Professional Documents
Culture Documents
et
K lb NF Fe
10-20 -14U
OP-3 ll with 1”
c e
load
ition
x pos
on Bo
Juncti
et
K lb NF Fe
10-20 -14U
OP-3 ll with 1”
a d ce
lo
t
nec
con
able
al c r
sing dicato
to in
OP-900B-12-2PT Indicator
NF F eet
K lb
10-20 -14U
OP-3 ll with 1”
c e
load
OP-900B-12-2PT
Indicator
Operation
Manual
Expansion Bolts
Installation Plate for Ramp
M10x100mm
Eyebolts
Scale Components
platform (total: 2pcs) ramp A (total: 4pcs) load cell (total: 8pcs)
feet (total: 8pcs) indicator (total: 1pcs) junction box (total: 2pcs)
Bolts details
bolt for load cell expansion bolt Limit bolt bolt for bending plate M16 eyebolt
M24 x 75 mm (total: 16 pcs) M16 x 100 mm M20 x 70 mm (total: 16 pcs) (total: 2 pcs)
(total: 28 pcs) (total: 8 pcs)
1
Tools Required for Installation
2
(1) Make sure the complete installation is done on a level ground .
(2) Bolt the installation plate to the ramps and place the
ramps 87" apart in parallel with forklift . Installation Plate
forklift
wrench
tape
1’’-14UNF Feet
flat screwdriver
3
(5) Pull out the interface cable
Hole for cable though
Open the cover on the side and you ad ce
ll
for lo
will find the junction box with a 50ft cable
OP-900B-12-2PT Indicator
hammer
expansion bolt
thread x length :
(8) For permanent use, install anchoring M10x100mm bolts
churn drill
bolts to the ramps .