Daily Load Curve (dalam Mega Watt)

Jam 0 1 2 3
Beban (mW) 0 13.6 15.5 14.2

He = 22.5 m
Effi = 0.78

Daily Load Curve (Dalam m3/dt) :


Jam 0 1 2 3
Qload (m3/dt) 0.000 78.994 90.030 82.479
Q dasar(m3/dt) = 78.413
Q rata2(m3/dt) = 223.017 223.017 223.017 223.017
Q puncak(m3/dt) = 394.969

Volume KTH (Di suplai dengan Qrata2)


Qbeban = Qdemand
Qsupplay=Qrata2 dari demand
Jam 0 1 2 3
Qd (m /dt)
3
0.000 78.994 90.030 82.479
Qsuplay (m3/dt) 0.000 223.017 223.017 223.017
Kelebihan (m3/dt) 0.000 144.023 132.987 140.538
Vol. Lebih (m3) 0.000 518,483.67 478,754.45 505,937.60
Kekurangan (m3/dt) 0.000 0.000 0.000 0.000
Vol. Kurang (m3) 0.000 - - -
Vol. KTH (m3) 3,662,580.48

450.00
400.00
350.00
Beban (m3/dt)

300.00
250.00
200.00
450.00
400.00
350.00

Debit Beban (m3/dt)


300.00
250.00
200.00
150.00
100.00
50.00
0.00
1 2 3 4 5 6 7 8
4 5 6 7 8 9
13.5 17 18 33.5 47 48

4 5 6 7 8 9
78.413 98.742 104.551 194.580 272.993 278.802

223.017 223.017 223.017 223.017 223.017 223.017

4 5 6 7 8 9
78.413 98.742 104.551 194.580 272.993 278.802
223.017 223.017 223.017 223.017 223.017 223.017
144.604 124.275 118.466 28.437 0.000 0.000
520,574.68 447,389.29 426,479.17 102,372.43 - -
0.000 0.000 0.000 0.000 49.976 55.785
- - - - 179,914.09 200,824.21

Daily Load Curve (m3/dt)


5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
10 11 12 13 14 15 16
51.7 46 42 44.2 49.5 50.3 53.6

10 11 12 13 14 15 16
300.292 267.185 243.951 256.730 287.514 292.161 311.328

223.017 223.017 223.017 223.017 223.017 223.017 223.017

10 11 12 13 14 15 16
300.292 267.185 243.951 256.730 287.514 292.161 311.328
223.017 223.017 223.017 223.017 223.017 223.017 223.017
0.000 0.000 0.000 0.000 0.000 0.000 0.000
- - - - - - -
77.275 44.168 20.934 33.713 64.497 69.144 88.311
278,191.62 159,003.98 75,363.53 121,365.78 232,189.38 248,917.47 317,920.84
19 20 21 22 23 24 25
17 18 19 20 21 22 23
61 68 59.1 52.1 40.2 35 27.5

17 18 19 20 21 22 23
354.310 394.969 343.274 302.616 233.496 203.293 159.730

223.017 223.017 223.017 223.017 223.017 223.017 223.017

17 18 19 20 21 22 23
354.310 394.969 343.274 302.616 233.496 203.293 159.730
223.017 223.017 223.017 223.017 223.017 223.017 223.017
0.000 0.000 0.000 0.000 0.000 19.724 63.287
- - - - - 71,007.26 227,833.10
131.293 171.952 120.257 79.599 10.479 0.000 0.000
472,655.67 619,026.46 432,926.46 286,555.67 37,725.33 - -
24
21

24
121.976

223.017

24 25 Jumlah
121.976 121.976 5352.408
223.017 223.017 5352.408
101.041 101.041
363,748.83 3,662,580.48
0.000 0.000
- 3,662,580.48
Daily Load Curve (dalam Mega Watt)
Jam 0 2 4 6
Beban (mW) 20 15 11 18

He = 22.5 m
Effi = 0.78

Daily Load Curve (Dalam m3/dt) :


Jam 0 2 4 6
Qload (m3/dt) 116.167 87.125 63.892 104.551
Q dasar(m3/dt) = 63.892
Q rata2(m3/dt) = 219.377
Q puncak(m3/dt) = 435.627

Dail
500.00
450.00
Debit Beban (m3/dt)

400.00
350.00
300.00
250.00
200.00
150.00
100.00
50.00
0.00
1 2 3 4 5 6

Volume KTH (Di suplai dengan Qrata2)


Qbeban = Qdemand
Qsupplay=Qrata2 dari demand
Jam 0 2 4 6
Qd (m /dt)
3
116.167 87.125 63.892 104.551
Qsuplay (m /dt)
3
219.377 219.377 219.377 219.377
Kelebihan (m /dt)
3
103.210 132.252 155.485 114.827
Vol. Lebih (m3) 847,663.80 1,035,854.81 973,124.47 413,376.84
Kekurangan (m3/dt) 0.000 0.000 0.000 0.000
Vol. Kurang (m3) - - - 193,016.42
Vol. KTH (m3) 4,500,499.63
8 10 12 14 16 18
47 52 42 49 53 75

8 10 12 14 16 18
272.993 302.035 243.951 284.610 307.843 435.627

Daily Load Curve (m3/dt)

5 6 7 8 9 10 11 12

8 10 12 14 16 18
272.993 302.035 243.951 284.610 307.843 435.627
219.377 219.377 219.377 219.377 219.377 219.377
0.000 0.000 0.000 0.000 0.000 0.000
- - - - - -
53.616 82.657 24.574 65.232 88.466 216.250
490,583.41 386,032.85 323,302.51 553,313.75 1,096,976.68 1,117,886.79
20 22 24
54 35 20

20 22 24
313.652 203.293 116.167

11 12 13

20 22 24 26 Jumlah
313.652 203.293 116.167 116.167
219.377 219.377 219.377 219.377
0.000 16.085 103.210 103.210
57,904.93 429,461.54 743,113.23 4,500,499.63
94.274 0.000 0.000 0.000
339,387.21 - - 4,500,499.63
RENCANA GENANGAN LUAS
AREA VOLUME (juta m3)
(Garis Kontour) Genangan
NO.
titik ke (m) km2 per segmen
1 0 116 0.01 0
2 1 117 1.37 0.69
3 2 118 1.9 1.63
4 3 119 5.07 3.48
5 4 120 7.43 6.25
6 5 121 10.89 9.16
7 6 122 16.28 13.58
8 7 123 25.37 20.82
9 8 124 34.9 30.14
10 9 125 44.6 39.75
11 10 126 54.9 49.75
12 11 127 75.66 65.28
13 12 128 93.63 84.65
14 13 129 111.59 102.61
15 14 130 131.03 121.31
16 15 131 149.48 140.25
17 16 132 170.67 160.07
18 17 133 184.42 177.54
19 18 134 204.71 194.56
20 19 135 225.69 215.2

1 hp = 736 Watt
Output Daya P = 8620 HP = 6344.32
Heff = 24 m
Effisiensi = 80 %
Qdemand (m3/dt) = 33.683 m3/dt
Vol. Demand (juta m3) 87.307 juta m3
Satuan : Volume dalam Juta m3
Bulan Vol. Inflow Vol. Demand Defisit
Januari 38,000 400,000 362,000
Pebruari 25,000 400,000 375,000
Maret 17,000 400,000 383,000
April 11,000 400,000 389,000
Mei 3,000 400,000 397,000
Juni 86,000 400,000 314,000
Juli 1,704,000 400,000 0
Agustus 2,836,000 400,000 0
September 1,695,000 400,000 0
Oktober 437,000 400,000 0
Nopember 121,000 400,000 279,000
Desember 64,000 400,000 336,000
Jumlah 2,835,000
Volume Waduk yang Diperlukan = 2,835,000 m3
7037000.000 4800000.000 2237000.000
Demand = 400000 m3
Kumulatif
Bulan Vol. Inflow Vol. Demand Vol. Inflow
Mei 38,000 400,000 38,000
Juni 25,000 400,000 63,000
Juli 17,000 400,000 80,000
Agustus 11,000 400,000 91,000
September 3,000 400,000 94,000
Oktober 86,000 400,000 180,000
Nopember 1,704,000 400,000 1,884,000
Desember 2,836,000 400,000 4,720,000
Januari 1,695,000 400,000 6,415,000
Februari 437,000 400,000 6,852,000
Maret 121,000 400,000 6,973,000
April 64,000 400,000 7,037,000

Volume Waduk yang Diperlukan = 2,220,000 m3

Demand Max

Kumulatif
Bulan Vol. Inflow Vol. Demand Vol. Inflow
Januari 38,000 586,417 38,000
Pebruari 25,000 586,417 63,000
Maret 17,000 586,417 80,000
April 11,000 586,417 91,000
Mei 3,000 586,417 94,000
Juni 86,000 586,417 180,000
Juli 1,704,000 586,417 1,884,000
Agustus 2,836,000 586,417 4,720,000
September 1,695,000 586,417 6,415,000
Oktober 437,000 586,417 6,852,000
Nopember 121,000 586,417 6,973,000
Desember 64,000 586,417 7,037,000
586,417
Volume Waduk yang Diperlukan = 3,338,502 m3

Maksimal : Total Volume Kebutuhan = Total Volume Inflow


Demad Kapasitas
400,000 2,220,000
500,000 2,820,000
600,000 3,420,000
Kebutuhan Maksimal = Rata Rata Inflow = 586,417 m3
VOLUME (juta m3)

kumulatif
0 225.69
0.69 204.71
2.33 184.42 Volume (jut
5.81 170.67 140
12.06 149.48 135
21.22 131.03
130
34.8 111.59
125
55.63 93.63
120
85.76 75.66
115
125.52 54.9
110
175.27 44.6
105
240.55 34.9 0 200 400 600 800 1000 120
325.2 25.37
427.81 16.28
549.12 10.89
689.38 7.43
849.45 5.07
1,026.99 1.9
1,221.55 1.37
1,436.76 0.01

Kilo Wat

9,000,000
Kurva Surplus-Defisit

6,000,000
3)
9,000,000
Surplus Kurva Surplus-Defisit
0
0
6,000,000
0

Volume (Juta m3)


0
0
0 3,000,000
1,304,000
2,436,000
1,295,000 0
37,000 ri ar
i et il ei ni li s
be
r
a ar Ap
r M Ju Ju stu
0 nu ru M u m to
Ja Pe
b Ag pte Ok
0 Vol. Inflow Se
5,072,000 Vol. Demand

2237000

Kumulatif Defisit
Vol. Demand (G) - (F) Kurva Massa
400,000 362,000 8,000,000.0
800,000 737,000 Kum. Vol. Inflow
1,200,000 1,120,000
6,000,000.0 Kum. Vol. Demand
1,600,000 1,509,000
Volume (Juta m3)

2,000,000 1,906,000
2,400,000 2,220,000 4,000,000.0
2,800,000 916,000
3,200,000 -1,520,000 2,000,000.0
3,600,000 -2,815,000
6,852,000 0 0.0
7,252,000 279,000 ri ri et ri l ei ni li s
be
r
be
r
be
r
ua r ua ar Ap M Ju Ju
u stu m to m
n M
7,652,000 615,000 Ja Pe
b Ag pte Ok pe
Se No D

Kumulatif
Vol. Demand (G) - (F)
586,417
1,172,834 1,109,834
1,759,251 1,679,251
2,345,668 2,254,668
2,932,085 2,838,085 Kurva Massa
3,518,502 3,338,502
12,000,000.0
4,104,919 2,220,919
4,691,336 -28,664 Kum. Vol. Inflow
5,277,753 -1,137,247 Kum. Vol. Demand
6,852,000 0 8,000,000.0
7,438,417 465,417

Volume (Juta m3)


8,024,834 987,834
4,000,000.0

ume Inflow 0.0


ri ri et il ei ni li s
be
r
be
r
ua r ua ar Ap
r M Ju Ju
ustu m to
n M
Ja Pe
b Ag pte Ok p
Se No
Volume (juta m3)

Volume (juta m3)

600 800 1000 1200 1400 1600

t
t

li s r r r r
Ju stu be o be be be
u m kt m m
Ag pte O pe se
Se No De

38,000
25,000
17,000
11,000
3,000
86,000
1,704,000
2,836,000
1,695,000
437,000
121,000
s r r r r 64,000
stu be o be be be
u m t m m
g pte Ok pe se
Se No De
li s r r r r
Ju stu be o be be be
u m t m m
Ag pte Ok pe se
Se No De
RENCANA GENANGAN LUAS
AREA VOLUME (juta m3)
(Garis Kontour) Genangan
NO.
titik ke (m) km2 per segmen
1 0 116 0.01 0
2 1 117 1.37 0.69
3 2 118 1.9 1.63
4 3 119 5.07 3.48
5 4 120 7.43 6.25
6 5 121 10.89 9.16
7 6 122 16.28 13.58
8 7 123 25.37 20.82
9 8 124 34.9 30.14
10 9 125 44.6 39.75
11 10 126 54.9 49.75
12 11 127 75.66 65.28
13 12 128 93.63 84.65
14 13 129 111.59 102.61
15 14 130 131.03 121.31
16 15 131 149.48 140.25
17 16 132 170.67 160.07
18 17 133 184.42 177.54
19 18 134 204.71 194.56
20 19 135 225.69 215.2

1 hp = 736 Watt
Output Daya P = 8620 HP = 6344.32
Heff = 24 m
Effisiensi = 80 %
Qdemand (m3/dt) = 33.683 m3/dt
Vol. Demand (juta m3) 87.307 juta m3
Satuan : Volume dalam Juta m3
Bulan Vol. Inflow Vol. Demand Defisit
Januari 95.200 87.307 0.000
Pebruari 100.800 87.307 0.000
Maret 84.000 87.307 3.307
April 75.600 87.307 11.707
Mei 67.200 87.307 20.107
Juni 81.200 87.307 6.107
Juli 82.500 87.307 4.807
Agustus 84.000 87.307 3.307
September 86.800 87.307 0.507
Oktober 92.400 87.307 0.000
Nopember 98.400 87.307 0.000
Desember 89.600 87.307 0.000
Jumlah 49.849
Volume Waduk yang Diperlukan = 49.849 Juta m3
1037.700 1047.684 -9.984

Kumulatif
Bulan Vol. Inflow Vol. Demand Vol. Inflow
Januari 95.200 87.307 95.200
Pebruari 100.800 87.307 196.000
Maret 84.000 87.307 280.000
April 75.600 87.307 355.600
Mei 67.200 87.307 422.800
Juni 81.200 87.307 504.000
Juli 82.500 87.307 586.500
Agustus 84.000 87.307 670.500
September 86.800 87.307 757.300
Oktober 92.400 87.307 849.700
Nopember 98.400 87.307 948.100
Desember 89.600 87.307 1,037.700

1 Dari Kurva Surplus-Defisit diketahui bahwa Kekurangan air pada bulan bulan :
Maret - September
2 Untuk Kurva Masa nya perlu di koreksi dengan : satu periode sebelum defisit Volume Kumulatif Kebutuha
yaitu cell : G56=F56
3 Hitung Selisih dari Volume Kumulatif Kebutuhan - Volume Kumulatif Inflow saat terjadi Defisit.
4 Volume Waduk yang diperlukan = Hasil dari poitn (3) yang terbesar
Yaitu terjadi pada bulan Juni sebesar 49,849 Juta m3.
OLUME (juta m3)

kumulatif
0 225.69
0.69 204.71
2.33 184.42 Volume (juta m
5.81 170.67 140
12.06 149.48 135
21.22 131.03
130
34.8 111.59
125
55.63 93.63
120
85.76 75.66
115
125.52 54.9
110
175.27 44.6
105
240.55 34.9 0 200 400 600 800 1000 1200
325.2 25.37
427.81 16.28
549.12 10.89
689.38 7.43
849.45 5.07
1,026.99 1.9
1,221.55 1.37
1,436.76 0.01

Kilo Wat
Surplus
7.893 Kurva Surplus-Defisit
105.000
13.493
0.000 100.000
0.000 95.000
0.000 Volume (Juta m3) 90.000
0.000
85.000
0.000
80.000
0.000
Vol. Inflow
0.000 75.000
Vol. Demand
5.093 70.000
11.093 65.000
2.293 i i et il ei ni li s r r r r
ar ar ar r Ju Ju stu be be be be
nu r u M Ap M u m to m m
39.865 Ja Pe
b Ag pte Ok pe se
Se No De

-9.984

Kumulatif
Vol. Demand (G) - (F) Kurva Massa
87.307 1,265.0
196.000 0.000 Kum. Vol. Inflow
283.307 3.307 1,065.0 Kum. Vol.
370.614 15.014 Demand
865.0
Volume (Juta m3)

457.921 35.121
545.228 41.228 665.0
632.535 46.035 465.0
719.842 49.342
49.849 265.0
807.149
894.456 44.756 65.0
i i ret il ei ni li s r r r r
981.763 33.663 ar ar a r Ju Ju tu be obe be be
nu
br
u M Ap M us m t m m
1,069.070 31.370 Ja Pe Ag epte Ok ope se
S N De

m defisit Volume Kumulatif Kebutuhan disamakan dengan Volume Kumulatif Inflow

Inflow saat terjadi Defisit.


Volume (juta m3)

Volume (juta m3)

600 800 1000 1200 1400 1600


38,000
25,000
17,000
11,000
3,000
86,000
1,704,000
2,836,000
1,695,000
437,000
121,000
r r r r 64,000
be obe be be
m t m m
Ok ope se
N De
VOLUME WADUK YANG DIPERLUKAN DENGAN CARA RIPPL (CRITICAL MASS CURVE)

Kum. Kum. Delta : Q


Vol. Volume Vol. Volume inflow - Q
Inflow Inflow Inflow Demand Demand Demand Demand
(m3/s) (Juta m3) (Juta m3) (m3/s) (Juta m3) (Juta m3) (m3/s)
1 30.00 80.35 80.35 7.60 20.36 20.36 22.40
2 25.00 60.48 140.83 7.60 18.39 38.74 17.40
3 32.00 85.71 226.54 7.60 20.36 59.10 24.40
4 22.00 57.02 283.56 7.60 19.70 78.80 14.40
5 17.00 45.53 329.10 8.50 22.77 101.56 8.50
6 15.00 38.88 367.98 8.50 22.03 367.98 6.50
7 5.00 13.39 381.37 8.50 22.77 390.74 -3.50
8 4.00 10.71 392.08 8.50 22.77 413.51 -4.50
9 3.00 7.78 399.86 6.25 16.20 429.71 -3.25
10 10.00 26.78 426.64 6.25 16.74 446.45 3.75
11 15.00 38.88 465.52 6.25 16.20 462.65 8.75
12 20.00 53.57 519.09 6.25 16.74 479.39 13.75
13 30.00 80.35 599.44 7.60 20.36 499.75 22.40
14 32.00 77.41 676.86 7.60 18.39 518.13 24.40
15 25.00 66.96 743.82 7.60 20.36 538.49 17.40
16 20.00 51.84 795.66 7.60 19.70 558.19 12.40
17 15.00 40.18 835.83 8.50 22.77 835.83 6.50
18 8.00 20.74 856.57 8.50 22.03 857.87 -0.50
19 4.00 10.71 867.28 8.50 22.77 880.63 -4.50
20 3.00 8.04 875.32 8.50 22.77 903.40 -5.50
21 2.00 5.18 880.50 6.25 16.20 919.60 -4.25
22 12.00 32.14 912.64 6.25 16.74 936.34 5.75
23 20.00 51.84 964.48 6.25 16.20 952.54 13.75
24 30.00 80.35 1,044.84 6.25 16.74 969.28 23.75
Kapasitas Embung yang Di
Volume Embung Efektip ya

Asumsi :
kehilangan air belum diperhitungkan
demand konstant
LANGKAH LANGKAH :
1 Debit Inflow diubah dari satuan m3/dt menjadi volume dalam m3
2 dihitung Volume Kumulatif Inflow
3 Debit Kebutuhan (Demand) diubah dari satuan m3/dt menjadi volume dalam m3
4 dihitung Volume Kumulatif Kebutuhan
5 dibuat grafik Kurva Massa yaitu grafik Volume Kumulatif Inflow dan Volume Kumulatif Kebutuh
6 Lakukan Koreksi pada Kurva Massa menjadi Kurva Massa Terkoreksi dengan jalan :
7 Satu periode sebelum terjadinya Defisit (Kekurangan air), Volume Kumulatif Kebutuhan di SAM
8 Langkah (7) ini dilakukan pada setiap awal musim kemarau (defisit)
9 Dari Kurva Massa Terkoreksi, maka dapat dihitung Selisih antara Volume Kumulatif Kebutuhan -
10 Volume Waduk yang diperlukan = Selisih terbesar
CAL MASS CURVE)

Selisih
Kebutuhan -
Ketersediaan

Perhitungan Volume W
dengan Cara Rippl (
1,100.00

pada 1 periode sebelum kurang air (Kemarau), 1,000.00


Kumulatif Demand = kumulatip volume inflow
9.37 900.00
Periode
21.43 Kemarau I

Volume Infow atau Kebutuhan (Juta m3)


800.00
29.85
700.00

600.00

500.00

400.00

pada 1 periode sebelum kurang air (Kemarau), 300.00


Kumulatif Demand = kumulatip volume inflow
13.35 200.00
Periode
28.08 Kemarau II
39.10 100.00

-
0 1 2 3 4 5 6 7 8 9 10 11 12 13 1

Waktu (bulan ke)


39.10 Juta m3
39.10 Juta m3

belum diperhitungkan

enjadi volume dalam m3

Inflow dan Volume Kumulatif Kebutuhan


a Terkoreksi dengan jalan :
, Volume Kumulatif Kebutuhan di SAMAKAN dengan Volume Kumulatif Inflow

h antara Volume Kumulatif Kebutuhan - Volume Kumulatif Infow (Pada Periode Kemarau)
erhitungan Volume Waduk yang Diperlukan
dengan Cara Rippl (Critical Mass Curve)

Kum Vol. Inflow


Kum Vol. Demand

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Waktu (bulan ke)