Installation Instruction for Axle Scales

et
K lb NF Fe
10-20 -14U
OP-3 ll with 1”
c e
load

ition
x pos
on Bo
Juncti

et
K lb NF Fe
10-20 -14U
OP-3 ll with 1”
a d ce
lo

t
nec
con
able
al c r
sing dicato
to in

OP-900B-12-2PT Indicator
NF F eet
K lb
10-20 -14U
OP-3 ll with 1”
c e
load

OP-900B-12-2PT
Indicator
Operation
Manual
Expansion Bolts
Installation Plate for Ramp
M10x100mm
Eyebolts
Scale Components

platform (total: 2pcs) ramp A (total: 4pcs) load cell (total: 8pcs)

feet (total: 8pcs) indicator (total: 1pcs) junction box (total: 2pcs)

Singal cable for indicator bending plate (total: 2pcs)


(total: 2pcs)

Bolts details

bolt for load cell expansion bolt Limit bolt bolt for bending plate M16 eyebolt
M24 x 75 mm (total: 16 pcs) M16 x 100 mm M20 x 70 mm (total: 16 pcs) (total: 2 pcs)
(total: 28 pcs) (total: 8 pcs)

1
Tools Required for Installation

folklift tape churn drill

wrench flat screwdriver hammer

2
(1) Make sure the complete installation is done on a level ground .

(2) Bolt the installation plate to the ramps and place the
ramps 87" apart in parallel with forklift . Installation Plate
forklift

wrench

tape

(3) Bolt the installation plates to the platform and


screw the four threaded level feet into the four Installation Plate
corners of the platform while lifting it with the
forklift .

1’’-14UNF Feet

(4) Place the platform between the two ramps,


making sure all the feet sit inside the rings
on the ramps .

flat screwdriver

If necessary, adjust the height


with a screwdriver from the top.

3
(5) Pull out the interface cable
Hole for cable though
Open the cover on the side and you ad ce
ll
for lo
will find the junction box with a 50ft cable

long cable nested inside. Run the


cable (with connector) through hole oad
cell
f or l cell
on the bottom and pull it out from cab
l e
f o r lo
ad
le cable for connect
cab
underneath as long as you need . to indicator

Close the cover with the original


screws after this is finished .

(6) Follow the same steps to install


the other set .

(7) Plug the connectors on the interface


cables to the 2 ports of the indicator .
tor
dica
to in
ect
conn
able
al c
sing

OP-900B-12-2PT Indicator

hammer

expansion bolt
thread x length :
(8) For permanent use, install anchoring M10x100mm bolts
churn drill
bolts to the ramps .