1.0 Amendment History:
Ps
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Manak Nagar, Lucknow - 226011
PEWIT1-8
Vendor Development & Approval Procedure.
1, | First
Issue
27.08.2013
1.0 |i First Issued under new documentation system for 1SO9001:2008, New
‘Work Instruction issued for giving certificate to vendors after ISO Cells
Issued format ‘Cerificate of vendor approval document No. QO-F-
716"
Tl) Updated minimum quantty criteria for up gradation,
il) Addition of temporary delisting as per clause no. 42.8 in document
no, QO-D.7.4-14
issue
17102014
2.0 |i) Updated minimum quantity criteria for up gradation
I) Performance criteria for up-gradation of vendor status ftom Part Il to
Part | as per latest ISO document issued by MR cell
i) To incorporate the latest instructions issued by ISO cell effective from
01.07.2014,
3. | Third
issue
16.06.2016
3.0 | 7) To incorporate the latest instructions issued by 1SO cell effective from
07.05.2018
i) Service performance criteria for up gradation o Part! updated.
& | Fourth
issue
we0TTe
‘40 _| Changes have been incorporeled regarding vendor satus as advised by
Rallway board vide letter no. 2001/RS(G)I779I7 dated 01.02,2017 and
2017/EBRIT(13)9 dated 08.12.2017.
Updated minimum quantity criteria for upgradation from Developmental
\Vendor to Approved Vendors of RDSO.
Ore by
eres B16
(Dinesh Kumar
ED/ PS & EMU
QS
‘Copy controlled only when viewed on ROSO website, Local/rinted copies permitted but are uncontrlied. Check controlled copies before use,
Prepared by ICS
Issued by ICO Page 1 af 191505003 2008 | DocumentNes FEWER] Version Now 4d
Dose ace /OSPIOHE |
‘Document Tile Procedure for Vendor Development.
INDEX
‘Clause No. | Name of the clause ‘Page
10 ‘Amendment History 1
20 Purpose 3
3.0 ‘Scope of application 3
40 Definitions 3
5.0 ‘Vendor application for registration 4
6.0 ‘Vendor application processing a
70 ‘Vendor relaxation of registration requirement 6
80 ‘Vendor registration Expression of Interest (EON) 6
30 Vendor List 6
100 ‘Type testing of prototype/samples 7
110 “Vendor changes in approved status 7
120 Picking of samples and testing of samples Te
13.0 Procedure to new specification, existing spec g
140 ‘Compliance to new requirements by the vendors 8
15.0 ‘Status of vendor with changed design documents g
16.0 ‘Changes in the vendor entity 3
170 Quality audit of vendor 3
18.0 ‘Vendor registration schedule of charges 9
19.0 Referenced Documents 0
20.0 Referenced Documents of External Origin 9
21.0 Associated Records 2
22.0 Responsibility & Authority 10
23.0 Abbreviations i
“Annexure Minimum Quantity Criterion for Up-gradation of Vendors 12
“Ar From Developmental Vendor to Approved Vendor category
PE-RF-8.23- | Format for letter of adequacy of capacity-cum-capability and | 5
4 sment for development of prototype
Distribution
J
ie QS
*Preparel by ICS Tssued by ICO
Page DoF 19
J
apy controled only when vewed on RDSO Website Local/rinted copies permitted but ae uncontrolled, Check controlled copies before use.0800 2008 | GocumentNosPEWIT.LE | Version Now 40 Date fective! 05/07/2018
Document Title: Procedure for Vendor Development.
controlled copies before use,
2.0 Purpose
To specify the procedure for vendor registration / approval (multi-sourcing) of items allotted to
RDSO by Railway board for PS & EMU Directorate based on RDSO vendor approval procedure
issued by ISO cell of RDSO.
3.0 Scope of Application:
3.1 This covers the procedure for vendor development for items referred by Railway Board to RDSO
from time to time vide letter nos. 99/Elee(GY165/116 dt. 14,02,2001, 2002/Elee(GY/I81/I at.
16.05.2002, 2001/Elec(GY/165/16 dt 30.09.2008 and letter no. 2010/Elec(Dev)/225/1. dt
07.06.2010 and letter no. 2001/RS(G)'779/7 dated 01.02.2017 and 2017/E&RI7(I3)/9 dated
06.12.2017 issued in this regard and RDSO vendor approval procedure issued by ISO cell of
RDSO. This includes procedures for fresh registration, and maintenance of status of vendors in
the "Master List of Approved Vendors” No. EL-M-7.1-I(latest version) issued by QA.
(Electrical) Directorate of RDSO in the months of January and July every year. This also
includes the processes for up-gradation, down-gradation, de-listing and reinstatement of the
vendors.
4.0 Definitions
4.1 Primary vendor:
‘The vendor who can design, manufacture and supply the items approved by PS & EMU
Directorate to the Railways and Production Units directly.
42 Sub Vendor:
Vendor to whom primary vendor out-sources the parts of the item or, from whom primary
vendor procures the item for supply. Item supplied by the sub-vendor will Form part ofthe Bill of
Material ofthe primary vendor.
43 Fresh registration:
Process for development of a vendor to be approved by Directorate Head for inclusion in
Developmental Vendor category of the Master Vendor List EL/M/0023.
44° Up-gradation:
Up-gradation means change of status of a vendor from ‘Developmental Vendors’ to ‘Approved
Vendors’.
4.5 Down-gradation:
Down-gradation means demoting the name of the vendor from ‘Approved Vendors’ to
“Developmental Vendors’.
46 Delisting:
Delisting means striking off the name of the vendor from the "Master List of Approved
Vendors” due to penal action.
hs)
Copy controlled only when viewed on RDSO website, Local/printed copies permitted but are uncontrolled. Check controlled copies before use
Prepared py 10S Tesued by ICO Page 3 of 19TO9G0H 2608 | BocamentNo PEWITES ] Version Nos 4d Date fective 05/05/2018
‘Document Title: Procedure for Vendor Development.
47
48
6.0
61
63
63.1
a)
»)
°)
4
)
Reinstatement:
Re-instatement means restoring the name of the de-listed vendor in “Master List of Approved
‘Vendors” No. EL/M/0023 (latest version) issued by QA (Electrical) Directorate of RDSO .
Quality Documents:
Document consisting Quality Assurance Plan (QAP) and drawings having all pages numbered
and signed by the competent authority of the vendor.
‘Vendor Application for Registration
Refer latest version of document issued by MR at S. No. 5 of Cl. 19.0 of this document (QO-D-
71-5).
‘Vendor Application Processing
Refer latest version of document issued by MR at S. No. 6 of Cl. 19.0 of this document
(QO-D-7.1-6). Scrutiny of the documents shall be carried out as per document no QE-F-
717 version 1.0 or latest.
Preparing Quality assurance plan (QAP) by Vendor during Fresh Registration
‘The QAP to be submitted by the vendor in duplicate (along with the application form for
registration) shall cover the following aspects ~
Organisational Chart, clearly indicating the Quality Control Set-up.
Qualification of key personnel and the officials deployed in Quality Control Cell
Process Flow Chart indicating process of manufacture for an individual product or for a family
of products if the process is same.
Quality Assurance System — Inspection & Testing Plan, This shall cover the following: -
+” Tocoming material
Process control
Product control
System control
List of sub vendors and inspeetion plan.
Stage inspection detailing inspection procedure, inspection parameters, method of testing/test
procedure including sample sizes for destructive and non- destructive testing ete
‘The generalized format for covering the information under (dl & ) should be as below:
Subject/ | Sample Size | Parameters |Mode of | Acceptance _| Rejection details
its | for inspection’ | limits! :
Product! | Frequency of | inspection | osicemeny | Criteria pe
roeess | inspection Soon ‘specified | cessed
sed Value seared
raises ‘Issued by ICO Page 4 of 19Copy controlled only when viewed on RDSO website, Locel/printed copies permitted but are uncontralled. check controlled copies before use,
TSOS00H 2008 | DocumentNo, FEIT | VeRion Nos 40 ‘ate ETectver 09/01/2018
Document Title: Procedure for Vendor Development.
5
632
6343
Calibration scheme and status of calibration of test equipment.
QAP covering all the information as asked above under item ‘a’ to ‘f” must be given in the form
of single document indicating name of the firm and page no. ‘x’ of *y’ on each page. Each page
should be signed by QC in-charge. The approved QAP must be & controlled document and a
quality record of ISO 9001 quality control system of the vendor. A certificate to this effect shall
be provided along with the QAP by the vendor.
While communicating the fresh registration to the vendor, the approved copy of QAP shall be
sent to the vendor for implementation, duly stamped as “approved’. The QAP shall be for the
products for which the firm is approved. The QAP shall be approved by the officer nominated
for capability assessment. This will be subject to review/up gradation by RDSO in the light of
fresh data & experience.
65 Sub-vendor
65.1
652
693
65.4
10
1
80
Primary vendor shall outsource component from only ISO certified sub vendor for which RDSO
approved sources does not exist as per the provision of STR (Schedule of Technical
Requirement).
Ensuring quality of material supplied by the sub-vendor to the primary vendor will be the
responsibility of the Primary Vendor.
Sub-vendor and the item supplied by him will form part of the Bill of Material of the primary
vendor.
Primary vendor will ensure the compliance of all the parameters by the sub-vendor as applicable
for his registration with RDSO, such as:
QAP of the sub-vendor is approved by the primary vendor.
Sub-vendor has submitted the Quality Manual to the Primary Vendor.
‘The sub-vendor has all the requisite infiastructure of manufacturing and testing facilities,
preferably under one roof.
Periodical inspection schedule for sub-vendor is being followed strictly by the primary vendor.
Vendor relaxation of registration requirements
Refer latest version of master list of IS document no, QO-D-7.1-7 & QO-D-7.1-12.
Vendor registration expression of interest (EOD
Refer latest version of document issued by MR at $. No. 8 & 16 of Cl. 19.0 of this document.
(QO-D-7.1-8 & QO-D-7.1-16).
Prepared oyfieS Issued by ICO. Page 5 of 19
Copy controled only when viewed on RDSO website, Local/printed copies permitted but are urcontrolld. Check contalled coples before use.SSOS00E 7008] DacimentNosPEWATa® | Verdon Nasa Date fective: 09/01/2018
Document Title: Procedure for Vendor Development
9.0
o1
92
93
94
10.0
10.1
10.2
103
10.4
N21
Vendor List
Refer latest version of document issued by MR at S. No. 9 of Cl. 19.0 of this document
(QO-D-7.1-9)
Publication of vendor list,
EDIQA (Elect.) will compile the master list of all RDSO approved vendors of electrical
disciplines. ED/QA (Elect) shall publish the approved vendors list EL-M-7.1-I(latest version)
every six months, in the months of January & July.
‘The vendor list shall be a controlled document, to be issued as per distribution list to be decided
by ED/QA(Elect). The list shall be valid for six months from the date of issue.
The group wise vendor list of approved items shall be maintained by the respective unit officer
in their respective files. Any changes regarding approval of new vendors or, up-gradation/down-
gradation / deletion of existing vendors will be advised to ED/QA (Elect) in the first week of
every month,
‘Type Testing of Prototype/Samples (during fresh registration, revalidation of revised
specifications & quality audit)
Refer latest version of document issued by MR at S. No. 10 of Cl. 19.0 of this document
(QO-D-7.1-10).
The firm will be asked to develop the prototype by writing a letter as per the latest
version of standard format no, PE-RF-8.2.3-4 (ref-22), The record will be maintained by
Unit Supervisor in Quality File (Subject file)
Vendor shall submit internal test report and test protocol to RDSO. RDSO representative
will witness type test if internal test report is satisfactory.
It shall be mandatory for the firm to offer the samples for testing within the specified
“TIME PERIOD’ as per ISO document no. QO-D-7.1-6.
Vendor changes i
approved status
Refer latest version of document issued by MR at S, No.11 of Cl. 19.0 of this document
(QOD7.1-11).
Up gradation of Fresh Vendors from developmental to approved vendor.
Apart from prerequisites specified in QO-D-7.1-I (latest version), following shall also apply:
Minimum Quantity Criteria:
Minimum quantity criteria for up-gradation to approved vendor is enclosed as Annexure ~ A.
3 Ba
PresabetEyicS issued by ICO Page 6 oF 191509001; 2008 | Document NocPEWIT.-8 | Version No 40 Date fective: 09/03/2018
Document Title: Procedure for Vendor Development,
1122
13
113.1
29
13.0
Service performance Criteria:
For assessing the performance in service the FRPCPY of the product should be comparable with
the average FRPCPY of the same product supplied by other vendors of ‘list of approved
vendors” as per the latest records available with RDSO. For calculation of average FRPCPY, the
FRPCPY of the worst vendor of ‘list of approved vendors’ shall not be considered.
‘The items for which there is no approved vendor, the FRPCPY of the product should be
comparable with the average FRPCPY of the same product supplied by other developmental
vendors as per the latest records available with RDSO. For calculation of average FRPCPY, the
FRPCPY of the worst developmental vendor shall not be considered
‘The performance reports received through web portal of RDSO/through post up to the date of
‘The items for which there is only one approved vendor, the FRPCPY of the product should
be comparable with the FRPCPY of the same product supplied by approved vendor.
Down Gradation of Vendor from ‘Approved Vendors’ to ‘Developmental Vendors’ and de-
listing of Vendor
‘The prerequisites specified in latest version of QO-D-7.1-11 shall be followed.
Picking of samples and testing of samples
‘The procedure of picking up the samples for testing of quality of product shall be as per ISO
document No. QO-D-7.1-10 (latest version),
Procedure to introduce new specifications, or change in existing Specifications etc.
Refer latest version of document issued by MR at S, No. 1, 2, 3,4,15 &16 of Cl. 19.0 of this
1, QO-D-7.1-2, QO-D-7.1-3, QO-D-7.1-4, and QO-D-7.1-15 & QO-D-
14.0 Compliance to new requirements by the vendors
The already approved vendor shall be required to comply with the changes in design documents
like specification/STR/drawing on a written time bound basis. However, the applicants seeking
fresh approval shall be required to comply with the requirements of the latest design documents,
with all the changes to date before the approval is granted,
15.0. Status of the vendor with changed design documents (Spec./STR/Drg)
‘Whenever a specification is revised by RDSO and the revision does not involve major changes in
the design, the status (approved or developmental vendor) will continue to be the same, Any
Prepared {Ssued by ICO Page 7 of 19TSO 900%: 2008 | Document No: PEWETES | Version Nos ad Date Hectve: 09/01/2018
Document Tile: Prodedure Yor Vendor Development
additional tests, if required, shall be completed within given time, failing which the vendor may
be down-graded / delisted.
16.0. Changes in vendor entity
16.1 Refer latest version of document issued by MR at S. No. 12 of Cl. 19.0 of this document
(QO-D-7.1-12).
16.2 Partial Addition of works
‘The procedure in the above paras shall also be applicable in case of partial augmentation ie.,
setting up of new works for carrying out a part of the operations.
16.3 In case of change in name of the vendor firm’s visit is not mandatory.
17.0 Quality audit of approved Vendors
17.1 The quality audit shall be done as per latest version of document (QO-D-7.1-13) issued by MR at
S.No. 13 of Cl. 19.0 of this document
17.2 Before taking up the quality audit, approval from directorate head shall be required as per format
no. QO-F-7.1-2 (latest).
17.5 The nominated official shall submit the quality audit report as per the ISO cell format no. QO-F-
7.1-9 (latest version),
18.0 Vendor registration schedule of charges
Refer latest version of document issued by MR at $. No. 14 of Cl. 19.0 of this document
(QO-D-7.1-14)
19.0 Referenced Documents
S.N. [Document Number* | Document Name i
E QO-D-T.I-1 ‘Creation of equipmentitem specification
z QO-D712 ‘Change of equipmentitem specification
3 QO-D-7.1-3 Deletion of equipment/item specification
4 Q0-D-7.-4 Change of controlling authority Tor equipment/tem
specification
5. QO-DT15 Vendor application for registration
6 Q0-D-7.1-6 ‘Vendor application Processing
7 QO-D7.7 ‘Vendlor Relaxation of registration requirements
8 QOD71-8 ‘Vendor registration expression of interest
9. QO-D-7.19 ‘Vendor List
10, Q0-D-7.1-10 ‘Vendor sample type testing:
1 Q0-D7.FI1 Vendor Changes in Approved Status
2. | QO-D-7.1-12 ‘Vendor Changes in vendor entity
BRS
Issued by ICO Page & of 19TBO S001: 2008
Document Nos PEWETLE
Veron io 8
Date effective: 09/01/2018
Document Tie: Provedure Yor Vendor Develonment
Copy controled only when viewed on RDSO website, Local/arinted copes permitted but are uncontrolled. Check controlled copes before use.
3B. Q0-D-7.1-13 Quality audit of Approved Vendors
14. QO-D-7.1-14 ‘Vendor registration schedule of charges
5, Q0-D-7.1-15 Product Development
16. | QO-D-7.1-16 Publication of Expression of Interest
17. Form for vendor registration
18. List of documents to be sought from vendor at the time of
registration & annexures /forms
19. Capacity assessment report format
20. QO-F-71-9 Report for quality auait
2 “Annexure A. ‘Minimum quantity criteria for up gradation
22, PE-RF-82.3-4 Format for leter of adequacy of capacity-cum-capability and
technical requirement for development of prototype
‘refer ISO cell website for latest version,
20.0 Referenced Document of External Origin:
Railway board’s letter no 2010/Elect (dev)/225/1 dated 07/06/2010
21.0 Associated Records: Nil
22.0 Responsibility & Authority:
‘Activity Responsible [ Approver | Supporting — | Consulted | Informed
Creation, maintenance of [ICO Directorate | CSSO
this document Head
Requirement of deviation [TCO Directorate | Respective
from this form template Head officer
directorate
‘Approval & change of the | ICO Directorate | Respective
Vendor Approval procedure Head officer
directorate
Maintenance of the Vendor | ICO z
Approval procedure
Capacity-cum-capability | Unit Officer | Directorate | Respective
assessment of the vendor | or any other | Head officer
Officer directorate
nominated by
Directorate
Head
“Approval of QAP Unit Unit Officer
Supervisor
Tssted by ICO Page 9 of 19109001 2008 | Document No PE-WITI-S
Version Na240
Date EHectve: 09/03/2018
Document Title: Procedure for Vendor Development
Activity Responsible | Approver ‘Supporting Consulted | Informed
Approval of — Quality | Unit Unit Officer
Manual Supervisor
‘Approval of Prowoiype | Unit Directorate [UO
Supervisor | Head
Preparation of checklists | Unit Directorate
No. PE/C/0001 & | Supervisor Head
PE/C/0002
‘Approval as Part I source | UO Directorate | US
Head
‘Approval for up-gradation | UO Directorate | US
from Pat =I Head
to Part-I
Issue of approval letter to | Unit Officer Unit Officer | Unit
vendor Supervisor
Issuing authority for vendor | ICO - Ics
approval procedure and
related documents.
Re-issuing authority Ico and | = Ics
| Controlled |
copy holders |
23.0 Abbreviations: Nil a
,
QS
S Issued by ICO Page 10 of 19
Copy controlled only when viewed on ROSO website. Laca/printed copies permitted but are uncontrolled Check controlled copies before useCopy cantrlled only when viewed on RUSO website, Lcal/printed copies permitted but are uncontrolled. Check controlled copies before use
TSO 300%; 2008] Document Nos PEWITIS | Version No 8D
Date Efective: 09/01/2018
Document Tite Procedure or Vendor Development
POWER SUPPLY & EMU DIRECTORATE
Master list of items dealt by PS & EMU Directorate
MINIMUM QUANTITY CRITERION FOR UPGRADATION OF VENDORS
FROM DEVELOPMENTAL TO APPROVED VENDOR
Master list of items dealt by PS & EMU Directorate
Annexure “A”
SIN- | Description of | Max. | Time Taken in type testing (if | Period of field | Minimum
item Time | applicable} trial (if ‘quantity
permite applicable required for
ed for prior to up-gradation
offering inclusion in list |
the of RDSO |
| sample vendor for
during developmenta
fresh | _ orders
registra | Time Required Qty | Perio | Qty
tion ¢
TROAHVRIA | Six 15 days forinitial | 40 NA [NA | 6500cells
battery months | testing. mono
06 months for | blocks
storage and life
cycle test. 5 days
testing after 05,
months,
2, [AI00AVRLA [Six | a5daysforinitial | 10cells |NA | NA | 4000cells
battery months | testing, |
06 months for
storage and life
cycle test. 5 days
testing after 06
months.
3. [650Ah VRIA | Six 15 days forinitial [20cells [NA | NA | item under
battery months | testing. development
06 months for
storage and life
| cycle test. 5 days
| testing after 06
months,
4 [2v,70an | Six 15 days forinitial | 0 NA [NA | 1100cells
VRIA battery _| months | testing. mono
Prepéred TssbedbyICO | Page 11 oF 11503001: 2008 | Document No. PEWL7I8
Version No 40
| Date effective: 08/01/2018
|
Document Tite: Procedure Tor Vendor Development.
(06 months for block
storage, and life
cycle test. 5 days
testing after 06
months.
5. [ERRUfor45 [Six | 8daysforinitial | 02 [03 [01 | 200Nos
kWalternator | months | testing. mont
| 2 days after shock hs
and vibration test.
6 [ERRU for 25kW |Six | Bdaysforinitial _ | 03 03 [02 | 100Nos
alternator ‘months | testing. mont
2 days after shock hs
and vibration test.
7. [Roof mounted [Sik | 4daysforinitial | 01 NA [NA | 65Nos
‘AC package unit | months | testing
for LHB variant 2 days after shock
‘AC coaches and vibration test
8 [Roofmounted |S | adaysforinitial [02 NA [NA | 04 Nos
AC package unit | months | testing
for Double 2 days after shock
Decker E06 AC and vibration test
coaches
9, [415V,3 phase [Sik | 3daysforinitial | 01 NA | NA | 580 for
| induction months | testing number condenser
motors for AC 2daysatter shock | of each motor and 290
Package unit and vibration test | motor for blower
motor
| 40. [2sKva Six__| 7daysforinitial | 2Nos | NA | NA] 40Nos
understung _| months | testing
Inverter 2 days after shock
and vibration test/
environmental test.
iL [4skw Six | 7daysforinitial | Oiset [NA [NA | 230Nos
undersiung type | months | testing
| constant 2 days after shock
voltage and vibration test/
Regulated ‘environmental test.
Battery charger
12, | 336kWDiesel- [Six [5 days for engine | O2set [06 |02 | 41 Nos
Alternator set | months | testing, | mont
for power car 5 days for hs
Alternator testing,
8 days for
combined testing.
A!
Preseierrs tS — Tesved By CO Page DOF1503001: 2008
Document No: PEWITI
Version Na7a0
Date Cective: 09/01/2008
‘Document Titles Procedure For Vendor Development
13. | S00KVA/336 KW J Six Sdaysforengine | Oiset [06 | 01 | temisunder
underslung | months | testing, mont development
Diese. 5 days for hs
Alternator set Alternator testing,
for power 8 days for
car/UDSLR combined testing.
14. | 450kWHigh [six | Sdaysforengine | O2set [06 | 02 | Remisunder
capacity DA set | months | testing, mont development
for power car 5 days for hs
Alternator testing,
8 days for
combined testing.
| 15. [Undersiung ~~] six | Sdaysforengine | O1set [06 | 01 | ttemisunder
High capacity | months | testing, mont: development
450 KW DA set 5 days for hs
for LHB Power Alternator testing, |
car 8 days for
combined testing
16. | ZS coupler Six Sdaysforinitial | Oiset_|NA |NA | 180Nos
(4004, 750v) | months | testing
| 3 days after shock
and vibration test
17, | Inert Vehicular [Sik | Sdaysfor initial | Otset_ [NA | NA | 460 Nos
coupler High | months | testing
‘capacity ( 500A 3 days after shock
750v) and vibration test
18. | Switch Board | Six | Sdaysforinitial | O1Nos [NA [NA | 25Nos
cabinet for LHB_| months | testing
FOG AC coaches 3 days after shock
and vibration test _
19, | Switch Board [Six | Sdaystor initial | O1Nos |NA | NA | 10Nos
cabinetfor Air | months | testing
conditioning of 3 days after shock
LHB Power car and vibration test
20. | Switch Board [Six | Sdaysforinitial | O1Nos | NA | NA] 21 Nos
cabinet for LHB_| months | testing
AC power car 3 days after shock
for 2x 500 kVA ‘and vibration test
DA set as per
EDTS 103
21, | Switch Board [Six | Sdaysforinitial | OLNos | NA | NA | emis under
cabinet for LHB_| months | testing development
SG AC Coaches 3 days after shock
and vibration test
22. | Switch Board | Six S days forinitial [O1Nos | NA |NA_ | O2Nos
3
SL
Prepared by ICS isstied by ICO Page 13 of 19(S000: 2008] Document No FEWI-TIE
Version Nos 40
‘Date EMective: 09/01/2038
acumen Title: Procedure for Vendor Development.
cabinet for LHB | months | testing
AC Hot Buffet 3 days after shock
___| Coaches and vibration test
23. | Switch Board Six 5 days for initial O1Nos | NA NA 02 Nos
cabinet for EOG | months | testing
‘Type Double 3 days after shock
Decker Coaches and vibration test
24. | Set of Panels for | Six 5 days for initial O1Nos | NA NA 121 Nos
LAB EOG Non | months | testing
AC Coaches 3 days after shock
and vibration test
25. | Switch Board Six 5 days for initial O1Nos | NA NA Item is under
cabinet for months | testing development.
power control 3 days after shock
panel of 2 x 450 and vibration test
Kw High
Capacity DA set
LHB type
Generators car
26, | exible Six [3 days for inital | 3_meter | NA] NA Conduit
polyamide months. | testing of cach Size
conduits with its | type Qty
end fittings & adessm her ah00k org meter
i ‘and vibration test,
accessories with end ei
finings
2100
i) NWR
30000
i) NWI7
21000
iy) NWO
75000
| yNw29
10000
w)_NW36
14000
Niwas
| 2100
End fii
Fea fee]
Issued by ICOTBOS00H: 2008] Document Nos PEWITIS | Version Noa Date Eective: 09/01/2058
Document Title: Procedure Yor Vendor Development.
Numbers
NWO
1300
i) NWR
1400
NWwI7
6800
ivy N23
20000
y N29
2300
vi) NW36
7100
vil) NW48,
1300
27. | Microprocessor Sdaysfor initial | O1 NA | NA | 60Nos
control unit of testing
LHB type RMPU 3 days after shock
& Double and vibration test
decker coaches
Issued by ICO Page 13 of 19SoBeHi Tom [Barun NOT PEWCTES | verion NTA Date Eifective: 03/01/2018
Document Title: Procedure or Vendor Development.
PE-RP-8.23-4
FORMAT FOR LETTER OF ADEQUACY OF CAPACITY-CUM-CAPABILITY AND TECHNICAL
REQUIREMENT FOR DEVELOPMENT OF PROTOTYPE
(To be issued on RDSO letter head)
FAX
File No. Dated:
Mis
Office Address,
e-mail address: ~
Factory Address.
Sub:
Ref
Capacity cum capability and schedule of technical requirement of the firm for development of the
item jave been found to be adequate. Further to this following steps should
bbe adhered to
1. The firm must submit drawingsidesign details for approval by RDSO.
2. _Ater approval of drawings/design by RDSO, development of prototype should be undertaken.
3. Inspection call along with internal test results, test protocol and bill of material shall be sent to
RDSO for witnessing of prototype testing at your works by RDSO representative when the
prototype is ready.
4, Product should be manufactured in accordance with the latest RDSO's Specification and latest
Drawings,
In view of above, itis advised to offer Prototype sample at the earliest. However, the firm must keep
in consideration the facts that if they fail to offer Prototype sample within a period of six months from the.
date of issue of this letter, their case shall be closed as per Para-4.8 of ISO Doc No. Q0-D-7.1.6
Version-14.1 effective from 05.12.2017, This is a clearance for development of prototype only and not for
inclusion in “ist of approved vendors” or in “list of RDSO vendors for developmental orders”.
Please also note that Development of Prototype for as per RDSO Specification No.
is without any commercial commitment from RDSO|
Signatures with Seal
Unit Officer
Format no. QE-F_7.1.7 Version 1.0
5 BS
fs Prépared fy 10S ao To TSB]1503001: 2008] Document Nos PEW | Version N40 Date Erect: 09/01/2018
Document Title: Procedure for Vendor Development
GOVERNEMNT OF INDIA
MISNISTRY OF RAILWAYS
RESEARCH DESIGN & STANDARDS ORGANSIATION.
POWER SUPPLY & EMU DIRECTROATE
‘SCRUITNY SHEET (For frosh vendor registration)
Item for which applied for fresh registration
Firm's nam:
(Proprietorship/PartnershipiRegistered company/Joint venture/Foreign Collaboration)
Category of vendor (GEN/Reserved)
(Micro Scale/Small scale/Medium scale/Large scale)
Vendor ID Code Date of application .....
‘Specification No,
STR No. ee
SN Document details ~SNof Remarks,
the filo
1 | Application form for fresh registration on
standard format
‘Copy of e-payment receipt
180 800171SO 9007 cerificate
3.1 | Whether ISO covers the tem for which firm is
tobe registered
32 | Whether office and Works Address of firm on
180 certificate matching with the address in
pplication form
33 | Validity of ISO certiicate(ISO expiry date)
Validity of Factory license
MSME (SSI) registration ( f applicable )
Electricity bil
‘athorization Teter (Fapplcabiay
Clause by clause compliance of STRFims
self-compliance Verified by assessing officer)
9 | Annexure to STR(List of Machinery & plant
and instruments)
91 | MOU with sub vendor on Rs. 100 Non
judicial stamp paper if applicable)
9.2 | QAP of sub vendor f applicable
9.3 | M&P list of sub vendor W applicable
issued by ICO Page 17 0F19))1503001: 2008
Document NosPEWLTI-S | Version Nos #0
Dake Elective (3/01/2018 |
Document Tite: Procedure for Vendor Development,
94 | 180 cerificate of sub vendor f applicable
70 | Digital signature certificate
11 | Undertaking against cartel formation
12 | QAP as per standard format section A to
section H.
721] _Ust of employee as required in STR
722) Valid Calibration —_cerificates from
NABLINABCB accredited Lab
13 | Legal document Annexure AT i applicable
78:1 | Legal document Annexure AZ
732] Legal docurient Annexure AB
783) Legal document Annexure Ad along with
Annexure 18 2
734 | Legal document Annexure AS
a
(2)
In the remarks columns:
If laid down standards/requirements are met, ‘OK’ should be indicated otherwise deviation
‘observed/permitted should be indicated.
|n case any item as above is not relevant to the case, NA should be indicated
Name, Designation & Signature of the Scrutiny Official with date:
Name, Designation & Signature of the controling officer with date:
eS
Preparedfy IGS issued by ICO
Page 18 of 19"5090012008 Document Nos PEWTI- | Version NOD
Date Eectve: 09/1/2018
Document Tite? Procedure Yor Vendor Development.
Distribution List
S.No.
Copy Holder
Copy No.
ED/PS & EMU
Dir/Conv. EMU System Design
DinPE & Battery
Din’TL & AC System Design
DiriMetro
DinMRVC
Pree ES Sees
ADE/DDiDoe
al of uf a] of 19)
Tssued by ICO
Page 19 of 19