FOR
REQUEST FOR PROPOSAL
Atlancis Technologies Limited, 5th Floor, Top Plaza, Kindaruma Rd, Off Ngong Rd. Kilimani, Nairobi.
©2019
Page 2 of 17 Atlancis Technologies Ltd Is ISO 9001:2015 Certified
Contents
1. PREFACE ..................................................................... 4
2. INTRODUCTION ................................................................ 4
8. COMMUNICATIONS .............................................................. 9
2. INTRODUCTION
Business Continuity and Disaster Recovery (BCDR or BC/DR) are closely related
practices that describe an organization's preparation for unforeseen risks to
continued operations. The trend of combining business continuity and disaster
recovery into a single term has resulted from a growing recognition that both
business executives and technology executives need to be collaborating closely
instead of developing plans in isolations.
Atlancis has designed its solution that enables CO-OPERATIVE BANK as a company to
increase resilience by designing critical functions and infrastructures with various
disaster possibilities in mind; this data redundancy across entire infrastructure
and maintaining a surplus of capacity. Ensuring resiliency against different
scenarios can will also help businesses maintain essential services on location and
off-site without interruption.
Rapid recovery to restore business functions after a disaster is crucial. Setting
recovery time objective for different systems, networks or applications is paramount
in our design which shall help prioritize which elements need to be recovered first.
Other recovery strategies include resource inventories, agreements with third
parties to take on company activity e.g. back-to-back hardware support with vendors
and using converted spaces for mission-critical functions.
Atlancis shall discuss during pre-implementation and shall agree with CO-OPERATIVE
BANK, put in place the contingency procedures for a variety of some scenarios that
can include a chain of command that distributes responsibilities within Atlancis as
vender and the CO-OPERATIVE BANK as an organization. These responsibilities can
include hardware replacement, leasing emergency office spaces, damage assessment
and contracting third-party vendors for assistance.
Name of company:
Main contact:
Phone number:
Email address:
Street address:
City:
The identified location of the backup site will be accessible for a minimum
period of six (6) weeks from initial date of occupancy after disaster
declaration. It will be available for 24-hour access and retrieval and be
protected by: security, fire suppression, water detectors, heating, air and
ventilation.
Offsite storage process will include, but is not limited to, the following. All
documentation of importance to the operations of CO-OPERATIVE BANK will be
stored via this backup site.
Backup Tapes - Weekly tape backups of ALL your disk files. These include:
Engineered systems, mid-range, servers and PCs (mandatory and with at least
two generations)
System, program product, and in-house developed software manuals and guides
Legal - Copies of contracts, leases, legal and critical correspondences
Insurance – Policies, riders, and addendums
Financial - General and private ledgers, year-end financial statements, tax
returns, bank records
Recovery Plans - A complete set
Assets - Complete fixed asset listings
Referenced Items - Copies of any item referenced within your recovery team
plans
Floor plans
Architectural drawings that should include mechanical plans
Photos of facility and various work areas
Other critical documents or data critical to the operation of your business
6. READINESS PLAN
Atlancis relies on CO-OPERATIVE BANK to provide us certain equipment,
supplies, materials, goods or services. Some of these are considered
more critical than others.
Atlancis will avoid a single source (sole source) provider of any equipment,
supplies, materials, goods or services. That is, Atlancis will always have
at least two vendors that can provide each of our critical goods and
services required to support our business.
The objectives of risk management and business continuity planning are to:
This document provides policy and guidance in identifying, assessing, recording and
treating risks that could impact upon the project and as appropriate, policy and
guidance in the development of business continuity planning.
a) RISK MANAGEMENT
Project manager will:
8. COMMUNICATIONS
Communications are key within Atlancis’s business environment. A three-prong
approach will be utilized:
Main Contact:
Mobile Number
Vendor Name:
Phone:
Email address:
Mobile Number:
Objectives
Facilitate the rapid resolution of Client problems through a single
point of contact;
Maintain a historical log of the support provided to each Client;
Identify user sites that are experiencing difficulty with a particular
application;
Track the type of problems encountered for each application;
Uncover recurring problems and assist in planning a corrective course
of action;
Generate statistics, such as the number and type of calls by
application.
Hours of Operation
HELPDESK hours of operation are 0800 to 1730 East African time, Monday to
Friday excluding all Statutory Holidays
Page 11 of 17
NB: The update to the Client is a means to communicate to the Client about
actions and progress towards finding a solution to the problem. Some problems
may take longer to diagnose and resolve.
HELPDESK Contact
Clients can submit HELPDESK queries by:
Resolution of Disputes
Page 12 of 17
11. DISASTER AND EMERGENCY PREPARATION
All employees will review disaster preparation and emergency action plan
procedures with their Department Heads.
New employees will be introduced to our emergency action plans via employee
orientation.
Mock disaster training will be conducted annually and will involve local
police and fire authorities.
Page 13 of 17
Page 14 of 17
12. DISASTER PROCEDURES CHECKLIST
Action By whom Comments Check
when done
Receive Communication on
1. emergency Bus Cont log time
Leader
Planning Team
Leader
Employees
Page 15 of 17
>24 hours, <48
hours
>48 hours
Unknown
Planning Team
Planning Team
identified in Emergency
Notification List LEADER
10
. Activate Command Center Business Log time
Contingency
Planning Team
11
. Report to Command Center Business Log time
Page 16 of 17
Contingency
Planning Team
Page 17 of 17