Fiber Laying from Networks Racks To Existing Rack(ODF/Exisiting Racks Storage/Switches Complete
Cutover of Network Switches Successfully/Four Cards of 10G Installed in Network Rack1/Four Cards of 10G
Installed in Network Rack2/Dorado Storage installed in the assigned storage racks + DAE /Fiber Complete
connectivity of Network Switches
Tonight activity
Rack 9 and 11 installed.
Rack 9,11 power on.
Layed and connected FE cables from Rack 8 to Network Rack 2 + dressing.
Labeling of all the Active and Backup power cables. Complete
Storage Rack to R6
Storage Rack to R4
Storage Rack toR5
Rack 7 to Rack4
Rack 7 to Rack6 Complete
Rack8 to Rack4
Rack 8 to Rack 6
Fiber are laid and Connected
08 SAN Switches Installed(Rectified)/PoweredOn and Connectivity{PVC Pipe Untied)
Rack12 is properly Installed
KVM installed in 04 Racks
Fiber laid b/w
Rack 3 to rack 9
Rack 6 to rack 9 Complete
Rack 4 to rack 7
Rack 4 to rack 8
Rack 6 to rack 7
Rack 6 to rack 8
Rack 10 to N1
Fiber Plan(Laid)
Server Racks/Network Racks(R11 to N1/N2)(R12 to N1/N2(Pending))(R1 to N1/N2)(R2 to N1/N2
Complete
)(LAN Cable (Laid)
(R1 to N2)(R2 to N2)(R9 to N1/N2)(R11 to N1/N2)(R12 to N1/N2)Server Rack12 Powercable laid.
Fiber Laid B/W (R1 to R3))R1 to R5)(R2 to R3)(R2 to R5)(R11 to R3)(R11 to R5)(R12 to R3)(R12 to R5)(R3 to
R10)
(R6 to R10) Complete
Fiber/LAN Connectivity of
R9/R11/R12
With Network Racks
E9000 Server Installed In Exisiting Rack/R3 & R4 connected with SAN Switch/R12 to R7/R8 fiber Laid/SUN Complete
Server Connected with Management Switch/R3 SAN Switch Dressing
Adeel Ahmad
AzamSher/Nauman Ali 1
Azam Sher/Waqas Ali/Jamal Abdul Nasar 1
Sohail Asghar/Murad Khalid/Shahzad Jamil/Zakir Ullah/Muhammad Shahbaz 1
AzamSher/Waqas Ali/Uzair Ahmad 1
Murad Khalid
1
Murad Khalid 1
REVISIT_REASON Traveled KM Vehicle # ACTIVITY END DATE
Dressing/Tagging 125KM ACH-109 26-Jul-19
Tagging 64KM ACH-109/AHV-543 27-Jul-19
Quality 27KM (One End) AHV-543 43674
N/A 77KM LEE-1223 29-Jul-19
N/A 85KM ACH-109 30-Jul-19
N/A 161KM AMG-885 31-Jul-19
8-Aug-19
AMB-718 17-Aug-19
N/A 63KM
Ijaz Mehmood Installed all Server in Rack7/8/10 and 5serve installed in Rack1/2 F00101 F00559
Ijaz Mehmood Required two Vehicle for Both Shifts F00686 F00815
Ijaz Mehmood N/A F00774 F00082
Ijaz Mehmood N/A F00815 F00814
Ijaz Mehmood Vehicle are Used on Different Pactivity F00774 F00776
N/A
F00741 F00718 F00557 F00815/Absent B01466/Absent F00758/Absent
N/A
N/A
N/A
# of DAYS
Fixed Network North 56A08Y7
Multan
CM PAK 2019 BIDDING PROJECT
CMPAK Bidding 2019 Project Jhelum
CMPAK Bidding 2019 Project Karachi/1160
CMPAK Bidding 2019 Project DI-KHAN
CMPAK Bidding 2019 Project Kashmir
CMPAK Bidding 2019 Project DI-KHAN
CMPAK Bidding 2019 Project ISB
CMPAK Bidding 2019 Project ShahbazKhel
CMPAK Bidding 2019 Project Kahuta
CM PAK 2019 BIDDING PROJECT OKARA
Jazz NFVi-DC/vEPC Project Karachi
CMPAK Bidding 2019 Project Peshawar
CM PAK 2019 BIDDING PROJECT Multan
CMPAK Bidding 2019 Project Mardan
Jazz NFVi-DC/vEPC Project Karachi
CMPAK Bidding 2019 Project ISB
CMPAK Bidding 2019 Project Kahuta/Rawat
CMPAK Bidding 2019 Project ISB
CMPAK Bidding 2019 Project Karachi/1160
CM PAK 2019 BIDDING PROJECT GUJRANWALA
CM PAK 2019 BIDDING PROJECT SKT,KHARIAN
Jazz NFVi-DC/vEPC Project Karachi
CMPAK Bidding 2019 Project Karachi
CMPAK Bidding 2019 Project Peshawar/Taxila
CMPAK Bidding 2019 Project Fatehjang/Methiyal
CMPAK CRM Infra IT Project ISB
CM PAK 2019 BIDDING PROJECT Mandibhaudi,Gujrat,Wazirabad
CM PAK 2019 BIDDING PROJECT Multan
CMPAK Bidding 2018 Project ISB
Jazz NFVi-DC/vEPC Project Karachi
CMPAK Bidding 2019 Project Karachi
CMPAK Bidding 2019 Project Thatkot
Jazz NFVi-DC/vEPC Project Karachi
Jazz NFVi-DC/vEPC Project Karachi
Jazz NFVi-DC/vEPC Project Karachi
Jazz NFVi-DC/vEPC Project Karachi
Jazz NFVi-DC/vEPC Project Karachi
Site ID/Site Name
ISSUES
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
Islamabad_OSN_New_I
Islamabad_OSN_New_I
Islamabad_OSN_New_I
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
TWA Data Center i-10
Rawalpindi_OSN_New_I
TWA Data Center i-10
3146-Zong MSC
TWA Data Center i-10
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
3146-Zong MSC
IBA2-PTCL Exchange
3146-Zong MSC
IBA2-PTCL Exchange
4048
4048
3146-Zong MSC
3146-Zong MSC
314-PTN7900-NEW-I
3146-HSS-EXP2-I
Rawalpindi_OSN_New_I
3146-PTN7900-New-I
IBA2-PTCL Exchange
3146-P-Router
Rawalpindi_OSN_New_I
3146-OSN9800-EXP2-I
ZONG MSC LHR
4048
SARGODHA WATEEN ADM
MIANWALI WATEEN ADM
BHAKKAR WATEEN ADM
BHAKKAR WATEEN ADM
4048
LHR
wateen-Jhelum-OSN9800-EXP-P
8102-OSN9800-EXP-P
Wateen Mianwali-OSN9800-NEW-P
6661 Multan Zong MSC
Lodhran Wateen,Bhawalpur Wateen, Ahmad Pur 6169,Liaqat Pur Wateen,Rahim Yar Khan Wateen,
Sadiqabad 5815
8102-OSN9800-EXP-P
1160-DC Rectifier-New-S
WATEEN DI KHAN-OSN9800-NEW-K
9120-OSN9800-EXP-P/9147-OSN9800-EXP-P
WATEEN DI KHAN-OSN9800-NEW-K
3146-PTN7900-New-I
Shahbazkhel Wateen/8937 CMPAK/Karak Wateen/Kohat Wateen
8993-OSN9800-EXP-P
WATEEN OKARA
KHI0033_NFVI_New_S
KFC MSC-OSN9800-NEW-K
Muzafargarh Wateen, Chowk Qureshi Wateen
WATEEN MARDAN-OSN9800-NEW-K
KHI0033_NFVI_New_S
8134-OSN9800-EXP-I
8993-OSN9800-EXP-P/8192-OSN9800-EXP-P
3146-PTN7900-New-I
1160-DC Rectifier-New-S
4451/4242/5615
WATEEN SIALKOT/WATEEN KHARIAN
Exact DUID will be Update
1160-DC Rectifier-New-S
9417/Taxila Wateen
8081/8927
3146-Zong MSC
Wateen Bandibhaudin /Wateen Gujrat/wzd4042
Khanewal Wateen, 6437 Zong Site,Chichawatni Wateen, Sahiwal Wateen
3146-Zong MSC
KHI0033_NFVI_New_S
1160-DC Rectifier-New-S
8259-OSN9800-EXP-K
KHI0033_NFVI_New_S
KHI0033_NFVI_New_S
KHI0033_NFVI_New_S
KHI0033_NFVI_New_S
KHI0033_NFVI_New_S
COMPLETE ACTIVITY DETAIL
Installation of PSU/Power Cable Dressed/Tray Installed for SAN Switches/Manual Tagging of UPS
EHS/QC/Site Veified
Murad Khalid 1
Saqib Mehmood 1
Murad Khalid 1
Murad Khalid 1
N/A 1
Murad Khalid 1
Saqib Mehmood 2
Muhammad Zubair/Awais SHAH 1
Sohail Asghar 2
Saqib Mehmood 1
Sohail Asghar 1
Murad Khalid 4
Sohail Asghar 1
Saqib Mehmood 1
Muhammad Shafiq Khalid,Iftekhar Ahmed 1
Zakir Ullah/KashifMehmood/Tayyab Farooq/ 1
Sohail Asghar 1
Amir Ali/Arif Mehmood/Tousif Shafait/Muhammad Anees 1
Sohail Asghar 1
Zakirullah/KashifMehmood/Tayyab 2
N/A 1
Saqib mehmood 1
Murad Khalid/Fawad Ahmad 5
Muhammad Zubair/Imtiaz 2
Muhammad Shafiq Khalid 1
Muhammad Shafiq Khalid 1
Zakir ullah/Tayyab Tariq/Kashif Mehmood/Imtiaz/Muhammad Zubair 2
Atif Mehmood 3
Sohail Asghar 1
Uzair Ahmad 1
Nauman Minhas-Absent 1
Muhammad Shafiq Khalid 1
Muhammad Anees 1
Muhamad Ajmal/Nauman Minhas 1
Tayyab farooq/ Kashif Mehmood/Zakirullah/Zubair/Imtiaz 3
Atif Mehmood 4
Murad Khalid 1
Tayyab farooq/ Kashif Mehmood/Zakirullah/Zubair/Imtiaz 4
N/A 5
Tayyab farooq/ Kashif Mehmood/Zakirullah/Zubair/Imtiaz 6
Tayyab farooq/ Kashif Mehmood/Zakirullah/Zubair/Imtiaz 7
Tayyab farooq/ Kashif Mehmood/Zakirullah/Zubair/Imtiaz 8
Re-Visit Reason Traveled KM
N/A
126KM
N/A
PSU Missing
N/A 177KM
N/A
N/A N/A
N/A 60
N/A 64KM
24Hours Testing N/A
24Hours Testing N/A
89KM AJU-946
N/A N/A
N/A 133KM
N/A
N/A 193KM
N/A 728 KM
Visible
Usman Mufti
Usman Mufti
Zahid Iqbal
10210062516_205 Visible Zahid Iqbal
10210063255_6 Visible Zahid Mehmood
Ijaz Mehmood
10210063255_6 Visible Zahid Mehmood
NA NA Nauman Farooq
NA NA Nauman Farooq
10210062516_418
10210056787_417 Faisal Khan
10210056787_417 Zahid Malik
10210062516_418 Visible Fiber Plan in Process/Vehicle two Times
10210056787_417 Exact PO will be updated Zahid Malik
Po Will be Update Exact PO will be updated
10210056787_417 Visible Zahid Malik
10210062516_418 Visible
NA NA Nauman Farooq
NA NA Nauman Farooq
NA NA Nauman Farooq
NA NA Nauman Farooq
NA NA Nauman Farooq
NA NA Nauman Farooq
NA NA Nauman Farooq
NA NA Nauman Farooq
10210063255_49 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
N/A N/A Nauman Farooq
N/A N/A
Nauman Farooq
10210063255_49 Visible Nauman Tariq
Will be Update Visible Zahid Iqbal
10210063255_49 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
NA NA NA
Will be Update Will be update Nauman Farooq
10210063255_49 Visible Nauman Tariq
N/A N/A Nauman Farooq
10210063257_17 Visible Nauman Tariq
Will be Update Will be update Nauman Farooq
10210063255_40 Visible Nauman Tariq
10210063255_49 Visible Nauman Tariq
10210063255_40 Visible Nauman Farooq
Will be Update Will be update Zahid Iqbal
NA NA NA
NA NA NA
Nauman Farooq
Will be Update Will be update Zahid Iqbal
10210063257_17 Visible Nauman Farooq
10210063255_40 Visible Nauman Tariq
10210062516_63 Visible Ijaz Mehmood
NA NA NA
N/A N/A Nauman Farooq
Will be Update Visible Faisal Khan
will be Update Will be update Nauman Farooq
Will be Update Will be update Zahid Iqbal
10210063260_7 Visible Nauman Tariq
will be Update Will be update Nauman Farooq
10210063255_103 Visible Nauman Farooq
10210063255_103 Visible Nauman Farooq
10210063255_103 Visible Nauman Farooq
10210063255_103 Visible Nauman Farooq
COMMENTS(IF ANY) TEAM CAPTAIN ID Team Member 1 ID
REVISIONS
N/A F00814 F00106
Planned for
F00776 F00741 F00809 F00599/F00749 Tomorrow
F00082 F00776 F00518 F00749/F00741 Closed
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
F00232 N/A N/A N/A DONE
N/A N/A N/A N/A PENDING
F00819 F00809 F00599 N/A Closed
F00776 N/A N/A N/A N/A
F00813 F00595 F00518 N/A N/A
F00818 F00809 N/A N/A N/A
N/A N/A N/A N/A N/A
F00518 F00776 F00809 F00599/F00813 N/A
N/A N/A N/A N/A N/A
F00666 F00809 N/A N/A N/A
N/A N/A N/A N/A N/A
B00833 F00807 N/A N/A Closed
N/A N/A N/A N/A NOT DONE
N/A N/A N/A N/A DONE
N/A N/A N/A N/A DONE
N/A N/A N/A N/A DONE
N/A N/A N/A N/A DONE
N/A N/A N/A N/A DONE
N/A N/A N/A N/A DONE
N/A N/A N/A N/A DONE
F00666 N/A N/A N/A pending(Issues)
F00666 N/A N/A N/A pending(Issues)
F00807 N/A N/A N/A Closed/Issues
F00109 F00682 F00805 N/A Done
F00109
N/A N/A N/A Done
F00815 N/A N/A N/A Closed
N/A N/A N/A N/A will b eplanned
F00807 N/A N/A N/A Closed
F00666 N/A N/A N/A Closed
F00807 N/A N/A N/A N/A
F00818 F00809 N/A N/A N/A
F00807 N/A N/A N/A N/A
F00815 N/A N/A N/A N/A
F00602 F00793 N/A N/A N/A
F00569 F00749 N/A N/A N/A
B00833 N/A N/A N/A Closed
F00109 F00682 F00805 N/A Done
F00807 N/A N/A N/A Closed
F00749 F00569 N/A N/A N/A
N/A N/A N/A N/A Closed
F00666 N/A N/A N/A Closed
F00082 F00595 N/A N/A N/A
N/A N/A N/A N/A N/A
F00602 N/A N/A N/A DONE
F00602 N/A N/A N/A DONE
F00569 F00749 F00754 F00785 N/A
F00637 N/A N/A N/A pending
F00807
F00776 N/A N/A N/A N/A
N/A N/A N/A N/A N/A
F00602 N/A N/A N/A NA
F00109 F00805 N/A N/A N/A
F00818 F00819 F00813 N/A N/A
F00749 F00569 F00754 F00785 N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
F00749 F00569 F00754 F00785 N/A
N/A N/A N/A N/A N/A
F00569 F00749 F00754 F00785 N/A
F00569 F00749 F00754 F00785 N/A
F00569 F00749 F00754 F00785 N/A
Date EMP ID EMP NAME TEAM LEAD
Karachi KHI0033_NFVI_New_S
Karachi KHI0033_NFVI_New_S
Karachi KHI0033_NFVI_EXP_S
ISB 3146-NCE-IP-NEW-I
ISB 8102-OSN9800-EXP-P
ISB Will Be Update
ISB Huawei Office
ISB 3146-NCE-IP-NEW-I
Multan WATEEN QURESHI-PTN 7900-NEW-P(6298/Rojhan Wateen)
LHR WATEEN KHARIAN-OSN9800-EXP-P
Karachi KHI0033_NFVI_EXP_S
ISB 3146-NCE-IP-NEW-I
Karachi KHI0033_NFVI_EXP_S
DI Khan WATEEN DI KHAN-OSN9800-EXP-K
ISB 3146-NCE-Optix-NEW-I
Peshawar Will Be Update
ISB 3146-NCE-Optix-NEW-I
Karachi KHI0033_NFVI_EXP_S
Karachi 1160-DC Rectifier-New-S
Karachi 1160-DC Rectifier-New-S
Karachi KHI0033_NFVI_EXP_S
ISLAMABAD 3146-NCE-IP-NEW-I
Karachi 1160-DC Rectifier-New-S
Karachi KHI0033_NFVI_EXP_S
DI Khan Wateen Mianwali-OSN9800-EXP-P
ISLAMABAD 3146-PTN7900-New-I
ISLAMABAD 3146-NCE-IP-NEW-I
ISLAMABAD WATEEN DI KHAN-OSN9800-EXP-K
ISLAMABAD 3146-PTN7900-New-I
Karachi KHI0033_NFVI_EXP_S
ISLAMABAD 3146-NCE-IP-NEW-I/3146-Optix
ISLAMABAD 3146-NCE-Optix-NEW-I/Data Com
Karachi KHI0033_NFVI_EXP_S
ISLAMABAD 3146-NCE-IP-NEW-I/3146-Optix
Karachi KHI0033_NFVI_EXP_S
Karachi KHI0033_NFVI_EXP_S
Karachi KHI0033_NFVI_EXP_S
Karachi 1160-NCE-IP-NEW-IP
Chakwal 8091-PTN960-New-P
ISLAMABAD 3146-NCE-Optix-New-I
ISLAMABAD I-9 Warid MSC
ISLAMABAD 3146-PTN7900-New-I
Karachi KHI0033_NFVI_EXP_S
Karachi 1160-NCE-Optix-New-I/U2020/Optix
Karachi KHI0033-NFVi-EXP-S
ISLAMABAD 3146-HSS-EXP2-I
ISLAMABAD 3146-PTN7900-New-I
Karachi KHI0033-NFVi-EXP-S
Karachi 1160-NCE-Optix-New-I/U2020/Optix
Karachi KHI0033-NFVi-EXP-S
Karachi 1160-DC-Rectifier-New-S
Karachi KHI0033-NFVi-EXP-S
Karachi 1160-NCE-Optix-New-I/U2020/Optix
Karachi 1160-DC-Rectifier-New-S
ISLAMABAD 3146-PTN7900-New-I
ISLAMABAD 3146-PTN7900-New-I
ISLAMABAD 3146-PTN7900-New-I
ISLAMABAD 3146-CRM-New-I
Karachi 1160-DC-Rectifier-New-S
Karachi KHI0033-NFVi-EXP-S
Karachi 1160-NCE-Optix-New-I/U2020/Optix
Karachi 1160-NCE-IP-NEW-IP-S
ISLAMABAD 3146-CRM-New-I
ISLAMABAD 3146-PTN7900-New-I
Karachi 1160-DC-Rectifier-New-S
Karachi 1160-NCE-Optix-New-I/U2020/Optix
ISLAMABAD 3146-CRM-New-I
Karachi 1160-U2020-New-S
Karachi KHI0033-NFVi-EXP-S
Karachi 1160-DC-Rectifier-New-S
ISLAMABAD 3146-PTN7900-New-I
ISLAMABAD 3146-NCE-Optix-New-I
Karachi 1160-NCE-Optix-New-I/U2020/Optix
Karachi 1160-NCE-Optix-New-I/U2020/Optix
Karachi 1160-NCE-Optix-New-I/U2020/Optix
Karachi 1160-DC-Rectifier-New-S
ISLAMABAD 3146-NCE-optix-New-I
ISLAMABAD 3146-NCE-optix-New-I
Karachi KHI0033-NFVi-EXP-S
Karachi KHI0033-NFVi-EXP-S
ISLAMABAD 3146-EGW-NE40EX8-NEW-I
ISLAMABAD 3146-NCE-optix-New-I
ISLAMABAD 3146-NCE-optix-New-I
Karachi 1160-DC-Rectifier-New-S
Karachi KHI0033-NFVi-EXP-S
Karachi 1160-U2020-New-S
Karachi KHI0033-NFVi-EXP-S
ISLAMABAD 3146-PTN7900-New-I
ISLAMABAD 3146-CRM-New-I
Karachi KHI0033-NFVi-EXP-S
COMPLETE ACTIVITY DETAIL
Fiber/Lan Connectivity
Fiber/Lan Connectivity
Rack Installation and Fixing
HWI/Fiber Lan Cable Laying Connectivity/Power Cable Dressing
Pass Through/Fiber Swap
Tagging
Boards delivery
PowerON
Power On/Commissioning/Pass Through
EHS/QC
Installation/Dressing
Internal Power Cable Connectiivty/Power CABLE Laid for one Rack/Tagging
Installation/Internal Power Cable Connectivity and Dressing .Fiber LAN Connectivity
Power On/Commissioning/ATP
HWI of 02 Racks/Internal power Cable Fiber Lan Cable Connectivity and Dressing/System to ODF Fiber L
Fiber Laying
Powered On
Installation and Fiber Laid
Installation of Battery Racks
Installation of Battery Racks
Fixing of Servers/and Powered On/Troubleshooting
EHS/QC Site verifications/Fiber Laying/Dressing
Connection of jumper Wire and battery replacement
Installation of Switches/LAN CableConnectivity
Power On/PAT
Fiber Laying/PTN t0 PTN, PTN t0 ODF /Tagging (Printing)
Fiber Identiying
Leftover Receving
Fiber Laying Patching/Dressing
New Server Installation/Crimping of LAN Cable
Fiber Testing & Cutover
Fiber Testing/Server Installation
SAN/IP Switch Installation
Fiber Testing & Cutover
Power On of DB
LAN Cable Dressing and Installation of DB(One Side)
Power On DB
DN Receiving/And Equipments Segregation
Dual PowerOn
Fiber Identiying/Patching
PAT
Connectivity and Testing
Connectivity and Testing
HWI/Server/Switches
Cutover
Connectivity and Testing
Dressing and Tagging
Fiber Laying Patching/Dressing
Fiber/LAN Cable Dressing
Power Cable Laying
Power Cable Tagging
Internal conectivity/Tagging
Power Cable Laying and Timble Patching
Connectivity and Testing/Fiber Laying EHS QC Site Verification
Board Addition
Connectivity & Fiber Laying
Dressing
Dressing and Timble Patching
Dressing and Patching
internal Dressing /Tagging
Server Installatio/Power On
Dressing
Connectivity & Fiber Laying
Power Cable Laying/and Patching Timbles
Power Cable Laying System to ACDB
Dressing
ACDB Installation
Installation/Dressing
Power Cable laying Rectifier to System
Fiber Laying/Connectivity/Testing (as per Updated Plan)
Power Cable Laying for New Installed Server(Existing Rack)
Power Conenctoin in ACDB/Power Cable Laid towards UPS and Connectivity
Power On of ACDB & Server Racks
Tagging on Racks and Power Cables
Power Cable Laying
Fiber Laying server to ODF/PTN 2 Cards Connectivity
Fiber Laying and Power Cable dressing for Server
LAN Cable Crimping and Testing
Tagging/dressing
Fiber Laying and Power Cable dressing for Server
Power On of new Server/Site signed and verified
Fiber Laying
DN Handovered/Site Verification
Tagging/dressing
Switch Installation/Fiber Laying
Tagging/Power connectivity
Fiber Laying
Fiber Laying and Conenctivity
Tagging/Power connectivity
ACTIVITY COMPLETION
Engineer Supervisor
STATUS
In Process N/A Umhammad Umer Zeb
In Process N/A Umhammad Umer Zeb
In Process N/A Umhammad Umer Zeb
Completed F00818 Adeel Ahmad
Completed F00786 N/A
Completed F00814 Adeel Ahmad
Completed F00809 N/A
Completed F00784 Muhammad Zubair
Completed F00774 N/A
In Process F00751 Amir Nazir
In Process F00101 Muhammad Makki
In Process F00814 Adeel Ahmad
In Process F00101 N/A
Completed F00747 Muhammad Zubair
Completed F00818 Adeel Ahmad
Completed N/A N/A
Completed F00818 Adeel Ahmad
Completed F00112 N/A
In Process N/A Ahsan Raza
Completed N/A Ahsan Raza
Completed F00112 N/A
Completed F00814 Adeel Ahmad
Completed N/A Ahsan Raza
Completed F00112 N/A
Completed F00747 Muhammad Zubair
Completed F00818 Adeel Ahmad
Completed F00784 N/A
Completed F00686 N/A
Completed N/A Adeel Ahmad
Completed F00112 N/A
In Process N/A Adeel Ahmad
Completed N/A Muhammad Zubair
In Process F00112 N/A
Completed N/A Adeel Ahmad
Pending F00112 N/A
Completed F00112 N/A
Completed F00112 N/A
In Process F00637 Awais Shah
Completed B00833 N/A
In Process F00815 Muhammad Zubair
Completed F00818 N/A
In Process F00814 Adeel Ahmad
In Process F00112 Zakir Ullah/Kashif Mehmood/Tayyab Farooq/
In Process F00118 Awais Shah
In Process F00101 Muhammad Makki
Completed F00082 Adeel Ahmad
In Process F00814 N/A
In Process F00101 Muhammad Makki
In Process F00118 Awais Shah
In Process F00101 Muhammad Makki
In Process F00108 N/A
In Process F00101 N/A
Completed F00637 Awais Shah
In Process F00108 N/A
Completed F00814 N/A
Completed F00717 Muhammad Bilal
Completed F00814 N/A
Completed F00818 Adeel Ahmad
Completed F00108 N/A
Completed F00101 N/A
Completed F00637 Awais Shah
Completed F00108 Awais Shah
In Process F00818 Adeel Ahmad
Completed F00814 N/A
In Process F00108 N/A
Completed F00118 Awais Shah
Completed F00818 Adeel Ahmad
Completed N/A N/A
Completed N/A Ahsan Raza
Pending N/A N/A
Completed F00814 Muhammad Bilal Shafi
Completed F00784 Saqib Mehmood
Completed F00745 N/A
Completed F00108 N/A
Completed F00108 N/A
Pending F00108 N/A
Completed F00814 N/A
Completed N/A N/A
Completed N/A Ahsan Raza
Pending N/A Zakir ulla
Completed Muhammad Bilal Razaq Adeel Ahmad
Completed Asif Ali Adeel Ahmad
Completed Adil Tahir F00823 N/A
Completed F00637 N/A
In Process N/A Zakir ulla h
Completed N/A Muhammad Asif
In Process N/A Zakir ulla h
Completed N/A N/A
Completed F00814 N/A
Completed N/A Zakir ulla h
Technician Visit No
Work in Progress
Work in Progress
Work in Progress
Work in Progress
N/A
EXACT DUID/Project Code will be Update
N/A
Installation In Progress
N/A
N/A
Work in Progress
Work in Progress
Work in Progress
N/A
Vehicle Used on multiple activities
N/A
New MSC Task Completed
Work in Progress
Waiting fo rCustomer Approval
Approval Done
Work in Progress
Work in Progress
Civil Works Pending
Work in Progress
N/A
N/A
N/A
Daewoo (Leftover)Receiving and moved to Netkom Warehouse
N/A
Fibre Laying and LAN Cable Connectivity/Power On servers
Vehicle Used two multiple time for Same Activity
Vehicle Used two times
Installation In Progress
two vehicle are used on same activity
Power on of DB will be planned as per Customer
Power on of DB will be planned as per Customer
Power on of DB will be planned as per Customer
Installation In Progress
N/A
N/A
N/A
Vehicle Used on multiple activities
N/A
Installation In Progress
Installation In Progress
N/A
two vehicle are used on same activity(Utilized on Admin Activities
Installation In Progress
Installation In Progress
Installation In Progress
Installation In Progress
Installation In Progress
Installation In Progress
Installation In Progress
Vehicle Used two times(EHS/QC)
N/A
Vehicle Used two times(EHS/QC)
U2020/NCE Activity(will be updated-Not Worked on CRM
Installation In Progress
Installation In Progress
Installation In Progress
N/A
Plan will be Update/Cutover Will be Planned
Installation In Progress
Installation In Progress
N/A
N/A
N/A
Customer end issues
Cutover
two Vehicle Used
N/A
N/A
N/A
Power Cable Laying
Fiber Laying for new Server
Fiber Laying for new Server
N/A
N/A
Fiber Laying
N/A
Fiber Laying In Process(One Side Droped by Official Vehicle.reading shared by ACCESS team
Power Cable Laying/Tagging In Process
N/A
Tagging
N/A
Fiber Laying for new Server
Fiber Laying for new Server
N/A
TEAM CAPTAIN ID Team Member 1 ID Team Member 2 ID Team Member 3 ID