging toe Sagle point mooring system. ‘The average shell membrane stress at the test pressure is to be limited to 90% of the minimum specified yield strength when subject to hydrostatic testing, and to 80% of| the yield strength under pneumatic testing, The combination of average shell membrane stress and ‘bending stress at design operating pressure is to be limited to 50% of the ultimate strength, or the minimum specified yield strength whichever is less. When the external Pressure is not compensated by internal pressure the stress ‘Values are also to be checked against critical buckling. PARTS, SECTION 3)6 Structural Design and Stability TABLE 33.1 Thickness and Flanges of Brackets and Knees Millimeters Inches Depth of Width Depth of math Longer Thickness oe Longer Thickness* of Arm Plain Flanged Flange ‘Arm Plain Flanged Flange 150 63 60 0.26 175 70 75 028 200 70 65 30 9.0 030 026 1 225 78 65 30 105 032026 1 250 80 65 30 120 034 028 1a 215 80 10 35 1s 036 0.28 1a 300 83 70 35 15.0 038 030 134 325 90 70 40 16.5 040 030 134 350 9.0 78 40 180 0420322 375 9.5 73 45 195 os 0322 400 10.9 18 45 210 046034 2s 425 100 80 45 225 04803424 450 10.5 80 30 240 050 0362 475 110 30 50 25.5 052 036 = 2a 500 110 85 55 270 054 03824 525 1s 83 58 28.5 055 03823 550 20 85 35 30.0 058 = 0403 600 2s 90 6 33.0 0a 3u4 650 130 95 65 360 om 8 310 700 140 95 7 39.0 046 334 750 Ms 100 15 42.0 os 4 800 103 80 450 * 050 4s 350 105 85 900 110 90 950 1s 90 "The thickness of brackets isto be sutably increased in cases where the depth at throat is less than two thirds that 1000 4s 95 of the knee, 1050 120 109 1100 125 105 1150 125 io 1200 130 110 PART 3, SECTION 3|7 Structural Design and Stability PART 3 SECTION 4 Mooring and Anchoring 3/41 General ‘The mooring legs and anchors of an SPM are to be designed to protect against the failure of the underbuoy hose’ or riser with one anchor line broken, for the design environmental conditions described in 3/1.7.1. 3/43 Anchor Points ‘The’anchors are to be designed to have adequate holding capacity. For mooring systems with drag anchors, the holding capacity of cach anchor is to be determined by using the soil characteristics of the bottom samples. The type of anchorage for the anchor leg(s) is to be selected according to conditions of the seabed and the maximum design anchor load. ‘The design factor of safety with respect to the holding capacity of the anchor is not to be less than 2.00 for the operating condition with the vessel moored to the SPM, and ot less than 1.50 for the design storm condition (without the vessel). Where lower factors of safety of anchor leg(s) are desired with additional mooring analysis for any one line broken case as indicated in 3/4.5, the factor of safety on the holding capacity of the anchor in a broken line case for the operating condition should not be Tess than 1.60. In case of an SPM system using anchor piles, it recommended that pile foundations be designed to comply with the appropriate sections of API RP 2A. A pile dsiving record or pile grouting record is to be taken and submitted for each pile. ‘The method of installation of the piles and the equipment employed is to be included in the pile driving record. ‘Where the anchoring system uses gravity boxes, resistance against sliding, uplifting, and overturning of the gravity boxes are to be analyzed. The forces due to environmental, gravity and mooring are to be taken into account appropriately. Scour effects on the gravity boxes are to be considered in the design. On deployment of the mooring system with drag anchors, each, mooring line is to be pull tested to 80% of the ‘maximum design load and is to be held at that load for 30, ‘minutes in presence of the Surveyor. Calculations or data ‘rom prior experience are to be submited to support the choice of anchorage system and number of anchor points. See also 3/1.5.2, 345 Anchor Legis) ‘The components of each anchor leg are to be designed with the following safety factors of against breaking. Design Storm Condition without vessel All Lines Intact 250 Design Operating Condition with vessel AUl Lines Intact 3.00 PART 3, SECTION 4|1 Mooring and Anchoring Lower factor of safety of 2.50 against the minimum breaking strength of the anchor leg component(s) will be allowed for the design operating condition if a mooring analysis of the mooring system with any one line broken mecls a factor of salety of 2.00 with to the minimum breaking strength of anchor leg components). ‘The mooring structure of a fixed SPM system is to be designed in accordance with 3/3.13. 37 Anchor and Chains Anchors and chains are to comply with the requirements f 2/111 and 2/.15 ofthe ABS "Rules for Buiding and Classing Mobile ‘Oashore Dailing Units. Equipment designed to other standards wil be Specially conic 3/49 Mooring between Vessel and SPM ‘When hawsers are used as the connecting links, they are to be designed using the following factors of safety on the breaking strength of the weakest part. ‘The strength of ropes or hawsers is to be determined in accordance with and certified to the latest version of "OCIMF Prototype Rope Testing". The breaking strength of spliced rope is to bbe established by appropriate testing. The breaking strength of the hawser to be used is to be the lower value of the hawser in wet or dry condition. with one fairlead, FS. = 1.67 with multiple fairleads, FS. = 2.50 Where the vessel is moored to the SPM using hawsers running through more than two (2) fairieads on the vessel, the hawser loads are to be calculated as if there are only ‘two (2) fairleads, : Hawser manufacture is to comply with the "OCIMF Quality Control and Inspection during the Production of Bawsers’, When a rigid mooring structure is used as the mooring structure between the vessel and the SPM, the connecting Structures are to comply with 3.7.5 of the ABS "Rules for Building and Classing Mobile Ofishore Drilling Units". 3411 Structural Components If not indicated elsewhere in these Rules, the structural and mechanical components (mooring hardware, ©, connecting links, shackles, etc.) which transmit the mooring loads are to be designed to the greater of the following two loads: a) 2.50 times the maximum design anchor leg (or mooring line) load in design storm condition. b) 3.00 times the maximum design anchor leg (or Mooring line) load in operating condition. Part 4 Equipment and Systems PART 4 SECTION 1 Cargo or Product Transfer Systems 4/11 General ‘The provisions of this section are applicable to the cargo or product transfer system and associated components of single point moorings (SPM). The cargo or product, transfer system includes all system components from the seafloor connection to a pipeline to the first ange on the loading tanker or other type of unit. Pipe Line End Manifolds (PLEMS), if provided, are to comply with the provisions of this section, 41.1.1 Conditions Applicable Connection ‘The following conditions apply to the PLEM or connection between the undersea pipeline and the underbuoy hoses/flexible risers, a) It is to be anchored to the sea bottom to resist forces due to waves, current, and forces imposed by the SPM and the undersea pipeline, ) A means of closure is to be provided to permit isolation of the SPM from the undersea pipeline. to Pipeline 43 Materials Refer to 2/1.7 for material requirements for cargo or product transfer systems, 4s 41 ‘The length of the hose/flexible riser system, provision for ‘buoyancy, spreaders between hoses/flexible risers, external restraints’ (if required) and angle of connection to the pipeline end and the SPM are to be established taking into account at least the following. ) Maximum excursion of the SPM structure both under the operating conditions with a moored vessel and the design conditions without a moored vessel ) Motion of the components of the system. ©) External forces on the hose/flexible riser system, ) Range of specific gravity of the contents of the hose/flexible riser system including the various ‘cargoes anticipated and sea water. General 41.5.2 Underbuoy Hoses/Flexible Risers The system is to be designed to avoid chafing of underwater hoses/flexible risers due to contact with the SPM hull or buoy, anchor legs or applicable mooring system, seabed, and other hoses/Mexible risers (if any). System designed with wear protection against incidental PART 4, SECTION 1|1 Cargo or Product Transfer Systems ately reinforced hoses/flexible risers in areas of maximum hoselfexible riser flexing are to be Provided. The procedures for installation, temoval (if applicable), and maintenance are to be submitted for review. 4.5.3 Floating Hoses Lifting arrangements are to be provided at the end of the floating hose. Special hose is to be provided at the vessel end to accommodate the bendi Contamination of the sea water. Consideration is t0 be given to providing swivels, cially reinforced hose, or both, atthe connection” oF the ‘vain hose ith components of the SPM system. "Consideration i 19 be given to providing a breakaway coupling with shut of Valves in each floating hose stag te provide surge and axial overload protection to the hose string, and to minimize polution in the event of an excesive pressure Surge or tanker breakout 41.84 Construction All hose is to comply with the OCIMF "Guide to Purchasing, Manufacturing and Testing of Loading and Discharge Hoses for Oftshore Moorings" and is be manufactured to the Survey and Inspection of the Bureau. Prototype hose approval in accordance with Part B of this standard is required. * Wariances from the OCIMF "Guidé to Purchasing, Manufacturing and Testing of Loading and Discharge Hoses for Offshore Moorings" as required to satisfy the system's operating conditions will be considered on a case by case basis. Adequate justification for such variances ‘will be required. ‘The bolting and gasket materials and design are to comply with an applicable recognized design standard and be sultable for their intended service Flexible risers, if utilized, are to meet the requicements found in the ABS "Guide for Building and Classing Undersea Pipetine Systems and Risers" and API RP 173 “Recommended Practice for Flexible Pipe” MLSS System Design Pressure Design pressure is defined as the larger of: 4) The shut-off head at the vessel's manifold at zero flow, plus the gravity head of the contents to the part of the ‘SPM pipe or hose in question. ») The head calculated due to surge pressure, resulting from design valve closing times. 41.5.6 Testing Each length of hose is to be subjected to hydrostatic and ‘vacuum tests in accordance with requirements of 1.11.6 and 1.11.8 respectively of the OCIMF "Guide to Purchasing, Manufacturing and Testing of Loading and Discharge Hoses for Offshore Moorings". These tests are to be witnessed by a Surveyor. In all cases where the design pressure of the system exceeds 15.5 bar (15.8 kgf/em?, 225 psi), the hydrostatic test is to be carried out at not less than the design pressure. Where flexible risers are used, they are to be tested using recognized standards, 41.7 Cargo or Product Swivels and Related Systems and Equipment 4/17 Cargo or Product Swivels a) Design Cargo or product swivels are to be of steel construction with flanged or welded connections. Details of the swivel connecting stationary SPM piping with rotating piping are to be submitted for approval. Such details are tO include fixed and rotating parts details, plate thicknesses, nozzle locations and arrangement, seal and bearing design, and welding. The swivel design is to consider the most adverse combination of applicable loads, At least the following loads are to be considered: L. Breakaway torque required for each swivel at ‘maximum design pressure ‘Weight of swivel and its structural components ‘Dynamic loads due to vessel motion Piping loads Mooring forces Pressure loads 7, Thermal loads Pressure retaining components of the swivel are to be designed in accordance with a recognized standard such as the ASME Boiler and Pressure Vessel Code, Structural components of the swivel and driving ‘mechanism are to comply with Section 3/3 of these Rules, the ASME code of other recognized structural design standard, b) Testing Testing is to be conducted at the manufacturer's plant in accordance with an approved test procedure in the presence of a Surveyor. The procedure is to address acceptable leakage criteria and is to specify the following tests as a minimum: 1, Hydrostatic pressure test to at least 1.5 times the design pressure for at least two (2) hours. 2. Hydrostatic’ pressure test to design pressure ttuough two" (@) complete revolutions in each direction at arate of approximately ten (10) minutes per revolution. PART 4, SecTiON 1]2 Cargo or Product Transfer Systems 3. Hydrostatic pressure test to design pressure through four () complete revolutions, The art evolution is to be clockwise, and the final counterclockwise, Each rotation is to be in stages (of 30 degrees ata rate of approximately 30 seconds pet 30 degrees with a 30 second pause between each 30 degree rotation. For each 30 degree rotation, the breakaway torque and the rotating torgue are to be recorded. Where fluid assembly swivel rotates in unison with mooring swivel, this test is to be conducted on the combined system. 4/..2 Leak _ Monitoring, Pressurization System: All piping for leak recovery and pressurization systems is to be of steel construction or equivalent and designed in accordance with ASME B31.3. ‘A. pressure balanced, or over-pressured, isolation seal shall be used between the primary seal and the product in 2a of gas containing production fuid swivels. Recovery and 41.73 Bearings a) Mooring Bearings Bearings which carry the operating hawser load, rotating ‘structure load and ‘mooring load are to be designed with a safety factor of not less than 2 without destructive yielding of the bearing surfaces. Bearing mounting bolts are to be designed in accordance with recognized standards, For high tension bolts stress corrosion cracking is to be considered. b) Swivel Bearings Swivel bearings that do not carry the hawser load are to be designed in accordance with AFEMA Codes (Anti Friction Bearing Manufacturers Association) or other recognized industry standards. 4.74 Corrosion Protection ‘The swivels are to be coated on the outside with a suitable corrosion resistant coating. ‘This coating will not be required for parts made of corrosion resistant material The possibility of corrosion due to the presence of CO,, ©, oF HS in the cargo or product fluid is to be considered in the swyivel design, 4.9 Cargo or Product Piping Systems 4.9.1 Piping ‘All piping for the cargo or product transfer system mounted on the SPM is to be of steel with or flanged connections. Piping is to be securely mounted on the SPM and anchored to resist the forces resulting from internal pressure and flow in the system and loads induced by the hose/flexble riser system connected to it. Provision ig to be made for expansion. Piping is to be shop tested after fabrication to a minimum pressure of 1.5 times the design pressure in the presence of a Surveyor. cr product piping installed on SPMs is to comply with ASME B31.3 except that piping less than Standard weight should not be used. Standard weight pipe is ¢ defined as the American National Standards Institute ‘Schedule 40 up to a maximum wall thickness of 9.5 mm (0.375 in). 41.9.2. Valves A shut-off valve is to be provided on the SPM for each cargo transfer line, ‘Valves are to be of steel construction and capable of manual operation. Valves are to. be constructed and tested in accordance with recognized standards “such as those: of the American National Standards Institute (ANSD. Non-standard valves. are those valves that are not certified by the manufacturer a3 complying with a recognized standard. ‘The use of non- standard valves is subject to special consideration and drawings of such valves showing details of construction and materials are to be submitted for review, as well as the basis for valve pressure rating, such as design calculations of appropriate burst test data. 4.9.3 Flanges and Fittings Flanges and fittings are to be constructed and tested in accordance with recognized standards such as those of the American National Standards Institute (ANSD. Non Sandard flanges and fittings are those components that are not certified by the manufacturer as complying with a Tecognized standard. ‘The use of non-standard flanges and Stings is subject to special consideration and drawings of such “components showing details of construction, materials and design calculations or test results ae to be submitted for review. 41.9.4 Expansion Joints Expansion joints are.to have a maximum allowable working pressure of no greater that one third of the hydrostatic bursting pressure of the joint, For non- metallic expansion joints, cross sectional drawings of the joint showing construction of the joint including end Fiting attachment and a bill of materials are to be submitted for review. For metallic bellows expansion Joints, cross sectional drawings of the joint along with a bill of materials are to be submitted for review. Calculations verifying that the expansion joint has been designed in, accordance with the Expansion Joint Manufacturer's Association (EJMA) Standards or other applicable recognized codes or standards, and is suitable {or its intended use are also tobe submitted for review. 4.9.5 PLEM Piping The requirements of 4/191, 4/1.9.2 and 4/1.93 are also applicable to the piping, Valves, flanges and fittings forming the Pipe Line End Manifold (PLEM). 4119.6 Corrosion Protection ‘The cargo or product piping, valves and fitings are to be coated on the outside with a suitable corrosion resistant coating. This coating will not be required for parts made of corrosion resistant material. The possibility of corrosion due to the presence of CO,, O,, or HS in the ParT4 section 113. Camo or Product Transfer Systems cargo or product fluid is to be consides design, red in the piping PART 4 SECTION 2 Ancillary Systems and Equipment 42.1 General Ancillary systems such as hydraulic, pneumatic, fuel, ballast, telemetry, controls; etc. which may be provided on a single point mooring are to comply with the applicable requirements of the "ABS “Rules for Building and Classing Mobile Offshore Drilling Units" except as specified in this section, 42.3 Bilge Pumping ‘Single point moorings are to be provided with a means for pumping from and draining all tanks and void compartments. Pumping by means of a portable hand operated pump would be acceptable in lieu ofa Sxed bilge system. 42.5 Tank Sounding ‘A manual means of sounding is to be provided for all tanks and void compartments, 42.7 Tank Venting All tanks that are filled or emptied through fixed purhping arrangements and all voids which pressure piping [passes are to be fitted with vent pipes. ‘The structural arrangement of tanks or voids requiring a vent is to be such as to permit the free passage of air and «gasses from all parts of the spaces to the vent pipes. Each tank or void requiring a vent is to be fitted with at least fone vent pipe, which is located at the highest part of the tank. Vent pipes are to be arranged to provide adequate self-drainage under normal conditions. » Vent outlets on the open deck are to terminate by way of return bends, Satisfactory means, permanently attached, are to be provided for closing the vent pipes. ‘The internal diameter of each vent pipe is not to be less than 51 mm (2 in.) unless specially approved otherwise. Where tanks ‘are to be filled by pump pressure, the aggregate area af the vents on the tank is to be at least 125% of the effective arta of the filling line. Notwithstanding the above, the pump capacity and pressure head are to be considered in the sizing of the ‘vents. Vent pipes are to terminate in the weather and their hieight is to be at least 760 mm (30 in) above the deck except where this height may interfere with the working of the SPM, a lower height may be approved provided that the closing arrangements and other Cueumstances justify wer height. Part 4, SECTION 2/1 Ancillary Systems and Equipment 42.9 Ancillary Components Ancillary mechanical components such as hoists, winches, quick connect and disconnect devices, are to be designed in accordance with applicable industry standards, codes and published recommended practices. PART 4 SECTION 3 Hazardous Areas and Electrical Installations 43.1 General Electrical installations onboard single point moorings are to comply with the requirements of Section 4/3 of the ABS “Rules for Building and Classing Mobile Offshore Drilling Units" and the “additional. or modified requirements contained in this section, Alternatively, consideration will be given to installations that comply with the requirements contained in this section and applicable recognized standards, provided that they are not less effective 43.3 Hazardous Areas 43.3.1 Definitions Hazardous Areas: Hazardous areas are all those areas ‘where a flammable atmosphere may be expected to exist continuously or intermittently. rdous areas are subdivided into Zones 0, 1 and 2 defined as follows: Zone 0: A zone in which an explosive gas-air mixture is continuously present or present for long periods. Zone 1: A zone in which an explosive gas-air mixture is likely to occur in normal operating conditions. Zone 2: A zone in which an explosive gas-air mixture is not likely to occur, and if t occurs, it will exist only for a short time. Enclosed Space: An enclosed space is considered to be a ‘space bounded by decks and bulkheads which may or may not have doors, windows, or other similar openings. 4133.2 Classification of Areas ‘The area within 3 meters (10 ft) of a cargo or product swivel is considered a Zone 2 area when in a non-enclosed area. When a cargo or product swivel is installed within an enclosed space, the space is considered a Zone I area. The inside of tanks, swivels or pipes containing hydrocarbons are considefed Zone 0 areas, In addition to the hazardous areas defined above, the principles of API RP 500 Section B “Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities” are to be considered in delineating hazardous areas associated with components of the single point mooring. 435 Cables and Types of Electrical Equipment Permitted in Hazardous Areas 48.5.1 Electrical EquipmentThe following equipment and cables are acceptable for instalation in hazardous locations: a) Zone 0 Areas: Only certified _intrinsically-safe ircuits or equipment and associated ae permitted in Zone 0 areas. we ) Zone Areas: Equipment and cables permitted in Zone 1 areas are to be: 1, Certified intrinsically-safe circuits or equipment and associated wiring 2. Certified flameproof (explosion proof) equipment 3. Certified increased safety equipment; for increased safety motors due consideration is fo be given to the protection against overcurrent 4, Pressurized enclosure type __equipment (Gressurization systems are {0 comply with applicable industry standards) ‘5. Permanently installed cables with metalic armor, a metallic sheath, or installed in metallic conduit ‘with explosion proof gastight fittings. Exception: flexible cables, where necessary, may be installed provided they are of heavy duty type. ©) Zone? Areas: Equipment and cables permitted in Zone 2 areas are ali equipment approved for Zone 1 areas and the following equipment provided the operating temperature does not exceed 315°C (600°F) and provided any brushes, switching mechanisms, or similar arc-prodacing devices are approved for Zone 1 areas: 1, Enclosed squirrel-cage induction motors 2, Fixed lighting fixtures protected from mechanical damage 3. Transformers, solenoids, or impedance coils in sgeneral purpose enclosures 4. Cables with moisture-resistant jacket (impervious sheathed) and protected from mechanical damage. 43.5.2 Cable Installation Electrical conductors are to be run with a view to avoiding as far as practical, spaces where gas may normally be expected to accumilate, No cable splices are allowed in hazardous areas except in intrinsically-safe circuits. Where it is necessary to join cables in a hazardous area ParT 4. SecTiOn3I1 Hazardous Areas and Electrical Installations 8, flexible cable connections to non-flexible cables), the ints are to be made in approved junction boxes. 43.7 Electrical Swivels If installed in a hazardous area, the electrical swivel is to bbe certified by an independent testing laboratory as suitable for installation within such an area as per 4/3.3 of these Rules. ‘The amperage ratings of electrical swivels (sip rings) are to be adequate to carry the full load current of the equipment supplied. PART 4, SECTION 3|2 Hazardous Areas and Electrical installations PART 4 SECTION 4 Safety Provisions 441 Navigation Aids 4411 Obstruction Lights Obstruction lights are to be provided as prescribed by the National ‘Authority having jurisdiction. If the SPM is located outside the territorial waters ‘of any National ‘Authority or if no lights are prescribed by the authority having jurisdiction, the following is to be provided as a ‘minimum: One 360 degree white light visible for five (5) miles under an atmospheric transmissivity of 0.85, flashing six (6) times per minute, and arranged for operation at least from ‘sunset to sunrise local time. It is recommended that the floating hoses be marked with winker lights. 4/4.1.2 Bog Signal Audible fog signals are to be provided if prescribed by the National Authority having jurisdiction, 4/41.3 Radar Reflector A radar reflector is to be provided if prescribed by the ‘National Authority having jurisdiction, 44.3 Fire Fighting Equipment SPMs are to be equipped with at lest one BAI ype portable fre extinguisher, Whete the risk ofan electtcol fire also exists, one C-I type portable extinguisher is also to Eon In lieu of providing two (2) extinguishers, consideration will be given to a single extinguisher of & Spe suitable for both al and elecidl fics. ABT rated Portable extinguisher could be 9.5 liter (2.5 U.S. gallons) Foam, 67 keg (15 lb) carbon doride or 43 kg (11) dey chemical, A C-I rated portable extinguisher could be 6.7 kg (15 Ib) carbon dioxide or 4.5 kg (10 Ib) dry chemical. 4/45 —_Tdentification Marks ‘A name or number is to be assigned to each single point ‘mooring and is to conform to requirements of the National ‘Authority having jurisdiction, This name or aurmber is to ‘be permanently displayed on the structure and will be entered in the ABS Record. Draft marks are to be permanently marked in at leat two (2) places. PART 4, SECTION 4|1 Safety Provisions INDEX abbreviations 1/43, air Testing 1/2.1.3, alignment 2/2.3.2 allowable stresses. 3/3.7.1, 3/3.7.2, 313.7.3 alternate welding 2/2.9 alterations 1/3.1.8, 1/3.1.9 alternatives 1/1.5.2 anchoring 3/4 anchors 1/1.11.1, V/1.11.5, 1/2.5, 3.7.2, 3/47 anchor leg loads 3/2.7.1 ancillary systems 4/2 ancillary components 4/2.9 annual survey 1/3.1.3, 1/3.5 application of Rules 1/1.5.1 approved W/1.1.4 ballast W111, 4/21 bearing 1/1.11.1, 4/1.73 bending stress, 3/3.5.2 bilge pump 4/2.3, bottom topography 3/1.3.2 buckling 3/3.7.3 buckling stress 3/3.5.3 bulkhead plating 3/3.9.1 buoyant element 3/3.13 buoyancy tank 1/2.11.2, 3/3.17 butt weld 2/2.7 cable 4/3.5.2 cargo swivel 1/1.11.1, 1/1.13.1, Table 12.2 calculations 1/1.11.5 chains 1/3.7.2 chain stoppers 1/3. connector 1/3.7.2 continuous survey 1/3.1.5 cargo transfer 2/1.7 cargo transfer system 4/1 1, 13.7.2 classification 1/1.1 application of Rules 1/1.5.1 approved 1/114 certificates I/1.1.2 class designation 1/1.3 classification data 1/1.3.4 latitude 1/134 longitude 1/1.3.4 displacement 1/1.3.4 length overall 1/1.3.4 water depth 1/1.3.4 classification Process 1/1.1.1 fees IL.17 ‘lag state 1.15.3 liability 1/1.21 novel features 1/1.5.3 representation to classification 1/1.1.3 reports 1.1.2 scope of Classification I/1.1.4 suspension 1/15 termination 1/1.1.6 classification of areas 4/3.3.2 column buckling 3/3.7.5 combined axial and bending 3/3.7.4 controls 4/2.1 corrosion 1/1.11.1, 4/1.7.4, 4/1.9.6 corrosion control 3/3.3.3 current 3/1.7.4 current forces 3/2.5.3 damage W/1.1.5, 1/115, 13.1.1 damage stability’ 3/3.11.2 dead loads 3/2.1 definitions 1/4.1 design loads 3/2.1 design pressure 4/1.5.5 design storm loads 3/2.7.1 disagreement 1/1.19.1 displacement 1/1.3.4 draft marks 4/4.5 electrical system 1/1111 electrical installations. 1/3.7.6 electrical equipment 4/3.5.1 environment 2/2.5.1 environmental loads 3/2.5 equipment 4/2 expansion joints 4/1.9.4 factor of safety anchor 3/4.3 anchor leg 3/45 hawser 3/49 fatigue loading 3/2.9 fees 1/1.17 fillet welds 2/3.1, 23.1.2 fire fighting 4/4.3, fire safety 1/1.11.1 fitings 41.9.3 flag state 1/1.15.3 flexible risers. 4/1.5, 4/1.5.1, 4/1.5.2, 415.4, 41.5.6 floating hoses 4/1.5.3 floating production system 1/1.3.3 fog signal 4/4.1.2 general arrangement /1.11.1, /1/13.1 Birders 3/3.9.3 governmental regulations 1/1.7.2 hatches W111, /3.5.1 hawser 1/1.11.1,'1/4.1, 3/4.9 hazardous areas "1/1.11.1 height coefficient 3/2.5.2, Table 3/2.2 high strength steel 2/2.5.4 hoists 4/2.9 hoses 2/1.7, 4/1.5, 4/1.5.1, 4/1.5.4 hose testing’ 4/1.5.6 hull plating 3/3.9.1 hydraulic 4/2.1 hydrostatic testing 1/2.1.2 IACS 1/1.9 identification marks 4/4.5 inspection 2/2.5.9 load bearing 1/1115 lay-up 1/3.16 Tapped joints 2/3.1.6 Teak monitoring 4/1.7.2 local buckling 3/3.7.5 main bearing V/1.11.1, definition 1/4.1 maintenance schedule 1/1.13.1 manholes 1/3.5.1 manval 1/1.13, 1/1.13.1 manual welding, 2/2.7.1 materials 2/1.1, 4/13 measurement 1/4.5 member stresses 3/3.7.1 model test 1/1.11.4 mooring 1/1.11.1, V/1.115, VL.15.1, V2.5, 1/3.5.2, 3.7.1, 1/3.7.2, 215, 3/4, mooring hardware 3/4.11 mooring structure 3/4.9, navigation 1/1.11.1, 1/1.13.1, Table 12.2 navigation aids 4/4.1 NDT VILLI novel features 1/1.5.3 operating environment 3/1.7.1 operating current 3/1.7.4 operating mooring load. 3/2.7.1 operating wave 3/1.7.2 operating wind 3/1.7.3 other regulations 1/1.7 padeye 1/3.7.1 peening 2/2.5.6 pile 3/3.3.2 pipeline connection 4/1.1.1 pressurizing system 4/1.7.2 plans 1/111, /1.11.6 plated structures 3/3.7.6 plating 3/3.9.1 PLEM 3/1.3.1 PLEM piping 4/1.9.5 plug welds 2/3.1.7 pneumatic 4/2.1 product lines 1/3.5.2 product piping 4/1.9 product swivel 4/1.7, 4/1.7.1 ull test 1/25, 3/43, quenched 2/2.5.4 radar reflector 4/4.13 repair 2/2.5.10 riser - see flexible risers ROV 13.7.1, 13.7.2, 14.3 Rules 1/1.1.2 alternatives 1/1.5.2 application of rules 1/1.5.1 disagreement 1/1.19.1 rule Change 1/1.5.4 seiche 3/1.7.5 single point mooring (SPM) 1/1.1.2, 1/1.3.1, 1/1.33, 1/1.3.4, definition 1/4.1 site W112, 171.113, 1/71.13.1 sounding 1/1.11.1, 472.5 Special surveys 1/3.7 chain stoppers 1/3.7.1, 1/3.7.2 electrical installations 1/3.7.6 foundations 1/3.7.1 ‘gauging 1/3.7.1 structure 1/3.7.1 mooring 1/3.7.1, 1/3.7.2 padeye 1/3.7.1 ROV 13.7.1, 13.7.2, V4.3 safety equipment 1/3.7.4 swivel 13.75 surveyor 1/1.1.2, 1.13, W1.15.1, 1.15.2, 1.153, V1.19.2 suspension 1/1.1.5 swivel 1/1.11.1, 1/1.13.1, 13.7.5 stability 1/1.11.5, 3/3.11 damage stability 3/3.11.2 intact stability 3/3.11.1 standards 1/1.1.2 structural Arrangement 1/1.11.1 coaming 13.5.1 hatches W/.11.1, 13.5.1 manholes 1/3.5.1 structural design 1/1.11.5, 3/3 water tight doors 1/1.11.1 welding Details 1/1.11.1 submissions 1/1.11.7 survey 1/3.7.3, 4/1.5.5 annual survey 1/3.1.3, 13.5 continuous survey 1/3.1.5 damage 1/1.15.1, 1/3.1.1 definition 1/4.1 drydocking 1/3.3 lay-up 13.1.6 notification 1/1.15.2 product lines 1/3.5.2 reactivation 1/3.1.6 surveys after constructions 1/1.15 special periodical survey 1/3.1.4 swivel 1.5.2 welding material 13.1.9 swivel stack 1/1.11.5 tank plating 3/3.9.1 tank sounding 4/2.5, also see sounding tank venting 4/2.7, see also venting telemetry 1/1.11.1, 4/2.1, Table 1/2.2 tempered steel 2/2'5.4 termination of classification 1/1.1.6 testing air Testing 1/2.1.3 Bulkhead 172.1 ‘buoyancy tank 1/2.11.2 fittings 172.1 flexible riser 172.7, 172.11 Hose testing 1/2.1:4 Hydrostatic 1/2.1.2, 41.56 model test 1/1114 mooring 1/2.5 swivel 12.7 tank, bulkhead and fittings 1/2.1 vacuum test 41.5.6 valve 172.7 tidal 3/1.7.6 tripping bracket 3/3.9.3 tubular joints 2/3.1.8 unbracketed stiffeners 2/3.1.4 underbuoy hoses 1/1.11.1, 4/1.5.2, definition 1/4.1 venting VL11.1 water depth 1/134 water tight doors 1/1.11.1 welding 2/2.1.1 alignment 2723.2, alternate welding 272.9 back gouging 22.5.5 but weld 22.7 cleanliness 272.33 controlled gaps 23.1.5 deep penetration welds 23.1.5 edge preparation 22.3.1 electrogas weld 22.7.4 environment 2225.1 fillet welds 2/3.1, 2.1.2 ‘lame shrinking 22.5.7 ‘lux cored-are weld 22.73 forming 22.3.7 ull or partial penetration 23.3 ‘gas meta-are welding 2727.3 high srength steel 272.54 inspection 22.5.9 lapped joins 23.1.6 ‘manual welding 27.7.1 overlapped end connections 2/3.1.6a overlapped seams 2/3.1.66 peening 22.5.6 plug welds 23.1.7 preheat 22.5.3 reparation 2/2.3 procedure 272.14 production welding 2/2.5* quenched 22.54 repair 225.10 run-on/run-off tabs 22.3.5 seuence 22.5.2 slot welds 2/3.1.7 special welding 22.7.5 specification 22.1.2 stud welding 22.3.6 submerged-are welding 272.72 surface appearance 22.58 tack welds 22.3.4 tee conmections 23.1.2 tee-type end connections tempered 22.54 toughness criteria 22.14 tubular joints 23.1.8 unbracketed stiffeners weld factors Table 2/3.1 weld soundness 22.5.8 welder 2/2.1.3 welding environment 2/2.5.1 welding of piping 2/2.11 welding procedure 2/2.13 Technical Publications Fequests for publications should be made to ‘American Bureau of Shipping Book Order ‘Two World Trade Center 405th Floor New York, NY. 10048 USA Classification Register RECORD of the American Bureau of Shipping (annual) Note: The Record contains only vessels classed by ABS or with, [ABS assigned loadtine. Rules for Building and Classing: Stee! Vessots (annua) CD-ROM Version of Stee! Vessels (annual) Underwator Vehicles, Systems, and Hyperbaric Facilties (1990) Mobile Oifshore Oriting Units (1994) also available on CD- om ‘Stee! Barges (1991) also available on CD-ROM Steel Vessels Under 61 Meters (200 Feet) in Lenath (1983) Stool Vessels for Service in Southeast Asia (1982) Ofshore Installations (1985) Steel Vessels for Service on Rivers and Intracoastal Water- ways (1995) Single Point Moorings (1896) Bulk Carters tor Service on the Grest Lakes (1978) Reinforced Plastic Vessels (1978) ‘Stool Floating Drydocks (1977) ‘Aluminum Vessels (1975) Rules for: Cettification of Cargo Containers (1987) Nondestructive Inspection of Hull Welds (1986) Preliminary Rules for: Building and Classing Accommodation Barges and Hotel Barges (May 1989) Guide for: Building and Classing Facilities on Offshore Installations (1991) Building and Classing Undersea Pipeline Systems and Risers (1981) ‘Strength Assessment of Container Carriers (1991) Certification of Cranes (1891) Building and Classing Motor Pleasure Yachts, (1990) Building and Classing High Speed Craft, (1990) Cargo Vapor Emission Control Systems on Board Tank Ves- sels (1991) Application of Dynamic-Response-Based Intact Stabilty Cri teria for Column-Stabilzed Mobile Ortshore Driling Units (1980) ‘The Certication of Dring Systems (1990) ‘The Use of Refrigerated (Low Pressure) Carbon Dioxide as 2 Fire Extinguishing Medium on Board Ship (1989) Building and Classing Fishing Vessels (1989) Cettiication of Container Securing Systems (1988) Survey Based on Preventative Mainienance Techniques (1987) ‘The Certcation of Offshore Mooring Chain (1986) Classing Vessels for Standby Service (1986) Lay-Up and for Reactivation of Laid-Up Ships (1986) Lay-Up and for Reactivation of Mobile Otfshore Driling Units (1986) Underwater Inspection in Lieu of Drydocking Survey (1986) Guide for Thrustors & Dynamic Positioning Systems (1994) Uttasonic Examination of Carbon Steel Forgings for Tail ‘Shatts (1983) Building and Classing Fire Fighting Vessels (1981) Ships Burning Coal (1980) Repair and Cladding of Shatts (1980) Burning Crude Oil and Slops in Main and Auxllary Boilers (1978) ‘Construction of Shipboard Elevators (1998) List of Type Approved Equipment (1995) ‘Notes on Heavy Fue! Oil (1984) Controlled Atmosphere Systems (1892) Tho Fatigue Strength Assessment of Tankers (1993) ‘One Man Bridge Operated (OMBO) Ships (1992) Gertfication of Ot Spill Recovery Equipment (1993) Dynamic Based Design and Evaluation of Tanker Structures (1993) Building and Classing Oil Recovery Vessels (1993) Dynamic Based Design and Evaluation of Bulk Carrior Struc- tures (1994) Hull Condition Monitoring Systems (1995) ‘Assessing Hull-Girder Residual Strength for Tankers (1995) Improvement for Structural Connections and Sample Struc- tural Details-Service Experience and Modifications-for Tankers (1995) Dynamic Based Design and Evaluation of Double Hull Tanker ‘Structures Between 150 and 190 Meters in Length (1995) Improvement for Structural Connections and Sample Struc- tural Detals-Service Experience and Modifcations-fr Bulk Carters (1995) Assessing Hull-Girders Residual Strength for Bulk Carriers (1995) ‘Underwater Inspection In Lieu of Drydocking Survey (1996) Preparation for Special Survey (1986) Certification of Fs Engaged in Thickness Measurement of Hull Structures (1996) ‘Survey of Voyage Repairs to Hull Structure (1996) Building and Classing Floating Production Storage and Of- loading Systems (1996) Guidance Manual for: Preparing Fishing Vessels’ Stabilty Booklet (1990) Bronze and Stainless Steel Propeller Castings (1984) Material Selection and Inspection of Inert Gas Systems (1960) Requirements for: Certification of Self-Unloading Cargo Gear on Great Lakes Vessels (1991) Cortitication of the Construction and Survey of Cargo Gear ‘on Merchant Vessels (1975) Approved Welding Consumables (annual) Other Publications: ‘Annual Report Activity Report (o:-monthiy) ‘Surveyor (quarterly) Intemational Directory of Offices (semi-annual) e

You might also like