You are on page 1of 3

Investment

 for  
50  MW  Solar  Park
Project  Profile:   BPV  Renewable  Energy   &  YesSv  Infra   JV

Power  Purchaser   (PPA) NLC  India  Limited.


Neyveli  Lignite  Corporation   (NLC)
(a   Navaratna Government   of  India  Company)

Purchase  Rate: Rs.  3.40  Ps.  /  Per  Unit

Period  of  PPA 25  years

Project  Size: 50  MW  

Project  Location:   Tamilanadu

Cost  of  Project: 210  Cr  


20%  Equity   (42  Cr)
80%  Loan  from  PFC  (168  Cr)

Technology: German   Technology   (EU  made)

PV  Modules  &  Allied  Materials: BPV  Renewable  Energy   Pvt.   Ltd.  ,  YESSV   Energy/Infra   Pvt Ltd

Design,  Erection   &  Commissioning: BPV/YesSv   Infra

Funds  Requirement: 40  Cr

Period: 1  yr.  (max)

Repayment: 75%  after   Loan  Sanction   From   PFC  (appx   32  Cr  of  42  Cr)
25%  (10  Cr  with  in  12  months)

When  it  Required: During   Loan  Sanction   process  from   PFC

What   form   it  required: as  Equity   to  Show   in  Books  of  Account

Offer: 70%  Equity   in  this  SPV  

Enclosure: Income  &  Expenditure  Workings