You are on page 1of 111

TAQA POWER

TECHNICAL
SPECIFICATIONS
Revision No. 1

June 2013

Prepared By: TAQA Power Technical Office Department

57, Cornish El Nile, Maadi, ،‫ المعـادي‬،‫ كورنيـش النيل‬75


Cairo, Egypt. .‫ مصر‬،‫القاهرة‬
Tel.: (202) 2526 0900 )929( 97902222 :‫تليفون‬
Fax: (202) 2526 0911 www.taqa.com.eg )929( 97902222 : ‫فاكس‬
TAQA Power Technical Specifications

Table of Contents
A. Transformers of Capacity: 500 KVA ............................................................................................ A-9
1. Feeding System ....................................................................................................................... A-9
General Description: ................................................................................................................... A-9
Single Line Diagram: .................................................................................................................... A-9
Metering: .................................................................................................................................... A-9
2. Medium Voltage Equipments: .............................................................................................. A-10
Transformers: ............................................................................................................................ A-10
Approved Manufacturers.......................................................................................................... A-11
3. Ring Main Units: .................................................................................................................... A-11
General Specifications: ............................................................................................................. A-11
Incoming Cells: .......................................................................................................................... A-11
Outgoing Cell ............................................................................................................................. A-12
Approved Manufacturers.......................................................................................................... A-12
4. Low Voltage Equipments ...................................................................................................... A-12
5. Earthing system..................................................................................................................... A-12
6. Electrical Room Details ......................................................................................................... A-13
Room dimensions , structure and location: .............................................................................. A-13
MV and LV cables requirements: .............................................................................................. A-13
Approved Manufactures: .......................................................................................................... A-13
Room Finishing: ......................................................................................................................... A-13
7. Fire Fighting System: ............................................................................................................. A-14
RMU: ......................................................................................................................................... A-14
Transformer: ............................................................................................................................. A-14
LV Panel:.................................................................................................................................... A-14
8. General Requirements: ......................................................................................................... A-14
B. Transformers of Capacity: 500-1500 KVA ....................................................................................... 0
9. Feeding System: .......................................................................................................................... 0
General Description: ....................................................................................................................... 0
Single Line Diagram: ........................................................................................................................ 0
Metering: ........................................................................................................................................ 0
10. Medium Voltage Equipments: ................................................................................................ 1
Transformers: .................................................................................................................................. 1
TAQA Power Technical Specifications

11. Ring Main Units: ...................................................................................................................... 2


General Specifications: ................................................................................................................... 2
Incoming Cells: ................................................................................................................................ 2
Measuring Cells: .............................................................................................................................. 2
Outgoing Cell ................................................................................................................................... 3
Approved Manufacturers................................................................................................................ 3
12. Low Voltage Equipments ........................................................................................................ 3
Approved Manufacturers................................................................................................................ 3
13. Earthing system....................................................................................................................... 4
14. Electrical Room Details ........................................................................................................... 4
Room dimensions , structure and location: .................................................................................... 4
MV and LV cables requirements: .................................................................................................... 4
Approved Manufactures: ................................................................................................................ 4
Room Finishing: ............................................................................................................................... 4
15. Fire Fighting System: ............................................................................................................... 5
RMU: ............................................................................................................................................... 5
Transformer: ................................................................................................................................... 5
LV Panel:.......................................................................................................................................... 5
16. General Requirements: ........................................................................................................... 5
C. Transformers of Capacity: 1500-2500 KVA ..................................................................................C-1
17. Feeding System: ...................................................................................................................C-1
General Description: ....................................................................................................................C-1
Single Line Diagram: .....................................................................................................................C-1
General Description: ....................................................................................................................C-2
SLD: ..............................................................................................................................................C-2
Metering: .....................................................................................................................................C-2
18. Medium Voltage Equipments: .............................................................................................C-3
Transformers: ...............................................................................................................................C-3
Approved Manufacturers.............................................................................................................C-4
19. Ring Main Units: ...................................................................................................................C-4
General Specifications: ................................................................................................................C-4
Measuring Cells: ...........................................................................................................................C-4
Outgoing Cell ................................................................................................................................C-5
Approved Manufacturers.............................................................................................................C-5
TAQA Power Technical Specifications

20. Low Voltage Equipments .....................................................................................................C-5


Approved Manufacturers.............................................................................................................C-5
21. Earthing system....................................................................................................................C-6
22. Electrical Room Details ........................................................................................................C-6
MV and LV cables requirements: .................................................................................................C-6
Approved Manufactures: .............................................................................................................C-6
Room Finishing: ............................................................................................................................C-6
23. Fire Fighting System: ............................................................................................................C-7
RMU: ............................................................................................................................................C-7
Transformer: ................................................................................................................................C-7
LV Panel:.......................................................................................................................................C-7
24. General Requirements: ........................................................................................................C-7
D. Demanded Load: 4-6 MVA .............................................................................................................. 0
25. Feeding System: ...................................................................................................................... 0
General Description: ....................................................................................................................... 0
Single Line Diagram: ........................................................................................................................ 0
Metering: ........................................................................................................................................ 0
General Description: ....................................................................................................................... 1
SLD: ................................................................................................................................................. 1
Metering: ........................................................................................................................................ 1
26. Medium Voltage Equipments: ................................................................................................ 2
Transformers: .................................................................................................................................. 2
Approved Manufacturers................................................................................................................ 3
27. Ring Main Units: ...................................................................................................................... 3
General Specifications: ................................................................................................................... 3
Incoming Cells: ................................................................................................................................ 3
Measuring Cells: .............................................................................................................................. 3
Outgoing Cell ................................................................................................................................... 4
Approved Manufacturers................................................................................................................ 4
28. Switch Gear: ............................................................................................................................ 4
General Specifications: ................................................................................................................... 4
Incoming Cells: ................................................................................................................................ 5
Outgoing Cells: ................................................................................................................................ 6
Bus Coupler Cell: ............................................................................................................................. 6
TAQA Power Technical Specifications

29. Low Voltage Equipments ........................................................................................................ 7


Approved Manufacturers................................................................................................................ 7
30. Earthing system....................................................................................................................... 7
31. Electrical Room Details ........................................................................................................... 8
Room dimensions, structure and location: ..................................................................................... 8
MV and LV cables requirements: .................................................................................................... 8
Approved Manufactures: ................................................................................................................ 8
Room Finishing: ............................................................................................................................... 8
32. Fire Fighting System: ............................................................................................................... 9
RMU: ............................................................................................................................................... 9
Transformer: ................................................................................................................................... 9
LV Panel:.......................................................................................................................................... 9
Switch Gear ..................................................................................................................................... 9
Distributor room: ............................................................................................................................ 9
33. General Requirements: ......................................................................................................... 10
E. Demanded Load: 6-8 MVA .............................................................................................................. 0
34. Feeding System: ...................................................................................................................... 0
General Description: ....................................................................................................................... 0
Single Line Diagram: ........................................................................................................................ 0
Metering: ........................................................................................................................................ 1
35. Medium Voltage Equipment: .................................................................................................. 1
Transformers: .................................................................................................................................. 1
Approved Manufacturers................................................................................................................ 2
36. Ring Main Units: ...................................................................................................................... 2
General Specifications: ................................................................................................................... 2
Incoming Cells: ................................................................................................................................ 2
Measuring Cells: .............................................................................................................................. 3
Outgoing Cell ................................................................................................................................... 3
Approved Manufacturers................................................................................................................ 3
37. Switch Gear: ............................................................................................................................ 3
General Specifications: ................................................................................................................... 3
Incoming Cells: ................................................................................................................................ 4
Outgoing Cells: ................................................................................................................................ 5
Bus Coupler Cell: ............................................................................................................................. 5
TAQA Power Technical Specifications

38. Low Voltage Equipments ........................................................................................................ 6


Approved Manufacturers................................................................................................................ 6
39. Earthing system....................................................................................................................... 6
40. Electrical Room Details ........................................................................................................... 7
Room dimensions , structure and location: .................................................................................... 7
MV and LV cables requirements: .................................................................................................... 7
Approved Manufactures: ................................................................................................................ 7
Room Finishing: ............................................................................................................................... 7
41. Fire Fighting System: ............................................................................................................... 8
RMU: ............................................................................................................................................... 8
Transformer: ................................................................................................................................... 8
LV Panel:.......................................................................................................................................... 8
Switch Gear ..................................................................................................................................... 8
Distributor room: ............................................................................................................................ 8
42. General Requirements: ........................................................................................................... 9
F. Demanded Load: 8-12 MVA ......................................................................................................... F-1
43. Feeding System: ................................................................................................................... F-1
General Description: .................................................................................................................... F-1
Single Line Diagram: ..................................................................................................................... F-1
Metering: ..................................................................................................................................... F-1
44. Medium Voltage Equipments: ............................................................................................. F-2
Transformers: ............................................................................................................................... F-2
Approved Manufacturers............................................................................................................. F-3
45. Ring Main Units: ................................................................................................................... F-3
General Specifications: ................................................................................................................ F-3
Incoming Cells: ............................................................................................................................. F-3
Measuring Cells: ........................................................................................................................... F-3
Outgoing Cell ................................................................................................................................ F-4
Approved Manufacturers............................................................................................................. F-4
46. Switch Gear: ......................................................................................................................... F-4
General Specifications: ................................................................................................................ F-4
Incoming Cells: ............................................................................................................................. F-5
Outgoing Cells: ............................................................................................................................. F-5
Bus Coupler Cell: .......................................................................................................................... F-6
TAQA Power Technical Specifications

47. Low Voltage Equipments ..................................................................................................... F-7


Approved Manufacturers............................................................................................................. F-7
48. Earthing system.................................................................................................................... F-7
49. Electrical Room Details ........................................................................................................ F-7
Room dimensions , structure and location: ................................................................................. F-7
MV and LV cables requirements: ................................................................................................. F-8
Approved Manufactures: ............................................................................................................. F-8
Room Finishing: ............................................................................................................................ F-8
50. Fire Fighting System: ............................................................................................................ F-9
RMU: ............................................................................................................................................ F-9
Transformer: ................................................................................................................................ F-9
LV Panel:....................................................................................................................................... F-9
Switch Gear .................................................................................................................................. F-9
Distributor room: ......................................................................................................................... F-9
51. General Requirements: ...................................................................................................... F-10
G. Demanded Load: 12-30 MVA ...................................................................................................... G-1
52. Feeding System: .................................................................................................................. G-1
General Description: ................................................................................................................... G-1
Single Line Diagram: .................................................................................................................... G-1
Metering: .................................................................................................................................... G-1
53. Medium Voltage Equipments: ............................................................................................ G-2
Transformers: .............................................................................................................................. G-2
Approved Manufacturers............................................................................................................ G-3
54. Ring Main Units: .................................................................................................................. G-3
General Specifications: ............................................................................................................... G-3
Incoming Cells: ............................................................................................................................ G-3
Measuring Cells: .......................................................................................................................... G-3
Outgoing Cell ............................................................................................................................... G-4
Approved Manufacturers............................................................................................................ G-4
55. Switch Gear: ........................................................................................................................ G-4
General Specifications: ............................................................................................................... G-4
Incoming Cells: ............................................................................................................................ G-5
Outgoing Cells: ............................................................................................................................ G-5
Bus Coupler Cell: ......................................................................................................................... G-6
TAQA Power Technical Specifications

56. Low Voltage Equipments .................................................................................................... G-7


Approved Manufacturers............................................................................................................ G-7
57. Earthing system................................................................................................................... G-7
58. Electrical Room Details ....................................................................................................... G-8
Room dimensions , structure and location: ................................................................................ G-8
MV and LV cables requirements: ................................................................................................ G-8
Approved Manufactures: ............................................................................................................ G-8
Room Finishing: ........................................................................................................................... G-8
59. Fire Fighting System: ........................................................................................................... G-9
RMU: ........................................................................................................................................... G-9
Transformer: ............................................................................................................................... G-9
LV Panel:...................................................................................................................................... G-9
Switch Gear ................................................................................................................................. G-9
Distributor room: ........................................................................................................................ G-9
60. General Requirements: ..................................................................................................... G-10
TAQA Power Technical Specifications

Section A

Transformers of
Capacity
500 KVA
TAQA Power Technical Specifications

A. Transformers of Capacity: 500 KVA

1. Feeding System

General Description:
Feeding will be through a RMU (3+1) feeding directly Dry/Oil distribution
transformers, RMU will be fed from the external MV loop.
Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.
- Important loads (i.e. Hospitals), feeding system will be through 2 different MV
feeding cables with a LV ATS panel board, also a backup generator will be
installed for all the emergency loads inside the facility.

Single Line Diagram:


To External
MV Loop

630 A 630 A 630 A


SF6 LBS SF6 LBS SF6 LBS

Spare

RMU
3 +1

630 A
SF6 LBS

HRF

Dry / Oil
Transfromer
22000 / 400
Dyn11

Metering:
KWH meter is to be installed on the LV side of the Transformer if maximum
demanded load is 500 KVA.

Transformers of Capacity 500 KVA A-9


TAQA Power Technical Specifications

2. Medium Voltage Equipments:

Transformers:

Oil immersed Type transformers:


- Maximum loading factor shouldn't exceed 80% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Technical specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method ONAN
Maximum temperature rise 45/55 K
Buchholz Relay Available
Mercury Thermometer Available
Bidirectional rollers Available
Earthing Terminal Available

Dry Type transformers:


- Maximum loading factor shouldn't exceed 95% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Transformers installed in a separate room will need no enclosure, in case of
installing both TR and RMU in same room the transformer should be equipped
with enclosure.
- Technical Specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method AN/AF
Insulation Class F/F
Maximum temperature rise 100/100 K
Climate/ Environment class/ Fire protection C2/ E2/ F1
Forced Cooling fans Available
Conductor Types AL or CU
Bidirectional rollers Available
Enclosure (TR not in A separate room) IP 23
Transformers of Capacity 500 KVA A-10
TAQA Power Technical Specifications

Earthing Terminal Available

Approved Manufacturers
 ABB / Schneider / El Sewedy / Eltas / Al Maco / EgyTrafo

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

3. Ring Main Units:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Type SF6
Bus bar rating 630 A
Rated short circuit current 20 KA/ 1 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz

Incoming Cells:

Number Of Cells 3
Type 630 A
SF6 LBS
Earthing Switch available
Number of ELI 2
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Transformers of Capacity 500 KVA A-11


TAQA Power Technical Specifications

Outgoing Cell

Outgoing Cell 630 A


Fused SF6 LBS
Fuse: x A
Earthing Switch Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Note: Fuse current mentioned as (x A) will be set according to each required load separately.

Approved Manufacturers
 ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

4. Low Voltage Equipments


- A main LVP should be installed equipped with
 Air CB with ratings = 1.25*Rated Transformer current at low voltage side.
 Current transformer with CT ratio (x/5) according to TR rating.
- A diesel generator with low voltage ATS (2 out of 1) operation may be installed for
emergency and important loads.
- ATS installed should be of switched non overlapping neutral type.
- Power factor correction panel is required to be installed for maintaining a 0.9 PF
(minimum) according to the load type.

Approved Manufacturers
ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

5. Earthing system
- A separate earthing system is required for both MV and LV equipments with
maximum earthing resistance 3 ohms.
- The approval for the proposed earthing system shall be approved after commissioning
where the measured resistance should achieve the desired values.
- Test link is required to be in an accessible place outside cable trenches.

Transformers of Capacity 500 KVA A-12


TAQA Power Technical Specifications

- Attached a drawing showing earthing network design require by Taqa Power


Company.

6. Electrical Room Details

Room dimensions , structure and location:


- A substation room is required to be built by the dimensions and structure shown in the
attached drawings for a TR and RMU in same room or separate rooms.
- The room doors should be on a main street with adequate space in front of it for
facilitating installation and removal of any of the equipments.
- For electrical substation rooms inside commercial buildings is required to be easily
accessible by a fork lift required for installing or removal of any equipments by during
operation for maintenance purposes.
- A ramp is required in front of the door if it's not at the same level of the road.

MV and LV cables requirements:


- Incoming / outgoing MV cables should be through a 8'' PVC (10 bar) pipes filled with
foam after cable installations leaving 25% spare pipes.
- Incoming / outgoing LV cables should be through a 6'' PVC (10 bar) pipes filled with
foam after cable installations leaving 25% spare pipes.
- MV cables from TR to RMU are required to be unarmored type.
- Transformer MV cables should rise on a steel ladder to avoid exerting any mechanical
stresses on the bushings.

Approved Manufactures:
El Sewedy, AL Alamaia, Al Masryia, Al Giza, Energya, BICC.

Room Finishing:

Roof:
- Proper water isolation membrane should be installed above the room roof with
suitable drainage pipes to avoid any water accumulation.
- Roof is to be covered with proper tiles.

Floor
- 20 cm of helicopter concrete.

Walls
- Waterborne paints are to be used for room walls.
- All wall holes should be filled with spray foam (PVC pipes, Cable entries, RMU
cable entries and SWG cable entries).
- Steel grill covered louver is required to be installed at all room sides.

Transformers of Capacity 500 KVA A-13


TAQA Power Technical Specifications

Electrical
- 220V, 16A output Sockets is required to be available in all the electrical rooms (2
sockets in each room).
- Exhaust fan is required to be installed in TR room for proper ventilation.
- A 24 hour timer or a thermostat is required for exhaust fan operation.
- Adequate emergency lamps equipped with batteries are to be installed in each
electrical room.
- Attached a drawing for power layout of electrical rooms.

Door
- The Door should have a louver for room ventilations covered with a steel grill.
- Door height is required to be not less than 3m
- Door should be aligned with the room floor.
- A door should have a steel locker.

7. Fire Fighting System:

RMU:
- Fire search system (CO2) – Capacity 6Kg. (1).
- Portable fire extinguisher, dry chemical power, capacity 12 Kg, Qty.(1)

Transformer:
- Ceiling mounted, self-actuated, stored pressure, dry chemical powder, multi-
purpose fire extinguisher – Capacity 12 Kg, Qty. (1).
- Portable fire extinguisher, dry chemical powder, capacity 12 Kg, Qty.(1)

LV Panel:
- Portable fire extinguisher, Dry Chemical Powder, capacity 12 Kg, Qty. (1)

8. General Requirements:
- All shop drawings for MV equipments is required to be approved before
manufacturing.
- All factory acceptance test (FAT) is required to be attended by one of our
representatives.
- Taqa company site representatives should be informed by the schedule of work for
their supervision.
- Equipments imported from other countries are required to be tested either in the
manufacturing country or in any other factories in Egypt if available.

Transformers of Capacity 500 KVA A-14


E E
2*(1*2)mm2 Cu/PVC

Shunt Trip
Coil

Space Heaters

TR fan Control
or
Buckolz Relay
DB

Exhaust
E Fan E

20.0000

20.0000

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500 KVA Dry/Oil Eng. Mohamed Hassan Adress:
Transfromer Power Layout Eng. Mohamed Khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 27/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-2D


5.0

3.0

0.8

0.6

0.2
8.0

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500 KVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Room Front View Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 12/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-2B


8.0

0.6

RMU Outgoing
3*240 mm2
AL/XLPE 18/36 KV

TR Measuring
Cell

LV Panel

Incoming2

5.0

LV cable Tray
Steel ladder Incoming1

4 x 8" PVC pipes


20 x 6" PVC pipes

2.5 2.5 To External Loop

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500 KVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Equipments Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Room Front View Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 12/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-2A


1

2 1

To Frame point

3
MV Cable Sheath

RMU Outgoing
Test link
To Frame point

3 3
Measuring
MV cable Sheath Cell

TR
Incoming2
To Frame point
LV Panel
Neutral Point

Incoming1

Project: Sheet Title: Designed By: Key: Owner:

Eng. Samy Abdel Malak 1- 95 mm2 Bar CopperTaqaPower Arabia


500 KVA Oil / Dry Eng. Mohamed Hassan Conductor Adress:
Transformer Earthing Layout Eng.Mohamed khaled 2- 95 mm2 CU/PVC 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation 3- 50 mm2 Cu/PVC Tel: +202-25260900

00
4- 10 mm2 Cu/PVC Fax: +202-25260911
Rev:
Date: 12/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-2C


E
DB

TR fan Control
or
E Buckolz Relay

Space Heaters

Shunt Trip
Coil

E
Exhaust
Fan

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500 KVA Dry/ Oil Eng. Mohamed Hassan Adress:
Transformers Power Layout Eng. Mohamed Khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 28/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-1D


6.5
0.9

3.0

5.0

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500 KVA Dry/ Oil Eng. Mohamed Hassan Adress:
Transformers Front View Eng. Mohamed Khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 28/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-1B


5.0

TR Steel ladder 3*240 mm2


0.5 AL/XLPE 18/36 KV

1.5

Steel Fence 1m heigh t 6.5


Outgoing
LV cable Tray

Incoming2

RMU Incoming1

1.2

0.6

2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500 KVA Dry/ Oil Eng. Mohamed Hassan Adress:
Transformers Equipments Layout Eng. Mohamed Khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 28/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-1A


TR

Outgoing

Incoming2

3
Incoming1

4
3

1
2

Project: Sheet Title: Designed By: Owner:


Key:
Eng. Samy Abdel Malak TaqaPower Arabia
500 KVA Dry/ Oil Eng. Mohamed Hassan
1- 95 mm2 Bar Copper
Adress:
Earthing Layout Conductor
Transformers Eng. Mohamed Khaled
2- 95 mm2 CU/PVC
57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation 3- 50 mm2 Cu/PVC


Tel: +202-25260900

Fax: +202-25260911
Rev: 00 4- 10 mm2 Cu/PVC
Date: 28/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-1C


TAQA Power Technical Specifications

Section B

Transformers of
Capacity
500-1500 KVA

Transformers of Capacity 500 KVA 0


TAQA Power Technical Specifications

B. Transformers of Capacity: 500-1500 KVA


9. Feeding System:

General Description:
Feeding will be through a RMU SF6 (3+M+1) feeding directly Dry/Oil distribution
transformers, RMU will be fed from the external MV loop.
Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.
- Important loads (i.e. Hospitals), feeding system will be through 2 different MV
feeding cables with a LV ATS panel board, also a backup generator will be
installed for all the emergency loads inside the facility.

Single Line Diagram:


To External
MV Loop

630 A 630 A 630 A


SF6 LBS SF6 LBS SF6 LBS

Spare

RMU
PT
3+M+1 22000/110
√3 √3

630 A
SF6 LBS

HRF

CT x/5

Dry / Oil
Transfromer
22000 / 400
Dyn11

Metering:
KWH meter is to be installed in the RMU measuring cell.

Transformers of Capacity 1500 - 2500 KVA 0


TAQA Power Technical Specifications

10. Medium Voltage Equipments:

Transformers:

Oil immersed Type transformers:


- Maximum loading factor shouldn't exceed 80% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Technical specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method ONAN
Maximum temperature rise 45/55 K
Buchholz Relay Available
Mercury Thermometer Available
Bidirectional rollers Available
Earthing Terminal Available

Dry Type transformers:


- Maximum loading factor shouldn't exceed 95% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Transformers installed in a separate room will need no enclosure, in case of
installing both TR and RMU in same room the transformer should be equipped
with enclosure.
- Technical Specifications:
-

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method AN/AF
Insulation Class F/F
Maximum temperature rise 100/100 K
Climate/ Environment class/ Fire protection C2/ E2/ F1
Conductor Types AL or CU
Bidirectional rollers Available
Enclosure (TR not in A separate room) IP 23
Transformers of Capacity 1500 - 2500 KVA 1
TAQA Power Technical Specifications

Earthing Terminal Available

Approved Manufacturers
 ABB / Schneider / El Sewedy / Eltas / Al Maco / EgyTrafo

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

11. Ring Main Units:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Type SF6
Bus bar rating 630 A
Rated short circuit current 20 KA/ 1 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz

Incoming Cells:

Number Of Cells 3
Type 630A
SF6 LBS
Earthing Switch available
Number of ELI 2
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Measuring Cells:

Transformers of Capacity 1500 - 2500 KVA 2


TAQA Power Technical Specifications

Voltmeters 0-24 KV
Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5, Ith= 20KA
CL: 0.5 Burden: 10 VA
3 Ammeters (0-x) A
Voltmeter Selector Switch Available

Outgoing Cell

Outgoing Cell 630 A


Fused SF6 LBS
Fuse: x A
Earthing Switch Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Note: All CT ratio mentioned above as (x/5) and Fuse current mentioned as (x A) will be set
according to each required load separately.

Approved Manufacturers
 ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

12. Low Voltage Equipments


- A main LVP should be installed equipped with
 Air CB with ratings = 1.25*Rated Transformer current at low voltage side.
 Current transformer with CT ratio (x/5) according to TR rating.
- A diesel generator with low voltage ATS (2 out of 1) operation may be installed for
emergency and important loads.
- ATS installed should be of switched non overlapping neutral type.
- Power factor correction panel is required to be installed for maintaining a 0.9 PF
(minimum) according to the load type.

Approved Manufacturers
ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

Transformers of Capacity 1500 - 2500 KVA 3


TAQA Power Technical Specifications

13. Earthing system


- A separate earthing system is required for both MV and LV equipments with
maximum earthing resistance 3 ohms.
- The approval for the proposed earthing system shall be approved after commissioning
where the measured resistance should achieve the desired values.
- Test link is required to be in an accessible place outside cable trenches.
- Attached a drawing showing earthing network design require by Taqa Power
Company.

14. Electrical Room Details

Room dimensions , structure and location:


- A substation room is required to be built by the dimensions and structure shown in the
attached drawings for a TR and RMU in same room or separate rooms.
- The room doors should be on a main street with adequate space in front of it for
facilitating installation and removal of any of the equipments.
- For electrical substation rooms inside commercial buildings is required to be easily
accessible by a fork lift required for installing or removal of any equipments by during
operation for maintenance purposes.
- A ramp is required in front of the door if it's not at the same level of the road.

MV and LV cables requirements:


- Incoming / outgoing MV cables should be through a 8'' PVC (10 bar) pipes filled with
foam after cable installations leaving 25% spare pipes.
- Incoming / outgoing LV cables should be through a 6'' PVC (10 bar) pipes filled with
foam after cable installations leaving 25% spare pipes.
- MV cables from TR to RMU are required to be unarmored type.
- Transformer MV cables should rise on a steel ladder to avoid exerting any mechanical
stresses on the bushings.

Approved Manufactures:
El Sewedy, AL Alamaia, Al Masryia, Al Giza, Energya, BICC.

Room Finishing:

Roof:
- Proper water isolation membrane should be installed above the room roof with
suitable drainage pipes to avoid any water accumulation.
- Roof is to be covered with proper tiles.

Floor
- 20 cm of helicopter concrete.
Transformers of Capacity 1500 - 2500 KVA 4
TAQA Power Technical Specifications

Walls
- Waterborne paints are to be used for room walls.
- All wall holes should be filled with spray foam (PVC pipes, Cable entries, RMU
cable entries and SWG cable entries).
- Steel grill covered louver is required to be installed at all room sides.

Electrical
- 220V, 16A output Sockets is required to be available in all the electrical rooms (2
sockets in each room).
- Exhaust fan is required to be installed in TR room for proper ventilation.
- A 24 hour timer or a thermostat is required for exhaust fan operation.
- Adequate emergency lamps equipped with batteries are to be installed in each
electrical room.
- Attached a drawing for power layout of electrical rooms.

Door
- The Door should have a louver for room ventilations covered with a steel grill.
- Door height is required to be not less than 3m
- Door should be aligned with the room floor.
- A door should have a steel locker.

15. Fire Fighting System:

RMU:
- Fire search system (CO2) – Capacity 6Kg. (1).
- Portable fire extinguisher, dry chemical power, capacity 12 Kg, Qty.(1)

Transformer:
- Ceiling mounted, self-actuated, stored pressure, dry chemical powder, multi-
purpose fire extinguisher – Capacity 12 Kg, Qty. (1).
- Portable fire extinguisher, dry chemical powder, capacity 12 Kg, Qty.(1)

LV Panel:
- Portable fire extinguisher, Dry Chemical Powder, capacity 12 Kg, Qty. (1)

16. General Requirements:


- All shop drawings for MV equipments is required to be approved before
manufacturing.
- All factory acceptance test (FAT) is required to be attended by one of our
representatives.
- Taqa company site representatives should be informed by the schedule of work for
their supervision.
- Equipments imported from other countries are required to be tested either in the
manufacturing country or in any other factories in Egypt if available.

Transformers of Capacity 1500 - 2500 KVA 5


4.0 3.0

E E

Shunt Trip
Coil

Space Heaters

4.0

TR fan Control
or
Buckolz Relay
DB

Exhaust
E Fan E

2.5 2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500-1500 Eng. Mohamed Hassan Adress:
KVA Oil / Dry Power Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-1500-3A
4.0 3.0

Outgoing RMU
3*240 mm2
AL/XLPE 18/36 KV

Measuring
Cell
Steel ladder

Incoming2

4.0

Incoming1

LV Cables

4 x 8" PVC pipes

2.5 2.5 To External Loop


Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500-1500 Eng. Mohamed Hassan Adress:
KVA Oil / Dry Equipments Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-1500-3A
1
2

3
RMU
To Frame point
Outgoing
To 22 KV
3 Cable Sheath

3 Measuring
4 Cell

To Frame point
To 22 KV cable
Sheath

Incoming2

Incoming1
4

Project: Sheet Title: Designed By: Owner:


Key:
Eng. Samy Abdel Malak TaqaPower Arabia
500-1500 Eng. Mohamed Hassan
1- 95 mm2 Bar Copper
Adress:
EarthingLayout Conductor
KVA Oil / Dry Eng.Mohamed khaled
2- 95 mm2 CU/PVC 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer 3- 50 mm2 Cu/PVC Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013
4- 10 mm2 Cu/PVC
website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-1500-3C
7.0

4.0

3.0

0.8

0.6
Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500-1500 KVA Eng. Mohamed Hassan Adress:
Oil / Dry Room Front View Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-1500-3B
E
DB

TR fan Control
or
E Buckolz Relay

Space Heaters

Shunt Trip
Coil

E
Exhaust
Fan

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500-1500 Eng. Mohamed Hassan Adress:
KVA Dry/ Oil Power Layout Eng. Mohamed Khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformers Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
28/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-500-1D
6.5
0.9

3.0

5.0

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


500-1500 Eng. Mohamed Hassan Adress:
KVA Dry/ Oil Front View Eng. Mohamed Khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformers Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
28/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-500-1B
TR

Outgoing

Incoming2

3
Incoming1

4
3

1
2

Project: Sheet Title: Designed By: Key: Owner:

Eng. Samy Abdel Malak 1- 95 mm2 Bar CopperTaqaPower Arabia


500-1500 Eng. Mohamed Hassan Conductor Adress:
KVA Dry/ Oil Earthing Layout Eng. Mohamed Khaled 2- 95 mm2 CU/PVC 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformers 3- 50 mm2 Cu/PVC Tel: +202-25260900

00 4- 10 mm2 Cu/PVC Fax: +202-25260911


Substation Rev:
28/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-500-1C
TR

Outgoing

Incoming2

3
Incoming1

4
3

1
2

Project: Sheet Title: Designed By: Key: Owner:

Eng. Samy Abdel Malak 1- 95 mm2 Bar CopperTaqaPower Arabia


500 KVA Dry/ Oil Eng. Mohamed Hassan Conductor Adress:
Transformers Earthing Layout Eng. Mohamed Khaled 2- 95 mm2 CU/PVC 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation 3- 50 mm2 Cu/PVC Tel: +202-25260900

00 4- 10 mm2 Cu/PVC Fax: +202-25260911


Rev:
Date: 28/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-500-1C


TAQA Power Technical Specifications

Section C

Transformers of
Capacity
1500-2500 KVA

Transformers of Capacity 1500 - 2500 KVA 6


TAQA Power Technical Specifications

C. Transformers of Capacity: 1500-2500 KVA


17. Feeding System:
 Scenario #1:

General Description:
Feeding will be through 2 SF6 RMU fed from the external MV loop. These RMUs
will be (3+M+1) the other one will be (2+M+1) feeding directly 2 Dry/Oil distribution
transformers, these RMUs will be fed from the external MV loop.
Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.
- Important loads (i.e. Hospitals), feeding system will be through 2 different MV feeding
cables with a LV ATS panel board, also a backup generator will be installed for all the
emergency loads inside the facility.
- For Transformers >1600 KVA a CB will be used instead of LBS for RMU outgoing
cell.

Single Line Diagram:

To External
MV Loop

RMU RMU
SF6 SF6
3+M+1 2+M+1
Spare

PT PT
22000 /110 22000 /110
630 A √3 √3
630 A
SF6 LBS SF6 LBS
Or Or
CB CB

CT x/5 CT x/5

Dry / Oil Dry / Oil


Transfromer Transfromer
22000 / 400 22000 / 400
Dyn11 Dyn11

 Metering:

Transformers of Capacity 1500 - 2500 KVA C-1


TAQA Power Technical Specifications

A summation KWH meters will be added in both RMU measuring cell to calculate
overall maximum load of the facility.

 Scenario #2:

General Description:
Feeding will be through a RMU SF6 (3+M+CB) feeding directly Dry/Oil
distribution transformers, RMU will be fed from the external MV loop.

Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.
- Important loads (i.e. Hospitals), feeding system will be through 2 different MV feeding
cables with a LV ATS panel board, also a backup generator will be installed for all the
emergency loads inside the facility.

SLD:
To External
MV Loop

RMU SF6
3+M+CB

630 A 630 A 630 A


SF6 LBS SF6 LBS SF6 LBS

Spare

PT
22000/110
√ 3 √3

630 A
SF6 CB

CT x/5/5

Dry / Oil
Transfromer
22000 / 400
Dyn11

Metering:
KWH meter is to be installed in the RMU measuring cell.

Transformers of Capacity 1500 - 2500 KVA C-2


TAQA Power Technical Specifications

18. Medium Voltage Equipments:

Transformers:

Oil immersed Type transformers:


- Maximum loading factor shouldn't exceed 80% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Technical specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method ONAN
Maximum temperature rise 45/55 K
Buchholz Relay Available
Mercury Thermometer Available
Bidirectional rollers Available
Earthing Terminal Available

Dry Type transformers:


- Maximum loading factor shouldn't exceed 95% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Transformers installed in a separate room will need no enclosure, in case of
installing both TR and RMU in same room the transformer should be equipped
with enclosure.
- Technical Specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method AN/AF
Insulation Class F/F
Maximum temperature rise 100/100 K
Climate/ Environment class/ Fire protection C2/ E2/ F1
Forced Cooling fans Available
Conductor Types AL or CU
Bidirectional rollers Available
Enclosure IP 23
Transformers of Capacity 1500 - 2500 KVA C-3
TAQA Power Technical Specifications

Earthing Terminal Available

Approved Manufacturers
 ABB / Schneider / El Sewedy / Eltas / Al Maco / EgyTrafo

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

19. Ring Main Units:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Type SF6
Bus bar rating 630 A
Rated short circuit current 20 KA/ 1 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz
 Incoming Cells:

Number Of Cells Scenario #1 RMU 1 3


Scenario #1 RMU 2 2
Scenario # 2 3
Type 630A
SF6 LBS
Earthing Switch available
Number of ELI 2
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Measuring Cells:

Voltmeters 0-24 KV

Transformers of Capacity 1500 - 2500 KVA C-4


TAQA Power Technical Specifications

Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5, Ith= 20KA
CL: 0.5 Burden: 10 VA
3 Ammeters (0-x) A
Voltmeter Selector Switch Available

Outgoing Cell

Outgoing Cell Scenario #1 TR <=1600 KVA SF6


630 A Fused LBS
Fuse : x A
Scenario #1 TR >1600 KVA SF6 CB
Scenario #2 SF6 CB
Earthing Switch Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Note: All CT ratio mentioned above as (x/5) and Fuse current mentioned as (x A) will be set
according to each required load separately.

Approved Manufacturers
 ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

20. Low Voltage Equipments


- A main LVP should be installed equipped with
 Air CB with ratings = 1.25*Rated Transformer current at low voltage side.
 Current transformer with CT ratio (x/5) according to TR rating.
- A diesel generator with low voltage ATS (2 out of 1) operation may be installed for
emergency and important loads.
- ATS installed should be of switched non overlapping neutral type.
- Power factor correction panel is required to be installed for maintaining a 0.9 PF
(minimum) according to the load type.

Approved Manufacturers
ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

Transformers of Capacity 1500 - 2500 KVA C-5


TAQA Power Technical Specifications

21. Earthing system


- A separate earthing system is required for both MV and LV equipments with
maximum earthing resistance 3 ohms.
- The approval for the proposed earthing system shall be approved after commissioning
where the measured resistance should achieve the desired values.
- Test link is required to be in an accessible place outside cable trenches.
- Attached a drawing showing earthing network design require by Taqa Power
Company.

22. Electrical Room Details


 Room dimensions , structure and location:
- A substation room is required to be built by the dimensions and structure shown in the
attached drawings for a TR and RMU in same room or separate rooms.
- The room doors should be on a main street with adequate space in front of it for
facilitating installation and removal of any of the equipments.
- For electrical substation rooms inside commercial buildings is required to be easily
accessible by a fork lift required for installing or removal of any equipments by during
operation for maintenance purposes.
- A ramp is required in front of the door if it's not at the same level of the road.

MV and LV cables requirements:


- Incoming / outgoing MV cables should be through a 8'' PVC (10 bar) pipes filled with
foam after cable installations leaving 25% spare pipes.
- Incoming / outgoing LV cables should be through a 6'' PVC (10 bar) pipes filled with
foam after cable installations leaving 25% spare pipes.
- MV cables from TR to RMU are required to be unarmored type.
- Transformer MV cables should rise on a steel ladder to avoid exerting any mechanical
stresses on the bushings.

Approved Manufactures:
El Sewedy, AL Alamaia, Al Masryia, Al Giza, Energya, BICC.

Room Finishing:

Roof:
- Proper water isolation membrane should be installed above the room roof with
suitable drainage pipes to avoid any water accumulation.
- Roof is to be covered with proper tiles.

Floor
- 20 cm of helicopter concrete.

Transformers of Capacity 1500 - 2500 KVA C-6


TAQA Power Technical Specifications

Walls
- Waterborne paints are to be used for room walls.
- All wall holes should be filled with spray foam (PVC pipes, Cable entries, RMU
cable entries and SWG cable entries).
- Steel grill covered louver is required to be installed at all room sides.

Electrical
- 220V, 16A output Sockets is required to be available in all the electrical rooms (2
sockets in each room).
- Exhaust fan is required to be installed in TR room for proper ventilation.
- A 24 hour timer or a thermostat is required for exhaust fan operation.
- Adequate emergency lamps equipped with batteries are to be installed in each
electrical room.
- Attached a drawing for power layout of electrical rooms.

Door
- The Door should have a louver for room ventilations covered with a steel grill.
- Door height is required to be not less than 3m
- Door should be aligned with the room floor.
- A door should have a steel locker.

23. Fire Fighting System:

RMU:
- Fire search system (CO2) – Capacity 6Kg. (1).
- Portable fire extinguisher, dry chemical power, capacity 12 Kg, Qty.(1)

Transformer:
- Ceiling mounted, self-actuated, stored pressure, dry chemical powder, multi-
purpose fire extinguisher – Capacity 12 Kg, Qty. (1).
- Portable fire extinguisher, dry chemical powder, capacity 12 Kg, Qty.(1)

LV Panel:
- Portable fire extinguisher, Dry Chemical Powder, capacity 12 Kg, Qty. (1)

24. General Requirements:


- All shop drawings for MV equipments is required to be approved before
manufacturing.
- All factory acceptance test (FAT) is required to be attended by one of our
representatives.
- Taqa company site representatives should be informed by the schedule of work for
their supervision.
- Equipments imported from other countries are required to be tested either in the
manufacturing country or in any other factories in Egypt if available.

Transformers of Capacity 1500 - 2500 KVA C-7


4.0 3.0

E E

Shunt Trip
Coil

Space Heaters

5.0

TR fan Control
or
Buckolz Relay
DB

Exhaust
E Fan E

2.5 2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


1500-2500 Eng. Mohamed Hassan Adress:
KVA Oil / Dry Power Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-2500-3A
4.0 3.0

Outgoing RMU
3*240 mm2
AL/XLPE 18/36 KV

Measuring
Cell

Steel ladder

Incoming2

5.0

Incoming1

LV Cables

4 x 8" PVC pipes

2.5 2.5 To External Loop


Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


1500-2500 Eng. Mohamed Hassan Adress:
KVA Oil / Dry Equipments Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-2500-3A
1
2

3
RMU
To Frame point
Outgoing
To 22 KV
3 Cable Sheath

3 Measuring
4 Cell

To Frame point
To 22 KV cable
Sheath

Incoming2

Incoming1
4

Project: Sheet Title: Designed By: Key: Owner:

Eng. Samy Abdel Malak 1- 95 mm2 Bar Copper


TaqaPower Arabia
1500-2500 Eng. Mohamed Hassan Conductor Adress:
KVA Oil / Dry EarthingLayout Eng.Mohamed khaled 2- 95 mm2 CU/PVC 57 Cornish El Nile El Maadi-Cairo- Egypt C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer 3- 50 mm2 Cu/PVC Tel: +202-25260900


00 4- 10 mm2 Cu/PVC Fax: +202-25260911
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-2500-3C
E E E
2*(1*2)mm2 Cu/PVC

Shunt Trip Shunt Trip


Coil Coil

Space Heaters Space Heaters

TR fan Control
or
Buckolz Relay TR fan Control
DB DB or
Buckolz Relay

Exhaust
Exhaust
Fan
E Fan E E

To External Loop
2.5 2.5 2.5

Project: Sheet Title: Designed By: Key:


Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


1500-2500 KVA Eng. Mohamed Hassan All Cable Used are Adress:
Oil / Dry Power Layout Eng.Mohamed khaled 1*2 mm2 CU/PVC 450/750 V
57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-2500-1D
4.0 4.0 4.0

0.6

Outgoing Outgoing
3*240 mm2 RMU 2 RMU 1 3*240 mm2
AL/XLPE 18/36 KV AL/XLPE 18/36 KV
Measuring Measuring
Steel ladder Cell Steel ladder
Cell

Incoming2 Incoming2

5.0

Incoming1 Incoming1

4 x 8" PVC pipes

To External Loop
2.5 2.5 2.5
4 x 8" PVC pipes

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


1500-2500 KVA Eng. Mohamed Hassan Adress:
Oil / Dry Equipments Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Room Front View Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
29/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-6000-2A
4.0 4.0 4.0

5.0

3.0

0.6 0.6
0.2
0.2

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


1500 -2500 KVA Eng. Mohamed Hassan Adress:
Oil / Dry Front View Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-2500-1B
2 2

3
Outgoing Outgoing
Test link RMU 2 RMU 1
To 22 KV To 22 KV
Cable Sheath Cable Sheath

Measuring Measuring
3
Cell Cell
To Frame point 4
To Frame point To Frame point
To 22 KV To 22 KV
Cable Sheath To Frame point Cable Sheath

Incoming2 Incoming2

Incoming1 Incoming1

Project: Sheet Title: Designed By: Key: Owner:

Eng. Samy Abdel Malak


1- 95 mm2 Bar CopperTaqaPower Arabia
1500-2500 KVA Eng. Mohamed Hassan Conductor Adress:
Oil / Dry Earthing Layout Eng.Mohamed khaled 2- 95 mm2 CU/PVC 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp
3- 50 mm2 Cu/PVC Tel: +202-25260900
Transformer 4- 10 mm2 Cu/PVC Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-2500-1C
7.0

5.0

3.0

0.8

0.6
Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


1500-2500 KVA Eng. Mohamed Hassan Adress:
Oil / Dry Room Front View Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Transformer Tel: +202-25260900

Fax: +202-25260911
00
Substation Rev:
27/5/2013 website: www.taqa.com.eg
Date:
Dwg. No: STD/GLB/DO-2500-3B
TAQA Power Technical Specifications

Section D

Demanded Loads

4-6 MVA

Demanded Load 4 - 6 MVA 0


TAQA Power Technical Specifications

D. Demanded Load: 4-6 MVA


25. Feeding System:
 Scenario #1:

General Description:
Feeding will be through 2 SF6 RMU fed from the external MV loop. These RMUs
will be (3+M+CB) the other one will be (2+M+CB) feeding directly 2 Dry/Oil
distribution transformers, these RMUs will be fed from the external MV loop.
Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.
- Important loads (i.e. Hospitals), feeding system will be through 2 different MV feeding
cables with a LV ATS panel board, also a backup generator will be installed for all the
emergency loads inside the facility.

Single Line Diagram:

To External
MV Loop

SF6 RMU SF6 RMU


3+M+CB 2+M+CB

Spare

PT PT
22000 /110 22000 /110
√3 √3 √3 √3
SF6 630A
SF6 630A CB
CB

CT x/5/5 CT x/5/5

Dry / Oil Dry / Oil


Transfromer Transfromer
22000 / 400 22000 / 400
Dyn11 Dyn11

Metering:
A summation KWH meters are to be installed in each RMU measuring cell.

Demanded Load 6 - 8 MVA 0


TAQA Power Technical Specifications

 Scenario # 2:

General Description:
Feeding will be through 2 RMU (4+M+0) and (3+M+0) feeding two incoming CB
of a switchgear which in its turn will feed directly the facility tansformers. The RMUs
should be connected to different external MV loops.

SLD:
To External
MV Loop 1

To External
MV Loop 2

RMU RMU
4+M+0 3+M+0
Spare

PT PT
22000 /110 22000 /110
√3 √3 √3 √3

CT x/5 CT x/5

Customer
Switch Gear

Dry / Oil Dry / Oil


Dry / Oil Dry / Oil Transfromer Transfromer
Transfromer Transfromer 22000 / 400 22000 / 400
22000 / 400 22000 / 400 Dyn11 Dyn11
Dyn11 Dyn11

Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.

Metering:
A summation KWH meters are to be installed in each RMU measuring cell.
Demanded Load 6 - 8 MVA 1
TAQA Power Technical Specifications

26. Medium Voltage Equipments:

Transformers:

Oil immersed Type transformers:


- Maximum loading factor shouldn't exceed 80% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076

- Technical specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method ONAN
Maximum temperature rise 45/55 K
Buchholz Relay Available
Mercury Thermometer Available
Bidirectional rollers Available
Earthing Terminal Available

Dry Type transformers:


- Maximum loading factor shouldn't exceed 95% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Technical Specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method AN/AF
Insulation Class F/F
Maximum temperature rise 100/100 K
Climate/ Environment class/ Fire protection C2/ E2/ F1
Forced Cooling fans Available
Conductor Types AL or CU
Bidirectional rollers Available
Enclosure IP 00

Demanded Load 6 - 8 MVA 2


TAQA Power Technical Specifications

Earthing Terminal Available

Approved Manufacturers
 ABB / Schneider / El Sewedy / Eltas / Al Maco / EgyTrafo

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

27. Ring Main Units:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Type SF6
Bus bar rating 630 A
Rated short circuit current 20 KA/ 1 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz

Incoming Cells:

Number Of Cells Scenario # 1,2 RMU 1 3


Scenario # 1,2 RMU 2 2
Type SF6 LBS
Earthing switch Available
Number of ELI 2
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Measuring Cells:

Demanded Load 6 - 8 MVA 3


TAQA Power Technical Specifications

Voltmeters 0-24 KV
Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5, Ith= 20KA
CL: 0.5 Burden: 10 VA
3 Ammeters (0-x) A
Voltmeter Selector Switch Available

Outgoing Cell

Outgoing Cell Scenario #1 RMU 1,2 630 A


SF6 CB
Scenario #2 RMU 1,2 630 A
SF6 LBS without
Fuse
Earthing Switch
Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Approved Manufacturers
 ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

28. Switch Gear:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Bus bar rating 1250 A
Rated short circuit current 25 KA/ 3 Sec
Peak withstand Voltage 50 KV RMS (1 min)

Demanded Load 6 - 8 MVA 4


TAQA Power Technical Specifications

Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz
Ambient Temperature 40°C
110 VAC from PT
110 VDC from
Control Voltage
CTU/ battery
charger

Incoming Cells:

Number Of Cells 2
Circuit Breaker type 1250 A
SF6 / Vacuum CB
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 1- Non Directional Earth Fault, over current.
2- Short Circuit
3- Over, Under Voltage.
4- Three Phase inrush current detection.
5- Negative sequence over current.
6- Thermal Overload.
7- Circuit breaker failure.
Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5/5, Ith= 25 KA
CL: 0.5 , CL: 5P10
Voltmeter 0-24 KV
3 Ammeters (0-x) A
Power Meter (KWH, KVARH, KW, KVAR, PF) Available
Voltmeter Selector Switch Available
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available

Demanded Load 6 - 8 MVA 5


TAQA Power Technical Specifications

AC / DC loss Flag Available


Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Outgoing Cells:

Number Of Cells 2 or more


Circuit Breaker Type 630 A
SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 1- Non Directional Earth Fault, over current.
2- Short Circuit
3- Three Phase inrush current detection.
4- Negative sequence over current.
5- Thermal Overload.
6- Circuit breaker failure.
Current Transformer X/5/5, Ith= 20KA
CL: 0.5, 5P10
3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Bus Coupler Cell:


Circuit Breaker Type 1250 A
SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
Demanded Load 6 - 8 MVA 6
TAQA Power Technical Specifications

- Breaking Capacity 25 KA.


Earthing Switch
Available
Protection relay 1- Non Directional Earth Fault, over current.
2- Short Circuit
3- Three Phase inrush current detection.
4- Negative sequence over current.
5- Thermal Overload.
6- Circuit breaker failure.
Current Transformer X/5/5, Ith= 25KA
CL: 0.5 , 5P10
3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

29. Low Voltage Equipments


- A main LVP should be installed equipped with
 Air CB with ratings = 1.25*Rated Transformer current at low voltage side.
- A diesel generator with low voltage ATS (2 out of 1) operation may be installed for
emergency and important loads.
- ATS installed should be of switched non overlapping neutral type.
- Power factor correction panel is required to be installed for maintaining a 0.9 PF
(minimum) according to the load type.

Approved Manufacturers
ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

30. Earthing system


- A separate earthing system is required for both MV and LV equipments with
maximum earthing resistance 3 ohms.
- The approval for the proposed earthing system shall be approved after commissioning
where the measured resistance should achieve the desired values.
- Test link is required to be in an accessible place outside cable trenches.

Demanded Load 6 - 8 MVA 7


TAQA Power Technical Specifications

- Attached a drawing showing earthing network design require by Taqa Power


Company.

31. Electrical Room Details

Room dimensions, structure and location:


- A substation room is required to be built by the dimensions and structure shown in
the attached drawings for all Scenarios.
- The room doors should be on a main street with adequate space in front of it for
facilitating installation and removal of any of the equipments.
- For electrical substation rooms inside commercial buildings is required to be easily
accessible by a fork lift required for installing or removal of any equipments by
during operation for maintenance purposes.
- A ramp is required in front of the door if it's not at the same level of the road.

MV and LV cables requirements:


- Incoming / outgoing MV cables should be through a 8'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- Incoming / outgoing LV cables should be through a 6'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- MV cables used inside the room should be unarmored type.
- An exhaust fan is required to be installed in the transformer room to be operated by
either thermostat or 24 hours timer.
- Transformer MV cables should rise on a steel ladder to avoid exerting any mechanical
stresses on the bushings.

Approved Manufactures:
El Sewedy, AL Alamaia, Al Masryia, Al Giza, Energya, BICC.

Room Finishing:

Roof:
- Proper water isolation membrane should be installed above the room roof with
suitable drainage pipes to avoid any water accumulation.
- Roof is to be covered with proper tiles.

Floor
- 20 cm of helicopter concrete.

Walls
- Waterborne paints are to be used for room walls.

Demanded Load 6 - 8 MVA 8


TAQA Power Technical Specifications

- All wall holes should be filled with spray foam (PVC pipes, Cable entries, RMU
cable entries and SWG cable entries).
- Steel grill covered louver is required to be installed at all room sides.

Electrical
- 220V, 16A output Sockets is required to be available in all the electrical rooms (2
sockets in each room).
- Exhaust fan is required to be installed in TR, SWG room for proper ventilation.
- A 24 hour timer or a thermostat is required for exhaust fan operation.
- Adequate emergency lamps equipped with batteries are to be installed in each
electrical room.
- Attached a drawing for power layout of electrical rooms.

Door
- The Door should have a louver for room ventilations covered with a steel grill.
- Door height is required to be not less than 3m
- Door should be aligned with the room floor.
- A door should have a steel locker.

32. Fire Fighting System:

RMU:
- Fire search system (CO2) – Capacity 6Kg. (1).
- Portable fire extinguisher, dry chemical power, capacity 12 Kg, Qty.(1)

Transformer:
- Ceiling mounted, self-actuated, stored pressure, dry chemical powder, multi-
purpose fire extinguisher – Capacity 12 Kg, Qty. (1).
- Portable fire extinguisher, dry chemical powder, capacity 12 Kg, Qty.(1)

LV Panel:
- Portable fire extinguisher, Dry Chemical Powder, capacity 12 Kg, Qty. (1).

Switch Gear
- Distributor Cells:
Fire search system – CO2 – equipped with fire alarm system (visual and sound).

Distributor room:
 Portable Dry Powder fire extinguisher – 12 Kg, Qty (6).
 CO2 fire extinguisher – 6 Kg, Qty (3).
 First Aid Kit (24 Persons)
Demanded Load 6 - 8 MVA 9
TAQA Power Technical Specifications

 Illuminated Exit lights


 Emergency lights, Qty (8).
 Safety Signs (Warning – Mandatory – Prohibition).

33. General Requirements:


- All shop drawings for MV equipments is required to be approved before
manufacturing.
- All factory acceptance test (FAT) is required to be attended by one of our
representatives.
- Taqa company site representatives should be informed by the schedule of work for
their supervision.
- Equipments imported from other countries are required to be tested either in the
manufacturing country or in any other factories in Egypt if available.

Demanded Load 6 - 8 MVA 10


E E E E E

To Circyuit Breaker
Trip Coil

Space Heaters
Space Heaters

Buckloz relay Buckloz relay


Buckloz relay
DB DB OR DB
OR
DB OR
Fan Control Unit Fan Control Unit
Fan Control Unit
Exhaust Exhaust Exhaust
Fan Fan Fan

E E E E E

2.5 2.5
2.5 2.5 2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


4-6 MVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Lighting & Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Power Layout Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2D


4.0 9.0 3.0

0.6
1.0

Outgoing Outgoing
0.8 Steel ladder Steel ladder Steel ladder
TR TR TR
Measuring Cell Measuring
Cell
J1 J2 J3 J4 J5 J6 J7
5.0 Outgoing 3
Outgoing 2 Incoming 1 Buscoupler Bus Riser Incoming 2 Outgoing 1
Incoming2 Incoming2

1.0
Incoming1
1.1

Incoming1

2.0
1.5

2.5 2.5

2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


4-6 MVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Equipments Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Room Front View Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2A


Outgoing Outgoing
TR TR TR
Measuring Cell Measuring
Cell

22 KV Cable Sheath J1 J2 J3 J4 J5 J6 J7 22 KV Cable Sheath

Outgoing 2 Incoming 1 Buscoupler Bus Riser Incoming 2 Outgoing 1 Outgoing 3


Incoming2 Incoming2

Incoming1 Frame point 22 KV Cable Sheath Frame point


SWG
Incoming1 3 3 SWG
3 3
3 3
3
Frame point
RMU
4
4 4 4

2 2 2
Concrete Inspection Pit eqipped with rod 2

Project: Sheet Title: Designed By: Key


Owner:

Eng. Samy Abdel Malak 1- 120 mm2 , Bar Copper conductor TaqaPower Arabia
4-6 MVA Oil / Dry Eng. Mohamed Hassan 2- 120 mm2, Copper Conductor PVCAdress:
Transformer Earthing Layout Eng.Mohamed khaled insulated
3- 50mm2, Copper Conductor PVC 57 Cornish El Nile El Maadi-Cairo- Egypt C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation insulated Tel: +202-25260900


4- 10mm2, Copper Conductor PVC Fax: +202-25260911
Rev: 00 insulated
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2C


4.0 9.0 9.0

5.0

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


4-6 MVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Room Front View Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2B


TAQA Power Technical Specifications

Section E

Demanded Load

6-8 MVA

Demanded Load 6 - 8 MVA 11


TAQA Power Technical Specifications

E. Demanded Load: 6-8 MVA


34. Feeding System:

General Description:
Feeding will be through 2 RMU SF6 (3+M+0) feeding two incoming CB of a
switchgear. The RMUs should be connected directly to the main DP.
Feeding strategy inside the facility may be through a MV loop or feeding the
transformers directly from the switchgear.

Single Line Diagram:

3*240 mm2 AL/XLPE/18/36 KV


TO main
DP

To main 3*240 mm2 AL/XLPE/18/36 KV

DP

RMU RMU
3+M+0 3+M+0
Spare

PT PT
22000 /110 22000 /110
√3 √3 √3 √3

CT x/5 CT x/5

Customer
Switch Gear

Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.
Demanded Load 6 - 8 MVA 0
TAQA Power Technical Specifications

Metering:
A summation KWH meters are to be installed in each RMU measuring cell.

35. Medium Voltage Equipment:

Transformers:

Oil immersed Type transformers:


- Maximum loading factor shouldn't exceed 80% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076

- Technical specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method ONAN
Maximum temperature rise 45/55 K
Buchholz Relay Available
Mercury Thermometer Available
Bidirectional rollers Available
Earthing Terminal Available

Dry Type transformers:


- Maximum loading factor shouldn't exceed 95% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Technical Specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method AN/AF
Insulation Class F/F
Maximum temperature rise 100/100 K
Climate/ Environment class/ Fire protection C2/ E2/ F1
Forced Cooling fans Available
Conductor Types AL or CU
Demanded Load 6 - 8 MVA 1
TAQA Power Technical Specifications

Bidirectional rollers Available


Enclosure IP 00
Earthing Terminal Available

Approved Manufacturers
 ABB / Schneider / El Sewedy / Eltas / Al Maco / EgyTrafo

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

36. Ring Main Units:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Type SF6
Bus bar rating 630 A
Rated short circuit current 20 KA/ 1 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz

Incoming Cells:

Number of Cells 2
Type SF6 LBS
Earthing switch Available
Number of ELI 1
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Demanded Load 6 - 8 MVA 2


TAQA Power Technical Specifications

Measuring Cells:

Voltmeters 0-24 KV
Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5, Ith= 20KA
CL: 0.5 Burden: 10 VA
3 Ammeters (0-x) A
Voltmeter Selector Switch Available

Outgoing Cell

Outgoing Cell 630 ASF6 CB


Earthing Switch
Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Approved Manufacturers
 ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

37. Switch Gear:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Bus bar rating 1250 A
Rated short circuit current 25 KA/ 3 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz

Demanded Load 6 - 8 MVA 3


TAQA Power Technical Specifications

Ambient Temperature 40°C


110 VAC from PT
110 VDC from
Control Voltage
CTU/ battery
charger

Incoming Cells:

Number Of Cells 2
Circuit Breaker type 1250 A
SF6 / Vacuum CB
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 8- Non Directional Earth Fault, over current.
9- Short Circuit
10- Over, Under Voltage.
11- Three Phase inrush current detection.
12- Negative sequence over current.
13- Thermal Overload.
14- Circuit breaker failure.
Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5/5, Ith= 25 KA
CL: 0.5 , CL: 5P10
Voltmeter 0-24 KV
3 Ammeters (0-x) A
Power Meter (KWH, KVARH, KW, KVAR, PF) Available
Voltmeter Selector Switch Available
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
AC / DC loss Flag Available
Space heater with a hygrostat in each cell 200 W

Demanded Load 6 - 8 MVA 4


TAQA Power Technical Specifications

Capacitive divider (24 KV) with HV presence led indicators Available

Outgoing Cells:

Number Of Cells 2 or more


Circuit Breaker Type 630 A
SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 7- Non Directional Earth Fault, over current.
8- Short Circuit
9- Three Phase inrush current detection.
10- Negative sequence over current.
11- Thermal Overload.
12- Circuit breaker failure.
Current Transformer X/5/5, Ith= 20KA
CL: 0.5, 5P10
3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Bus Coupler Cell:


Circuit Breaker Type 1250 A
SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch
Available

Demanded Load 6 - 8 MVA 5


TAQA Power Technical Specifications

Protection relay 7- Non Directional Earth Fault, over current.


8- Short Circuit
9- Three Phase inrush current detection.
10- Negative sequence over current.
11- Thermal Overload.
12- Circuit breaker failure.
Current Transformer X/5/5, Ith= 25KA
CL: 0.5 , 5P10
3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available
AC Horn Available

38. Low Voltage Equipments


- A main LVP should be installed equipped with
 Air CB with ratings = 1.25*Rated Transformer current at low voltage side.
- A diesel generator with low voltage ATS (2 out of 1) operation may be installed for
emergency and important loads.
- ATS installed should be of switched non overlapping neutral type.
- Power factor correction panel is required to be installed for maintaining a 0.9 PF
(minimum) according to the load type.

Approved Manufacturers
ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

39. Earthing system


- A separate earthing system is required for both MV and LV equipments with
maximum earthing resistance 3 ohms.
- The approval for the proposed earthing system shall be approved after commissioning
where the measured resistance should achieve the desired values.
- Test link is required to be in an accessible place outside cable trenches.
- Attached a drawing showing earthing network design require by Taqa Power
Company.

Demanded Load 6 - 8 MVA 6


TAQA Power Technical Specifications

40. Electrical Room Details

Room dimensions , structure and location:


- A substation room is required to be built by the dimensions and structure shown in
the attached drawings for all Scenarios.
- The room doors should be on a main street with adequate space in front of it for
facilitating installation and removal of any of the equipments.
- For electrical substation rooms inside commercial buildings is required to be easily
accessible by a fork lift required for installing or removal of any equipments by
during operation for maintenance purposes.
- A ramp is required in front of the door if it's not at the same level of the road.

MV and LV cables requirements:


- Incoming / outgoing MV cables should be through a 8'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- Incoming / outgoing LV cables should be through a 6'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- MV cables used inside the room should be unarmored type.
- An exhaust fan is required to be installed in the transformer room to be operated by
either thermostat or 24 hours timer.
- Transformer MV cables should rise on a steel ladder to avoid exerting any mechanical
stresses on the bushings.

Approved Manufactures:
El Sewedy, AL Alamaia, Al Masryia, Al Giza, Energya, BICC.

Room Finishing:

Roof:
- Proper water isolation membrane should be installed above the room roof with
suitable drainage pipes to avoid any water accumulation.
- Roof is to be covered with proper tiles.

Floor
- 20 cm of helicopter concrete.

Walls
- Waterborne paints are to be used for room walls.
- All wall holes should be filled with spray foam (PVC pipes, Cable entries, RMU
cable entries and SWG cable entries).
- Steel grill covered louver is required to be installed at all room sides.

Demanded Load 6 - 8 MVA 7


TAQA Power Technical Specifications

Electrical
- 220V, 16A output Sockets is required to be available in all the electrical rooms (2
sockets in each room).
- Exhaust fan is required to be installed in TR, SWG room for proper ventilation.
- A 24 hour timer or a thermostat is required for exhaust fan operation.
- Adequate emergency lamps equipped with batteries are to be installed in each
electrical room.
- Attached a drawing for power layout of electrical rooms.

Door
- The Door should have a louver for room ventilations covered with a steel grill.
- Door height is required to be not less than 3m
- Door should be aligned with the room floor.
- A door should have a steel locker.

41. Fire Fighting System:

RMU:
- Fire search system (CO2) – Capacity 6Kg. (1).
- Portable fire extinguisher, dry chemical power, capacity 12 Kg, Qty.(1)

Transformer:
- Ceiling mounted, self-actuated, stored pressure, dry chemical powder, multi-
purpose fire extinguisher – Capacity 12 Kg, Qty. (1).
- Portable fire extinguisher, dry chemical powder, capacity 12 Kg, Qty.(1)

LV Panel:
- Portable fire extinguisher, Dry Chemical Powder, capacity 12 Kg, Qty. (1).

Switch Gear
- Distributor Cells:
Fire search system – CO2 – equipped with fire alarm system (visual and sound).

Distributor room:
 Portable Dry Powder fire extinguisher – 12 Kg, Qty (6).
 CO2 fire extinguisher – 6 Kg, Qty (3).
 First Aid Kit (24 Persons)
 Illuminated Exit lights
 Emergency lights, Qty (8).
 Safety Signs (Warning – Mandatory – Prohibition).
Demanded Load 6 - 8 MVA 8
TAQA Power Technical Specifications

42. General Requirements:


- All shop drawings for MV equipment are required to be approved before
manufacturing.
- All factory acceptance test (FAT) is required to be attended by one of our
representatives.
- Taqa company site representatives should be informed by the schedule of work for
their supervision.
- Equipment imported from other countries are required to be tested either in the
manufacturing country or in any other factories in Egypt if available.

Demanded Load 6 - 8 MVA 9


TAQA Power Technical Specifications

Section F

Demanded Load

8-12 MVA

Demanded Load 8 - 12 MVA 1


TAQA Power Technical Specifications

F. Demanded Load: 8-12 MVA


43. Feeding System:

General Description:
Feeding will be 2 direct (3*300 mm2 AL/XLPE/18/36KV) MV cables from the
main substation to the customer switchgear
Feeding strategy inside the facility may be through a MV loop or feeding the
transformers directly from the switch gear (Number of outgoing cells is customer
scope).

Single Line Diagram:

To
Substation

Customer
Switch Gear

Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.

Metering:
A summation KWH meters are to be installed in the main substation

Demanded Load 8 - 12 MVA F-1


TAQA Power Technical Specifications

44. Medium Voltage Equipments:

Transformers:

Oil immersed Type transformers:


- Maximum loading factor shouldn't exceed 80% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076

- Technical specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method ONAN
Maximum temperature rise 45/55 K
Buchholz Relay Available
Mercury Thermometer Available
Bidirectional rollers Available
Earthing Terminal Available

Dry Type transformers:


- Maximum loading factor shouldn't exceed 95% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Technical Specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method AN/AF
Insulation Class F/F
Maximum temperature rise 100/100 K
Climate/ Environment class/ Fire protection C2/ E2/ F1
Forced Cooling fans Available
Conductor Types AL or CU
Bidirectional rollers Available
Enclosure IP 00
Earthing Terminal Available

Demanded Load 8 - 12 MVA F-2


TAQA Power Technical Specifications

Approved Manufacturers
 ABB / Schneider / El Sewedy / Eltas / Al Maco / EgyTrafo

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

45. Ring Main Units:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Type SF6
Bus bar rating 630 A
Rated short circuit current 20 KA/ 1 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz

Incoming Cells:

Number of Cells 2
Type SF6 LBS
Earthing switch Available
Number of ELI 1
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Measuring Cells:

Voltmeters 0-24 KV
Potential transformer

Burden: (500-100) VA CL: 0.5

Demanded Load 8 - 12 MVA F-3


TAQA Power Technical Specifications

Current Transformer X/5, Ith= 20KA


CL: 0.5 Burden: 10 VA
3 Ammeters (0-x) A
Voltmeter Selector Switch Available

Outgoing Cell

Outgoing Cell 630 ASF6 CB


Earthing Switch
Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Approved Manufacturers
 ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

46. Switch Gear:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Bus bar rating 1250 A
Rated short circuit current 25 KA/ 3 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz
Ambient Temperature 40°C
110 VAC from PT
110 VDC from
Control Voltage
CTU/ battery
charger

Demanded Load 8 - 12 MVA F-4


TAQA Power Technical Specifications

Incoming Cells:

Number Of Cells 2
Circuit Breaker type 1250 A
SF6 / Vacuum CB
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 15- Non Directional Earth Fault, over current.
16- Short Circuit
17- Over, Under Voltage.
18- Three Phase inrush current detection.
19- Negative sequence over current.
20- Thermal Overload.
21- Circuit breaker failure.
Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5/5, Ith= 25 KA
CL: 0.5 , CL: 5P10
Voltmeter 0-24 KV
3 Ammeters (0-x) A
Power Meter (KWH, KVARH, KW, KVAR, PF) Available
Voltmeter Selector Switch Available
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
AC / DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Outgoing Cells:

Number Of Cells 2 or more

Demanded Load 8 - 12 MVA F-5


TAQA Power Technical Specifications

Circuit Breaker Type 630 A


SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 13- Non Directional Earth Fault, over current.
14- Short Circuit
15- Three Phase inrush current detection.
16- Negative sequence over current.
17- Thermal Overload.
18- Circuit breaker failure.
Current Transformer X/5/5, Ith= 20KA
CL: 0.5, 5P10
3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Bus Coupler Cell:


Circuit Breaker Type 1250 A
SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch
Available
Protection relay 13- Non Directional Earth Fault, over current.
14- Short Circuit
15- Three Phase inrush current detection.
16- Negative sequence over current.
17- Thermal Overload.
18- Circuit breaker failure.
Current Transformer X/5/5, Ith= 25KA

Demanded Load 8 - 12 MVA F-6


TAQA Power Technical Specifications

CL: 0.5 , 5P10


3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available
AC / DC horn Available

47. Low Voltage Equipments


- A main LVP should be installed equipped with
 Air CB with ratings = 1.25*Rated Transformer current at low voltage side.
- A diesel generator with low voltage ATS (2 out of 1) operation may be installed for
emergency and important loads.
- ATS installed should be of switched non overlapping neutral type.
- Power factor correction panel is required to be installed for maintaining a 0.9 PF
(minimum) according to the load type.

Approved Manufacturers
ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

48. Earthing system


- A separate earthing system is required for both MV and LV equipments with
maximum earthing resistance 3 ohms.
- The approval for the proposed earthing system shall be approved after commissioning
where the measured resistance should achieve the desired values.
- Test link is required to be in an accessible place outside cable trenches.
- Attached a drawing showing earthing network design require by Taqa Power
Company.

49. Electrical Room Details

Room dimensions , structure and location:


- A substation room is required to be built by the dimensions and structure shown in
the attached drawings for all Scenarios.

Demanded Load 8 - 12 MVA F-7


TAQA Power Technical Specifications

- The room doors should be on a main street with adequate space in front of it for
facilitating installation and removal of any of the equipments.
- For electrical substation rooms inside commercial buildings is required to be easily
accessible by a fork lift required for installing or removal of any equipments by
during operation for maintenance purposes.
- A ramp is required in front of the door if it's not at the same level of the road.

MV and LV cables requirements:


- Incoming / outgoing MV cables should be through a 8'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- Incoming / outgoing LV cables should be through a 6'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- MV cables used inside the room should be unarmored type.
- An exhaust fan is required to be installed in the transformer room to be operated by
either thermostat or 24 hours timer.
- Transformer MV cables should rise on a steel ladder to avoid exerting any mechanical
stresses on the bushings.

Approved Manufactures:
El Sewedy, AL Alamaia, Al Masryia, Al Giza, Energya, BICC.

Room Finishing:

Roof:
- Proper water isolation membrane should be installed above the room roof with
suitable drainage pipes to avoid any water accumulation.
- Roof is to be covered with proper tiles.

Floor
- 20 cm of helicopter concrete.

Walls
- Waterborne paints are to be used for room walls.
- All wall holes should be filled with spray foam (PVC pipes, Cable entries, RMU
cable entries and SWG cable entries).
- Steel grill covered louver is required to be installed at all room sides.

Electrical
- 220V, 16A output Sockets is required to be available in all the electrical rooms (2
sockets in each room).
- Exhaust fan is required to be installed in TR, SWG room for proper ventilation.

Demanded Load 8 - 12 MVA F-8


TAQA Power Technical Specifications

- A 24 hour timer or a thermostat is required for exhaust fan operation.


- Adequate emergency lamps equipped with batteries are to be installed in each
electrical room.
- Attached a drawing for power layout of electrical rooms.

Door
- The Door should have a louver for room ventilations covered with a steel grill.
- Door height is required to be not less than 3m
- Door should be aligned with the room floor.
- A door should have a steel locker.

50. Fire Fighting System:

RMU:
- Fire search system (CO2) – Capacity 6Kg. (1).
- Portable fire extinguisher, dry chemical power, capacity 12 Kg, Qty.(1)

Transformer:
- Ceiling mounted, self-actuated, stored pressure, dry chemical powder, multi-
purpose fire extinguisher – Capacity 12 Kg, Qty. (1).
- Portable fire extinguisher, dry chemical powder, capacity 12 Kg, Qty.(1)

LV Panel:
- Portable fire extinguisher, Dry Chemical Powder, capacity 12 Kg, Qty. (1).

Switch Gear
- Distributor Cells:
Fire search system – CO2 – equipped with fire alarm system (visual and sound).

Distributor room:
 Portable Dry Powder fire extinguisher – 12 Kg, Qty (6).
 CO2 fire extinguisher – 6 Kg, Qty (3).
 First Aid Kit (24 Persons)
 Illuminated Exit lights
 Emergency lights, Qty (8).
 Safety Signs (Warning – Mandatory – Prohibition).

Demanded Load 8 - 12 MVA F-9


TAQA Power Technical Specifications

51. General Requirements:


- All shop drawings for MV equipments is required to be approved before
manufacturing.
- All factory acceptance test (FAT) is required to be attended by one of our
representatives.
- Taqa company site representatives should be informed by the schedule of work for
their supervision.
- Equipments imported from other countries are required to be tested either in the
manufacturing country or in any other factories in Egypt if available.

Demanded Load 8 - 12 MVA F-10


E E E E E

To Circyuit Breaker
Trip Coil

Space Heaters
Space Heaters

Buckloz relay Buckloz relay


Buckloz relay
DB DB OR DB
OR
DB OR
Fan Control Unit Fan Control Unit
Fan Control Unit
Exhaust Exhaust Exhaust
Fan Fan Fan

E E E E E

2.5 2.5
2.5 2.5 2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


6-10 MVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Lighting & Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Power Layout Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2D


4.0 9.0 9.0

5.0

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


6-10 MVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Room Front View Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2B


4.0 9.0 3.0

0.6
1.0

Outgoing Outgoing
0.8 Steel ladder Steel ladder Steel ladder
TR TR TR
Measuring Cell Measuring
Cell
J1 J2 J3 J4 J5 J6 J7
5.0 Outgoing 3
Outgoing 2 Incoming 1 Buscoupler Bus Riser Incoming 2 Outgoing 1
Incoming2 Incoming2

1.0
Incoming1
1.1

Incoming1

2.0
1.5

2.5 2.5

2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


6-10 MVA Oil / Dry Eng. Mohamed Hassan Adress:
Transformer Equipments Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp

Substation Room Front View Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2A


Outgoing Outgoing
TR TR TR
Measuring Cell Measuring
Cell

22 KV Cable Sheath J1 J2 J3 J4 J5 J6 J7 22 KV Cable Sheath

Outgoing 2 Incoming 1 Buscoupler Bus Riser Incoming 2 Outgoing 1 Outgoing 3


Incoming2 Incoming2

Incoming1 Frame point 22 KV Cable Sheath Frame point


SWG
Incoming1 3 3 SWG
3 3
3 3
3
Frame point
RMU
4
4 4 4

2 2 2
Concrete Inspection Pit eqipped with rod 2

Project: Sheet Title: Designed By: Key Owner:


1- 120 mm2 , Bar Copper conductor
Eng. Samy Abdel Malak TaqaPower Arabia
6-10 MVA Oil / Dry Eng. Mohamed Hassan
2- 120 mm2, Copper Conductor PVC
Adress:
insulated
Transformer Earthing Layout Eng.Mohamed khaled 3- 50mm2, Copper Conductor PVC 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp
insulated
Substation 4- 10mm2, Copper Conductor PVC
Tel: +202-25260900

insulated Fax: +202-25260911


Rev: 00
Date: 29/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-4-6-2C


TAQA Power Technical Specifications

Section G

Demand Load
12-30 MVA

Demanded Load 8 - 12 MVA F-11


TAQA Power Technical Specifications

G. Demanded Load: 12-30 MVA


52. Feeding System:

General Description:
Feeding will be through 4 direct MV cables from the main substation to the
customer switchgear
Feeding strategy inside the facility may be through MV loops or directly feeding
number of transformers.

Maximum load Cable cross sectional area


8-16 MVA 3*240 mm2 AL/XLPE
16-30 MVA 3*300 mm2 AL/XLPE

Single Line Diagram:

To
Substation

Customer
Switch Gear

Notes:
- For electrical substation rooms inside commercial or administration buildings Dry
transformer will be only used.

Metering:
A summation KWH meters are to be installed in the main substation

Demanded Load 12-30 MVA G-1


TAQA Power Technical Specifications

53. Medium Voltage Equipments:

Transformers:

Oil immersed Type transformers:


- Maximum loading factor shouldn't exceed 80% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076

- Technical specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method ONAN
Maximum temperature rise 45/55 K
Buchholz Relay Available
Mercury Thermometer Available
Bidirectional rollers Available
Earthing Terminal Available

Dry Type transformers:


- Maximum loading factor shouldn't exceed 95% of transformer total capacity.
- Transformer should be of low losses type.
- Transformers should be manufactured in accordance with on IEC 60076
- Technical Specifications:

Rated primary voltage 22 KV


Rated Secondary Voltage at no load 400 V
Tapping ( off load tap changer on MV side) +2 2.5% - 4 2.5%
Frequency 50 Hz
Vector Group Dyn11
Maximum Ambient temperature 45°C
Cooling Method AN/AF
Insulation Class F/F
Maximum temperature rise 100/100 K
Climate/ Environment class/ Fire protection C2/ E2/ F1
Forced Cooling fans Available
Conductor Types AL or CU
Bidirectional rollers Available
Enclosure IP 00
Earthing Terminal Available

Demanded Load 12-30 MVA G-2


TAQA Power Technical Specifications

Approved Manufacturers
 ABB / Schneider / El Sewedy / Eltas / Al Maco / EgyTrafo

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

54. Ring Main Units:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Type SF6
Bus bar rating 630 A
Rated short circuit current 20 KA/ 1 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz

Incoming Cells:

Number of Cells 2
Type SF6 LBS
Earthing switch Available
Number of ELI 1
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Measuring Cells:

Voltmeters 0-24 KV
Potential transformer

Burden: (500-100) VA CL: 0.5

Demanded Load 12-30 MVA G-3


TAQA Power Technical Specifications

Current Transformer X/5, Ith= 20KA


CL: 0.5 Burden: 10 VA
3 Ammeters (0-x) A
Voltmeter Selector Switch Available

Outgoing Cell

Outgoing Cell 630 ASF6 CB


Earthing Switch
Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Approved Manufacturers
 ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

55. Switch Gear:

General Specifications:

Rated voltage 24 KV
Service Voltage 22 KV
Bus bar rating 1250 A
Rated short circuit current 25 KA/ 3 Sec
Peak withstand Voltage 50 KV RMS (1 min)
Installation Indoor
Protection Degree IP 4x
Rated Frequency 50 Hz
Ambient Temperature 40°C
110 VAC from PT
Control Voltage 110 VDC from
battery charger

Demanded Load 12-30 MVA G-4


TAQA Power Technical Specifications

Incoming Cells:

Number Of Cells 4
Circuit Breaker type 1250 A
SF6 / Vacuum CB
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 22- Non Directional Earth Fault, over current.
23- Directional earth fault, over current
24- Short Circuit
25- Over, Under Voltage.
26- Three Phase inrush current detection.
27- Negative sequence over current.
28- Thermal Overload.
29- Circuit breaker failure.
Potential transformer

Burden: (500-100) VA CL: 0.5


Current Transformer X/5/5, Ith= 25 KA
CL: 0.5 , CL: 5P10
Voltmeter 0-24 KV
3 Ammeters (0-x) A
Power Meter (KWH, KVARH, KW, KVAR, PF) Available
Voltmeter Selector Switch Available
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
AC / DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Outgoing Cells:

Demanded Load 12-30 MVA G-5


TAQA Power Technical Specifications

Number Of Cells 2 or more


Circuit Breaker Type 630 A
SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch Available
Protection relay 19- Non Directional Earth Fault, over current.
20- Short Circuit
21- Three Phase inrush current detection.
22- Negative sequence over current.
23- Thermal Overload.
24- Circuit breaker failure.
Current Transformer X/5/5, Ith= 20KA
CL: 0.5, 5P10
3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available

Bus Coupler Cell:


Circuit Breaker Type 1250 A
SF6 / Vacuum
Circuit Breaker - Spring charging motor 110 VAC
- Shunt Closing Coil 110 VAC
- Shunt Tripping Coil 110 VDC
- Rated Voltage 24 KV
- Rated Current 1250 A
- Breaking Capacity 25 KA.
Earthing Switch
Available
Protection relay 19- Non Directional Earth Fault, over current.
20- Short Circuit
21- Three Phase inrush current detection.
22- Negative sequence over current.
23- Thermal Overload.
24- Circuit breaker failure.
Demanded Load 12-30 MVA G-6
TAQA Power Technical Specifications

Current Transformer X/5/5, Ith= 25KA


CL: 0.5 , 5P10
3 Ammeters (0-x) A
On / Off / Fault Reset Push buttons Available
On / Off / Fault Indicator/ SF6 leakage indicator Lamps Available
CB / ES position indicator Available
DC loss Flag Available
Space heater with a hygrostat in each cell 200 W
Capacitive divider (24 KV) with HV presence led indicators Available
AC/DC horn Available

56. Low Voltage Equipments


- A main LVP should be installed equipped with
 Air CB with ratings = 1.25*Rated Transformer current at low voltage side.
- A diesel generator with low voltage ATS (2 out of 1) operation may be installed for
emergency and important loads.
- ATS installed should be of switched non overlapping neutral type.
- Power factor correction panel is required to be installed for maintaining a 0.9 PF
(minimum) according to the load type.

Approved Manufacturers
ABB / Schneider / EMAS / TEPCO

Other suppliers may be approved if their products are in accordance with the previous
mentioned specifications and submitting required type test certificates for their products.

57. Earthing system


- A separate earthing system is required for both MV and LV equipments with
maximum earthing resistance 3 ohms.
- The approval for the proposed earthing system shall be approved after commissioning
where the measured resistance should achieve the desired values.
- Test link is required to be in an accessible place outside cable trenches.
- Attached a drawing showing earthing network design require by Taqa Power
Company.

Demanded Load 12-30 MVA G-7


TAQA Power Technical Specifications

58. Electrical Room Details

Room dimensions , structure and location:


- A substation room is required to be built by the dimensions and structure shown in
the attached drawings for all Scenarios.
- The room doors should be on a main street with adequate space in front of it for
facilitating installation and removal of any of the equipments.
- For electrical substation rooms inside commercial buildings is required to be easily
accessible by a fork lift required for installing or removal of any equipments by
during operation for maintenance purposes.
- A ramp is required in front of the door if it's not at the same level of the road.

MV and LV cables requirements:


- Incoming / outgoing MV cables should be through a 8'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- Incoming / outgoing LV cables should be through a 6'' PVC pipes filled with foam
after cable installations leaving 25% spare pipes.
- MV cables used inside the room should be unarmored type.
- An exhaust fan is required to be installed in the transformer room to be operated by
either thermostat or 24 hours timer.
- Transformer MV cables should rise on a steel ladder to avoid exerting any mechanical
stresses on the bushings.

Approved Manufactures:
El Sewedy, AL Alamaia, Al Masryia, Al Giza, Energya, BICC.

Room Finishing:

Roof:
- Proper water isolation membrane should be installed above the room roof with
suitable drainage pipes to avoid any water accumulation.
- Roof is to be covered with proper tiles.

Floor
- 20 cm of helicopter concrete.

Walls
- Waterborne paints are to be used for room walls.
- All wall holes should be filled with spray foam (PVC pipes, Cable entries, RMU
cable entries and SWG cable entries).
- Steel grill covered louver is required to be installed at all room sides.

Demanded Load 12-30 MVA G-8


TAQA Power Technical Specifications

Electrical
- 220V, 16A output Sockets is required to be available in all the electrical rooms (2
sockets in each room).
- Exhaust fan is required to be installed in TR, SWG room for proper ventilation.
- A 24 hour timer or a thermostat is required for exhaust fan operation.
- Adequate emergency lamps equipped with batteries are to be installed in each
electrical room.
- Attached a drawing for power layout of electrical rooms.

Door
- The Door should have a louver for room ventilations covered with a steel grill.
- Door height is required to be not less than 3m
- Door should be aligned with the room floor.
- A door should have a steel locker.

59. Fire Fighting System:

RMU:
- Fire search system (CO2) – Capacity 6Kg. (1).
- Portable fire extinguisher, dry chemical power, capacity 12 Kg, Qty.(1)

Transformer:
- Ceiling mounted, self-actuated, stored pressure, dry chemical powder, multi-
purpose fire extinguisher – Capacity 12 Kg, Qty. (1).
- Portable fire extinguisher, dry chemical powder, capacity 12 Kg, Qty.(1)

LV Panel:
- Portable fire extinguisher, Dry Chemical Powder, capacity 12 Kg, Qty. (1).

Switch Gear
- Distributor Cells:
Fire search system – CO2 – equipped with fire alarm system (visual and sound).

Distributor room:
 Portable Dry Powder fire extinguisher – 12 Kg, Qty (6).
 CO2 fire extinguisher – 6 Kg, Qty (3).
 First Aid Kit (24 Persons)
 Illuminated Exit lights
 Emergency lights, Qty (8).
 Safety Signs (Warning – Mandatory – Prohibition).

Demanded Load 12-30 MVA G-9


TAQA Power Technical Specifications

60. General Requirements:


- All shop drawings for MV equipment are required to be approved before
manufacturing.
- All factory acceptance test (FAT) is required to be attended by one of our
representatives.
- Taqa company site representatives should be informed by the schedule of work for
their supervision.
- Equipment imported from other countries are required to be tested either in the
manufacturing country or in any other factories in Egypt if available.

Demanded Load 12-30 MVA G-10


E E E
To Circyuit Breaker
Trip Coil

2.0

E
Buckloz relay
DB OR
Fan Control Unit

Exhaust
Fan

Exhaust
Fan

2.0

E E

2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


10-30 MVA Eng. Mohamed Hassan Adress:
Substation Lighting & Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp
Power Layout Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 4/6/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-8-12-1D


25.0 3.0

TR
Room -
4.0

3.0

7.0

Battery 3.0

Charger
Room

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


10-30 MVA Eng. Mohamed Hassan Adress:
Substation Front & Side Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp
View Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 4/6/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-12-22-1B


25.0
3.0

Feeds from Substation TR


Steel ladder

Steel structure

J1 J2 J3 J4 J5 J6 J7 J8 J9 J10 J11 J12 J13 J14 J15 J16 2.0 4.0

Outgoing1 Outgoing 2 Outgoing 3 Outgoing 4 Incoming 1 Incoming 2 Bus Coupler Bus Riser Incoming 3 Incoming 4 Outgoing 5 Outgoing 6 Outgoing 7 Outgoing 8 Outgoing 9 Outgoing 10

7.0

PVC 8 inch

Battery
2.0
Charger 3.0

Room

2.5

Project: Sheet Title: Designed By: Owner:

Eng. Samy Abdel Malak TaqaPower Arabia


10-30 MVA Eng. Mohamed Hassan Adress:
Substation Equipments Layout Eng.Mohamed khaled 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp
Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 30/5/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-12-22-1A


TR

22 KV Cable Sheath
J1 J2 J3 J4 J5 J6 J7 J8 J9 J10 J11 J12 J13 J14 J15 J16 2.0

Outgoing1 Outgoing 2 Outgoing 3 Outgoing 4 Incoming 1 Incoming 2 Bus Coupler Bus Riser Incoming 3 Incoming 4 Outgoing 5 Outgoing 6 Outgoing 7 Outgoing 8 Outgoing 9 Outgoing 10

22 KV Cable Sheath
2 2 Frame point
2 Frame point
TR
SWG

Battery
2.0
Charger
Room

3
2.0

1 1

Project: Sheet Title: Designed By: Key Owner:


1- 120 mm2 , Bar Copper conductorTaqaPower Arabia
Eng. Samy Abdel Malak
10-30MVA Eng. Mohamed Hassan
2- 50mm2, Copper Conductor PVC
Adress:
insulated
Substation Earthing Layout Eng.Mohamed khaled 3- 10mm2, Copper Conductor PVC 57 Cornish El Nile El Maadi-Cairo- Egypt
C:\Users\Mhassan.TAQAPOWER\Desktop\TAQA Power Logo.bmp
insulated Tel: +202-25260900

Fax: +202-25260911
Rev: 00
Date: 4/6/2013 website: www.taqa.com.eg

Dwg. No: STD/GLB/DO-12-22-1C

You might also like