You are on page 1of 2

TAMIMI Pre-Engineered Buildings DOC.

# TPEB-QHSE-F-01

ISSUE# 01
IN-PROCESS ASSEMBLY INSPECTION CHECK LIST
ISSUE DATE 05-06-2017

TAMIMI PEB INSPECTION CHECKLIST IC NUMBER DATE APPROVED RFI NUMBER

ASSEMBLY OF ROOFING INSPECTION CHECK LIST TPEB-AKH-059

PROJECT TITLE JO NUMBER CONTRACTOR / SUBCONTRACTOR

AL KIFAH HOLDING - MARJAN TPEB-TAMIMI

BUILDING DESCRIPTION Scheduled Inspection DATE Inspection Level


BUILDING Number

#2 4 MAN (A TO F)

ITE
M ACCEPTANCE CRITERIA Reference PASS FAIL N/A REMARKS
NO.

D: Roofing Assembly

The roof LGS frame shall be constructed of minimum 150 x 41 x 1 mm GI sections TPEB- SPR-
D1
designed to support. 10
TPEB- SPR-
D2 The roofing shall be designed with a minimum slope of 10%.
10
The roof shall be covered with minimum 0.5 mm thick pre-painted corrugated roofing
metal sheet cladding. The cladding shall be screwed directly to the roof structure. All TPEB- SPR-
D3
trims provided for inward and outward corners, bottom & top shall match the exterior 10
cladding
All roofing shall be insulated with 100mm fiberglass blanket insulation with R-value TPEB- SPR-
D4
of ( R-16) 10

REMARKS:

Production Engineer / QC INSPECTOR QC MANAGER/ QC Supervisor Third Party Representative


Supervisor
NAME: NAME: NAME: NAME:

SIGNATURE SIGNATURE SIGNATURE SIGNATURE


TAMIMI Pre-Engineered Buildings DOC. # TPEB-QHSE-F-01