You are on page 1of 1
033 + R4G-70-CQM-FMT-PR-002_ 3 Rev. Date: 1" Feb 2014 | Inspection Report - R4G Project . RAG.70-COM-TP-PR-002 Foundation Bolt soft - IFC Drawing No, and Rev.: Vendor Name: Bolt Size: X 53a v00£NB-0000-010 | Cipdarneré Con turing — | Quantity = 6 Documentand Process Check: Fain ~~ Description - Details Observed Raw Material Used (As per specifications) Hign Tralt Sel « Material Test Report (check material test report as per IL. specification) ot Physical and Visual Inspection: sr. Specifications / No. Description Observation | Remark A/B/C/0 NA | mi RP mm | Mmm | Mtezabls 3. piameter of foundation bolt SED rm 4. [Threaded Length ofthe bolt MP mm MAmm | Mulexofty 2.mm | Be.mm | fos No Rust , Cracks or 1. [Type of Foundation Bott 2 ffotal Length of the foundation bott nm, 5 |uut Thickness rack on v7 No 6. [pny ust o damage/erack on bot pas 7 7 ree movement of Nut and Lock Nut Freemovement | ¥&/No A DM mtrons | .MNECmirons | OAPI 8. |Galvanization Thickness ( Wherever Applicable) 9. [Galvanization done on threaded portion. sual Inspection, | OPA OK observations &Comments: Contractor's representative ield Engineer _ Signature Date

You might also like