UNIT-4/ DETAILED ESTIMATE Deriving detailed quantity estimates for various items of work of a building. Like earthwork excav n, brick work, plain cement concrete, Reinforced cement concrete works, wood work, iron works, plastering, painting, flooring, weathering course for a single storied building. DETAILED ESTIMATE ‘A detailed estimate provides schedule of all the possible items and an amount which is very near to the final amount of the structure and the above is prepared for the following two purpose. a. Execution process, b. Obtaining technical sanction “The whole project is subdivided into various stages, the stages broken up into various items of wark having same specifications and rates. ‘The detailed estimate comprises the cost as follows: 1. Total cost of various items of work 2. Allowance of the contingencies to accommodate unforeseen expenditure on missed items, variation in quality and or rate in different items. 3, Establishment charges for supervision. 4. Estimated amount for the service charges like water supply, drainage, sanitary arrangement and, electrical installation. 5, Miscellaneous expense, prime cost, provisional sum, etc. ‘The detailed estimate is comprised of: 1) General report 2). Specifications 3) Detailed drawings showing plans, elevation, sections, key plan, drainage layout, electrical drawings, structural drawings, etc. 4) Design data and calculations and 5) Basic rates adopted in rate analysis, etc. To prepare detailed estimate, the Unit-quantity method Is adopted. ‘Standard Measurement form TTEMNO. | DESCRIPTION | NO. LENGTH | BREADTH | HEIGHTOR | QUANTITY | TOTAL ‘oF WORK DEPTH Second part of detailed estimate includes abstract of Estimated cost. This estimated cost is increased by 59 for any unforeseen expenditure which is called Contingencies. Other additional expenses ike water charges, contractor prof, insurance charges, purchase of tools and equipments for big projects, ete are also calculated and added for arriving at final estimated cost. ABSTRACT OF AN ESTIMATE TEM DESCRIPTION | QUANTITY ‘UNITRATE | UNITOFRATE | AMOUNT The main functions of an abstract of an estimate: 1. The total estimated cost of the project is known. sms of the work are known. 2. The various it 3. Creates a part of the tender document. 4, Itis the basis of which percentage tenders are called after excluding the amounts of contingencies. 5, The bills of work done are also prepared on the basis of abstract of estimate. 6. Comparative cost of different items of works can also be known. 7. The nomenclature of item provides concise description of the nature of the work, name of the ‘materials & quantities, workmanship, period of curing, consideration of land & lift, scaffolding, shuttering, dewatering operation including all transport, tools and plants. 8. Generally items of estimate is arranged to the progress of construction work. Sequence of items may be: 1. Earth work. P 2. Brickwork or RCC work in foundation & plinth. 3. Damp-proof course. 4, Brickworkin superstructure. 5, RCC work in superstructure including centering & steel reinforcement. 6. Woodwork for doors, windows & ventilators. 7. Structural steel works & grill work, 8. Paving & floor finish 9, Plastering (internal, external & ceiling) 10. Terracing (weathering course and water proofing — flat tiles) 11. Painting & colour washing (Doors, windows, ventilators, grills and cemented surfaces) 12, Water supply and sanitation 13, Electrification 14. Miscellaneous (Overhead tank, sump, elevation finishes, platform, septic tank, compound wall gate, etc) Important factors for detailed estimate: 1. Availability of local labour 2. Availability of materials 3. Location of site 4, Transportation of materials, 5. Quantity of materials 23 Estimation and Costing ) Long wall- Short Method | Paticularsofftems| No] L | B| H | Q _ |Exphnation 1. |Earth Work exeavatjon fo fouaion a) Long walls 2| 62} 0.9] 1.4| 15.264] Las3+4s+45-62 D=03+05106=14 1b) Short walls 2| 3.4/0.9) 14 T-43.045-045=34 2 Total mi 62|0.9|03 3.4|0.9/03 Totall o.6jos | 3.54 |L=53103+0359 2] 37}o6los | 2.22 |t=130303=37 Total] $.76 |m> 29 Estimation and Costing Abstract estimate of single roomed building (load bearing structure) Description of item Earth workexcaation Cement conerete(1:4:8) RR masonry inC.M.(L:5) Sand filling in basement Brick masonry in country bricks of standard size in cM(L:8) RCC. (1:2:4) for lintels, beams ete, R.C.C.0:2:4) for slabs, ‘Cement concrete (1:5:10) for flooring Supplyingand fixing of country wood for doors. CHAPTER—V ESTIMATE OF BUILDINGS z BUILDING-1. DETAILED ESTIMATE OF A SINGLE ROOMED BUILDING. Prepare a'complete detailed estimate of the cost of construction of the Magazine shown. the fig. 5-1, on the bass of present market rates. From the total amount arrived. at on led estimate find out plinth area rate of the building Geuera specications : ‘Brickwork shall be 1s. class with cement mortar (1: 4). Foundation concrete shall be cement with brick chips (1: 3:6 ). Wood work for frames shall be of ealvood and shulters Indian teak. Frame for wooden door shall be of sal wood. 10cmx cin and. shutlet ‘Of _ class Indian teak 25mm thick, Steel door shall be with integrated gis ‘with 128 mm, ck M.S. sheet. All walls shail be three eouts white’ washed. Doors shall be. pafated hwo coats. R. C, works are 1% reinforced TOR steel. 2 nos. 75 ma. dia tie water uts shall be provided. Other specifications shall be followed as mentioned in the drawing, Centre ine method :— [Loog ad Short wall method m of centre lines Centre to centre distance— t-+ 30m) +(3'6m-+-30m) Long walls=4m-+30m=430m Short walls=3'6m+'30m-+=3'90m, DETAILS OF MEASUREMENT AND QUANTITIES (Bildog-1) Description of tem [No U25t Break eles a Explanatory notes Earthwork in excavation (@) Foundation trenches Centreline method ..) 1} 164! 70 | -s0 La S wall method ‘Long walls 2} so} 0 $0=6342%-70)2 Short walls wf 2]_32 | 70 3253925 -70/2 1032 0:09 | 759-15 (trench) TT (b) Steps Total ‘Earthwork in Sling “oundation trenches Wation fappeax [= 208 (@) Foundation trenche pres O Peniae % 313 | som 3020 eae T927 | (L.C. and soling) Cement concrete (1:3:6) |} (@) Fouidatioa trenches Centre line method E@ S wall method 164] 70 | -30 Long walls 2] sa} 70 | 3 ote thatthe total Short walls peer 9 ae dength fs same by T] 18a [7 |] 344 | ony methd (©) Steps TY ra [90 | -i0 |_on Total (=| 355 | cum “any: enn en ei Bare elt tle Gy Ge soe cr oem seen, ae | fea Eaad SECTION ON AAA Fever i wehbe eauear coneaaie erent be ditty MOHAMED SATHAK A. (OF ARCHITECTURE ne ACADEMY LD accession Ho. AA fae UBRARY iy ESTIMATING, COSTING, SPECIFICATION AND VALUATION ee TC aHTaT ant Eee Len] Desition of tem ‘Breadth Heil ovanig] Explanatory nots 7 Rewari sem] Titriomndcior ph Teale ant 40 | v40 C5 rt med — 40 | v0 Pome 40 | 140] 918 “60 60 | 0-43 | “60=4(-904-30) (av) | Total |= 96r 5, | 25cm thick D.P.C, ey , 0 492 EUS ne net +0 3 50 Lear : ; Pilot «1 | x0 eet 2 x eg=430+2x030/2 Hf ; som finan 3088/2 laneetigacteab | 2 ass Shotsizatateb) | 2 2 48 fi dtusn fr neton ie te desea i a» | 21 Jossenlmame te ede : 2% bebe a ee rar} one les Nader : “a 299 4 904 larg otitis en 8, 904 pasate Shattering and centering 1 a0 2496. io deduction the ar I - ta) jaesemontens ‘ } S re 2 a] °| 2 coe oe {Dem ieee me be ined peor ve, 380 1596 been considered as 1 oo eee Iter] No. ESTIMATE OF BUILDINGS ais FMmay Explanatory no 0. nh 2 4, 15, 16. ‘Sem Bem vent holes Sal woodwork in door Battened door 25mm ick ‘Steel grated door Tor steel for RCC. ‘MS, elamps 50mm x 6mm ‘2mm thick cement plaster a9 (2) Inside—Long sides @ from GL. to P-L. Gi From P.L, to above including parapet ower 3Nes. “0528, 2108 qm 232 qm 191 quin. kg 24-80 2232 66m201412) L07=12—2% 00 42-015 (for rb Wt of leu m of Tor bar=78'5 q 4740420304: 8580405 (off (No plastering ins GL, as the out ground should be resed during fl of earth in trench, 29='30—"10 (10 terracing). For both faces, de tion ie for one sd 6 ram thick cement plaster (b) Cornice both faces Long sides (©) Comoe edges ong es 10 cm thick time concrete 1: 7) flor over brick (214) flooring "White washing three coats ‘Painting to woodwork Door abd its frame Painting to steel door ‘Coal tarring two coats to back of frames ‘5-ram dla, Rainwater am 1365 m 186 an 655 sqm 655 am 66 qm ‘STRICT OF ESTIMATED COST OF BUILDING -1 ‘escipion of tem Ras | Carol Rs.P. Rate ator in exeavation Erik in filing Cement concrete (1.36) in foundation Briclowor (14) in foundation & plinth 2.5m thick damp ~ proof couse (1 “4167.00 "2600.00 2026.00 2308.00 12100 sam Foal CO.= Re TOOT Descipion of em Brickwork (1:8) in superstuctre .| REC. work (12:4) excluding enforcement snd shutering with stone chips. (60— (304-90) ire and labored charges for shutering and 10cm thick (e) Fre tracing (2:27) 15emx Bem vent hole ‘Sal wood werk for door fame 25 mm ick Indian salwoad Z-batened door ‘Stel grated door with integrated ills and 1.25 mm hick M.S shee MS clamps (40x 6mm 250 0 350 mm 15 mm thick cement plaster (1:6) 10 mm thick coment laste ( 40mm thick omen: plaster (1). 10mm thick ime concrete (1442: 7)oor over abc flat sling Mulplying factor for each side=1"3 times clon frame (SP: 25 emihickatficial stove Nooring (1:24) finshed wih nest cement | White washing thes coats Painting to wood ork 2 coats (with synthetic enara pint except white) | Painting to steel gated door 2coats (with 66 asin item (11) CCoalsaring to coats 115 man dia (externa)}CI rai water spouts Add 59% for contingency "A236 for WiC Ping area = 4:10 x 430-2021 sqm ‘Plinth area ae = 276Q0L05 =Re. 1365665Psqm- = Rs, 1268.74 a 4 lil ESTIMATING, COSTING, SPECIFICATION AND VALUATION Some 90mm + Mom Lie. (2:2:7) over [String Course ie REC. Sab gi 60pm Ten Re Band tinted av ny mp LC. over Bu SEGTIONAL ELEVATION ON ABCD i7y poeg- ‘Schedule Door + D= 12M x 21M FRAME oem x 8.0em wninow + We 1M x 15M FRAME oem €.0em SHELE S= LM x 15m diem Been = Tha PILLAR 3 Scot esd ~ 200m Si, tise ven PLAN po sf] FIG. $2 Lime Cone Beet SECTION oN PQ ”-e-- oe eee oe ESTIMATE OF BUILDINGS ‘BUILDING ~2 DETAILED ESTIMATE OF A TWO ROOMED BUILDING WITH FRONT VERANDAH Prepare a detailed estimate of a building from the given plan and cross section as in the fg. 5:2. Adopt the local P..W. D. current schedule of rates and compare the « ferent portions as grouped below on percentage basis. (The estimate has been prepa ‘Long Short wall and centre line methods separately) General Specifetions— (2)_ Foundation and plinth :—First class brickwork in cement mortar ( 1:4) ove ‘coneret (18:36:100), (0). Soperstructure walls :—First clas brickwork in cement mortar (I:6) over 2 thide D. P. C. (1:24) and parapet walls shall be of cement mortar (1:4). Tn’ superstr Sem thick R.C.C. (1:2:4) band lintel shall be provided. (€)_ Roofing :—The roof shall be 10 om thick R. C.C. slab with stone 10 em (av,) lime teeracing (2:27). The RC. slabs end beam shall be 1° < @_ AMR. C.C. works except roofing shall de 08% reinforced, (©) Flooring :—Shall be 25 mm thick astifcial stone with cement concrete (1i2:4) stone chips finished with neat cement finishing at top. Under flooring shall be 73 cm linie concrete (15:2:7) terracing over a brik fiat soling. (O) Finishing ;—Ovtside walls up to plinth including plinth offet shall be 20 mm cement plaster finished smooth with neat cement. Inside and outside walls shall be ‘coment plastered (1:6), R, C. lab and ceiling 6mm cement plastered (1:4). Inside three coats white washed and outside two conts colour washed over a coat of white wast (@) Doors and windows Frames shall be of Sal wood, shutters of Tndian teak 35mm thick Indian teak wood panelled type design and shall be painted with two coats priming coat. Back of door and window frames shall be painted with two costs of co ‘Window gratings shall be 16 mm dia. M.S. bar with 40 mm» 16 mm intermediate calor 4 1M, S. plate and M.S. clamps for frames SOmmx 6mm flat 40cm long. ron works sh painted two coats, Tang and Shorewall metho Gane tine rctbod == Cad ors abel Calculation of entre fine v. Fot main outer wal a) | HES 304442% 8)40642x. Back and front walls of rooms. (com! Walls=(454-4'04°30)+2% $=9'1m (2 nos.) a Partition and sides of rooms as short wall ae Totaln2 =36-42x 8 =350m ( nos Seon) [Note that the numberof joins is ¢ ‘Verandah front long wall For verandah wall (45+.30+5042530)—25-2 =9-20m(Ina)| Fromt—(4-54304442%°30)~24"5 Sides=2(1'60-+99+ 2), Verandah sis, short walls (1604-394 2) 1-850 ‘Numbers of joints are two with main Description 6t items Explanatory notes Description of items uantty | Explanatory notes Farhvork Ta exeavation (@) For foundation trenches ‘Long-short wall method—| en ides Short walls Contre fine method — Main walls Verandah walls () Steps ‘arthwork in filling (2) Foundation trenches (b) Pt ot rogm of Verandah Lime Coverete in foundation () For walls— Long-Short wall method— Rooms, Long walls wShort walls, Verandah front Long wall APN sides Short walls = Contre line method — ‘Main walls (b) Steps Ist, Class brickwork (1:4) in foundation and plinth (a) Walls Long-Short-wall method— Rooms—Long walls Ist footing 2nd. footing Piatt wall Short walls — 1st, Footing a 2nd. footing lineh wall a venan Nats ' KegnerLongwals | 2 |10.00] 90 | -90 *shonwalls, 3 | 300] 90 | 90 fr-L]3509|—s0-] 30 Verandah front Long wall. i | 3.9] 2 “30 270 360 950 330 340 350 “Foarot 30 70, ‘Foil of 00, Tort ot 0 50 40 60 50 40 100025142" 3:00=390—2%" 105 =1.85- BP 2900=29'90—2: 12°00=12:90=2x° 80a (104 }C3)—"¥ 35063.0—10 440=450—10 “43 60-10(¢oling)— na Sa HEY, 3 ass0-3: ees o. Verandah front, Long wall "st. footing Plinth wall ‘Verandah sides Short walls ist, footing t Plinth wall (Lower part) Plinth wall (upper part) Centre line method Main wall ‘Ist footing 2nd. Tooting Plinth walt Verandah walls— Ist footing (8) Steps 2-Sem thick D. P. C41:2:4) TLong-short wall method ‘Long walls short walls of Pillars Centre tine method — ‘Main walls Pillars Dect for Ist, Class brickwork (1:6) in superstructure walls Longsshort wall method Rooms, Long walls ener Shore walls Verandah over lintel— Front, Long. walls ‘Sides, Short walls Pillars 2930=2990-2 2 29.40=2990-2% 12:30=12 99-25 12-40=1290—2% 2 1250= 1290-25 (ve) 940—_9 2042 @ bepstas—4—P ESTIMATE OF BUILDINGS ha ESTIMATING, COSTING, SPECIFICATION AND VALUATION ) - 2 Lem! Description of items _|No, |Uenstt] Breadth Height, satity| Explanatory n ke ton of tems o. RB Bradth uch ouantiy] Expabiory noes No. ml mim [m Ds Eaplanatony ine 10. | “Tor steel bars aoe | Cone Te mel centting. hooking, bending Mein walls 1 -30| 360| 3197| 2960 same as D.C. nd binding fotiem a0. 8 |) 08 % vt aa ‘Abore pillars } Ba] 90) 221 | 1eeoei290 ox For item | nos. Pilate 4 %) braal fete SBb0d 242 Deductions for— | 100 | ‘Door openings D 3] 120] 30 01506) nf We. of feu mo Window openings W ...| | 110 30 Feu m= 186-7 kg} steel=7850 kg. RC. band lintel for— = 879 | Clear area, ‘Main walls 260] 30] 1s} 433) 29:60 isthe total Jen 11, | 10em ar, thick tie terracing so | [side Verandah tha} 20) 1S) ¢38 | otsupentroctare sam | 9:20—4°504.60 Shelves opening +10|__20| 15] o.03.| Crem mick. ; +220 a deietio [7.78 | Ne dedcton fox 12|satvoodwontortame || | dL og | ayy ala Feat | ends of intel: @) Doors 4 Door frames ar [Set pea any. metic} = 7681 | ‘endo ine (b) Windows | 520 | +10 | -08-] 333. outs. 2 verts wi 7, | 10 cm tick brlekmork - insertion in foo (is) parapet Patan Sides Sort of 2] 00) — 6 00=3:6042%:30 13, | asm thick Indian tes ' Shoa2hi04 Backandffont Long | 2) 940) — 160-420 ‘ood panel abutters $40—4504-40044'90 ing all tings To=604-10(L.C) {@) Doors of 3[ ror] — | 203 | 6527 | rormr2—z9-0 8 | Cement concrete (12:9 Insertions of LG, are me) #23018 ( eetuding reinforcement counted with brickwork, () Windows wf 8] 97] — [137 [1063 _| 20322108, and shuttering Total |= TT 1S | bottom sill) +°01 Ror tincel (oand)— ‘sq m_ | (bottom openin Main wal -| 1|2960] 30} 1s] 1-33} 2960 he tort Stetton ds wot SY 1]is60] 20] 1s] “at | Length of mat wall 14] ang etn for— x15 or eka (2) Window gratings 16mm Windows 6| 130 (07=4(-054-09) © Fes Beem ele foxes} 150 [a 158 safeme| i708 ‘Verandah front 1] 1030 103092 ofe4-20 6540s 12 mum tener plas ‘Verandah sides 2| Fé $b Providingholss so} €|-94 [9 38 kgliem= | 2958 (©) Roofig slab i] 9:40 to fangs Bion nt Web of beams 2| 420 420364230 jong end bifurcated r (oearngs) "For Doors eis nos. | Windos —fRsealn32 aos 9, | Hite and labour charges 15, rama thiek cement plaster i for centering and shuttering (taal soot wk @) For inte (band)— ‘cement pur Main wal ouside 1 |2120 EP plik wall om t5em 1/3140 3140216546) below Gt. neuding 1/330 4214795) olset Verandah inside 1/1075 T0594 42% 195 1 Back and a os] — } 20] 1520 | somedq1sy () Chaljas bottom ifort) = 2170s the total ent ‘Sides 610} — | -80| 976 Edges front 1240} = mex a0 : (©) Sip Béges window sides" f6se --45 | FBae ‘Treads a4] 30 | — | 246 Edges verandah sides <2) 2] 43) — Sides 60] — | 75) “90 | verandan otter (©) Rociing sab— Dedaetion for offets () fas been incl Bigger room 1 of verandah 141320) Os | ‘66 _| in Aoor finishing Smale oom Tora SIEOT Min at 6) on walls: (a) Inside - (i) Rooms Long sides Short sides amb sills and soffit of sett i) Verandah Room side up to verandah opening Room side above openings Verandah front above openings Verandah sides above openings ii) Pillars - Top postions of openings Gicsoffis) Frot Sides Deduction for opening having ivaca wba “i Doors Windows (b) Outside Entire back 3 ides of room Verandah front Verandah sides " Parapet outside — Back and front ides arapet inside, — Back and front a ides a fop, back and froat sides Deduction for openings Dutside windows = ring courseS0 mm projection 14100 mm depth 12 mn ick plastered (1:4) tack and front ides Toval 9.50 6.00 = | 26 = | 130 3240 Sus 104 Total |) = | 30 = | 370 = | 100, = | 1.00) = | 070 = 070 060 0.00 = | 010 = | 010 = [1.50] $20=2(0.1+15) 8.40=9.40-5 0.20 For both faces deduct ‘one side, Deduction for other ‘openings have been. ‘considered from out side plas 3.10=360+010 (RC. r00f) 0.70=0.60+0.0 (ime conereie) 9.40 is outer to ‘outer length qm sqm 19.00= oat to out metre jotcd ptivg \ BL uh oy for Now 4. | Gmm thick cement plaster — | Sam é as shuterng| area e clad] (1s) tO RCC. works int elitem | Nos.9] (6)+ 90) (Excluding line) including 1453 Foupheningconrete suace ‘Top of caja ~ | 1 fara] = | o4s'| 977 Toa] = | $40 }sq m 1/75 eke concrete 2:7) floring over a ayer of Brick lat 7, Rooms bigger ~ | 1 ] 440] 350) - 1540 Jaso=ss0-2 + smaller = | a | 390] 340] — | 1365 Joos (risers) Verandah 1 | 870 [150] = | 130s }a70=9.50 (outers FToial] =] 4210 fouter)-2x0.40 sam 25 mm thick artificial stone (12:4) flooring Room bigger ~ | 1 | aso} seo] - | 1620 < smaller 1 | 400} 360) — | 140 Verandah 1 | 950] 135] — | 1738 |195=160+020+00 Deduction for pillars 5 | 020| 020] ~ Jo2biae) Total |= | 4798 |sqm 21, | White washing three coats to | Same asite-m nos] 16(0)| (18) = outside and eeling 16596 |sam 2, | Two cots colour wash over a + ote) -H60.08 [54m coat of white wash 23 | Painting to woodwork wo coat bohsides (Doors (Paneted) — | 32 | 120] — | 210 | 1966 | According 015-1984 30 aukipyiag factor (Windows(*) | 82] 30 | — | 150 | 3452 [foreach side 13 x130| [Total] = 75398 times the area of sqm_| opening including fame. Coal tarring two coats to back of (@)Door frames. | 3 | 548 os] — | 104 © Window * = | 8 | s20{ oa] — | 41 Total] =] S80-|sqm 25. | Painting to iron works Windows Gratings... | st | 094] — | 134 1008 Joos-=1.10-20.08 sqm | Multiplying fctoris 26, | 75 emdia. Cd. rain 1.0 or palating all over. ‘water spouts paating complete + |os} - |= | 36 rm us ESTIMATING COSTING, SPECIFICATION AND VALUATION ABSTRACT OF ESTIMATED COST OF BUILDING -2 Tem Ne Desription of em ee Uae Rate Rs.P. 1, Earthwork in excavation of foundation wenched in ‘ny kind of ol ineluding trimming the side of trenches, leveling, Dressing and ramming the bottom, and bailing out normal seepage of water ruin water ete. depth of excavation not exceeding 1.5 meters snd without shoring. Earthwork in filing in foundation trenches Or plinth including watering and ramming f 13 em Fryers ete. with earth obiined from exeavaton Lime coerete wit stone lime, utki and over ‘burnt brick ballast, Shama metal(18:36:100) in foundstion and pith. elas brik wark in cement mortar (1:4) In foundation and plinth 2,5 em thick Damp-proof course with stone Chips 10m om (1:24) with approved Cement waterproofing compound. 1 cass brickwork in cement mortar (1:6) ia Supetstrcture, including cost of scaffolding Ground Noor. 1c thik brickwork in cement mortar (1:4) la fit floor CCetnent concrete (1:24) with graded stone Chips (20mm down) excluding shuttering and Reinforeement in ground floor Hine and labors charges for providing stout Props, centering ad shuttering (upto 4m Staging) with hard wood at lest 2.5 cm thick. “Torstel reinforcement including cutting, hocking, tending and binding with 16 gauge Black anealed wire as per drawing up to and Including ground floor root. Tem eveape thik Kime teracing with laked Lime (2:2:7) lai 0 proper slope, thoroughly Beaten and cured, including top finishing Sal woodwork in door end window frames Five and fixed complete. 35 mm thick Indian Teakwood pane! shutters of doors and windows 2s per design including filings, ited and fixed she same in position MS. work in framed gratings of windows made ‘found bars with intermediate fat bar stiffener tnd fixed with nocessory serews ee. complete 20min thick cement plaster (1:4) with cement Panning (185mm plaster and 1.5mm punning) Inching rounding of or chamfering comers As dtectod at prourd floor. CO. 336 2430 10.74 21.28 8.0 2681 21.56 37.02 437 saab 0.465 mas 249 28.02 Gm cmm sqm sqm cum sqm gum sqm sam com sqm ke sqm TTT 2600.00 1100.00 437756 325.00 211500 294.00 2929.00 145.00 320000 426.00 429180 3510.00 3800.00 99.00 cum Sam cum sqm cam Sqm qu. sqm cum sam Qu. sqm 9462.00 277398 769221.58 | 19 Deserption often No. Uait Rate | Univer Rae BF 16, | 15 mm thick cement plaster (1:6) to wall Inelin rounding off or charferng comers Directed and roughening of conerete surface, Including throating, nosing and drip course where necessary a ground flor. 17, | String course $0 mm projection and 100 mm depth, 12m thick plastered (1:4) ‘ram thick cernont plaster (sf) to R.C.C. work, Including roughening of concrete surface, rounding of or chamering comer as directed tnd throating nosing ete, where necessary st | ground floor. 19, | 75cm thick termced Rooring of fime concrete with stone ime, 118 and brick chips (1%2:7) vera layer of brick Mat solng of picked (over ‘bar brick and fling joins with loet sand 25 mm thick grey artificial stone Noor with ‘cement eonerete(1:2:4) with stone chips inching {mm thick skinning and smooth Finishing to 3 ‘mm thick at op made up with cement and roundi off comers in ground flor. 21, | White washing three coats including cleaning nd smoothing surface (5 pars of stone lime and [par of shall lime) "Two coats co Jour washing with pigment of any shade with a coat of white wash priming {cluding cleaning and smoothing surfice thoroughly to ouside surface Painting two coats woodwork with ready mixed best quality synthesic enamel paint of approved make and brand, including smoothing surface by sand peper. ‘Coal tating two coats to back of door end. Window frames. Painting to ste! orion surface to coats with superior quality aluminum paint of approved rae including smoothing surfaces by snd Paper. 77.3 emi Cl raiater spouts including fiting and Fixing in poston and painting Complete 2. 2 4. as 26, 31.00 $440 4598 47.98 16496 60.84 53.98 580 10.08 36 sqm metre Sqm sam sam sqm Sam sam 59.00 | sqm 49.00 59.00 181.00] sqm 131.00} sqm 690.00 | sqm 100000] sqm 600 | sqm 2000 | sam 377 | sam 13635 Tout Plinth area= 9.40 x 6= 56.40 sm lind Ares Rate =L136598.0 = Rs, 1883459 peroam S640 RE ITE8.77 pers Toul = A 5% fo contingen = ‘Note: Cement 4 4 bags per 100 sqm is required for 1.5 mm thick neat cement punning EOE

You might also like