Q. Question Actual Answer Candidate Answer Marks

1 Good transport system All of the above All of the above 1


benefits

2 Pavement roughness is Irregularities Irregularities 1


an indicator of

3 Study of Traffic surveys BOT _ Toll Based BOT _ Toll Based 1


and its analysis is
required for which type
of Contracts

4 For Computation of Bump Integrator Traffic Analysis Study 0


Vehicle Operating Costs Study
which test is used

5 Match the Instrument a-3,b-1,c-4,d-2 a-3,b-2,c-1,d-4 0


with their uses a.
Casagrande Apparatus
1. To find MDD/OMC b.
Proctor Test App. 2. To
find the compaction c.
Pycnometer 3. To find
Liquid Limit d. Core
cutter 4. Sp Gr. & Water
Absorption

6 Soils are compacted for Decrease Decrease compressibility 1


the following reasons compressibility under under Load and minimise
Load and minimise settlement
settlement

7 Clayey type of soil can LL > 50 & PI > 25 LL < 50 & PI < 25 0
be used for
Embankment filling if
Q. Question Actual Answer Candidate Answer Marks

8 As per Ministry of 100km radius of 100km radius of Thermal 1


Environment and Forest Thermal Plant Plant
guidelines for
flyash/Pondash as fill
material is manadtory
for embankment
construction if it is
available within

9 Bearing capacity of fill All of the above All of the above 1


subgrade soil can be
increased by

10 Acceptable tolerance for +/- 25mm +/- 22mm 0


Subgrade layer is

11 Moisture Content of 2% < OMC > 1% 1% < OMC < 2% 0


each Subbase Layer shall
be

12 Gradation of Sub Base Grading III & IV Grading III 0


Material selected for
Lower Sub Base shall
confirm to which
grading of Table 400.2 of
MoRTH

13 The capacity of each bin 15T 10T 0


of WMM plant is

14 If the thickness of WMM 200mm and 100mm 200mm and 100mm 1


to be laid is 300 mm
then it is to be laid in
two layers of thickness

15 Thickness of Kerb DBM + BC DBM + BC 1


required to be
embedded is equal to
thickness of
Q. Question Actual Answer Candidate Answer Marks

16 Primer used for Prime Cationic Bitumen Cationic Bitumen 1


Coat shall be Emulsion Emulsion

17 Rate of Spray of Tack 0.20 to 0.30 Kg/Sqm 0.20 to 0.30 Kg/Sqm 1


Coat over Asphalted
surface shall be

18 Primer used for Tack Either B] or C] Anionic Bitumen Emulsion 0


Coat shall be

19 Pavement Life cycle of Less Less 1


Asphalt mix designed
with Normal Paving
Grade Bitumen is
______ than when
designed with Modified
Bitumen as binder.

20 In order to improve the All Cyclone Dust 0


Anti Stripping properties
of Aggregates and
improving the anti
oxidant properties of
the asphalt mix
following is added

21 Minimum Bitumen 4.50% 5.00% 0


Content by % of Mix for
a DBM layer of 60mm
shall be

22 Blue smoke emerging Mix is too hot and Mix is too hot and needs 1
out of asphalt mix needs to reprocessed to reprocessed
indicates that the

23 Nominal size of 26.5mm & 19mm 19mm & 26.5mm 0


Aggregate for 50mm
thick DBM & BC layer is
Q. Question Actual Answer Candidate Answer Marks

24 Use of excess bitumen in Bleeding Bleeding 1


a mix results in failure
called

25 Pot holes are a result of TRUE TRUE 1


continuous
deterioration of cracks,
ruts, upheavals,
bleeding etc