Professional Documents
Culture Documents
MOM Dabur
MOM Dabur
Cable dressing
Paint Touch up where ever required
Nitrile insulation where required as per design at time of dispatch
Panel query to be reverted fan and VFD commented drawing by Jacobs to be discussed
wtih design team.
(
Main Incomer also as per Jacobs comment.
No separate MCCB for each VFD.
Individual Fan Isolation.)