Ce 220511 Quantity Surveying and Costing 1 May 2018 PDF

You might also like

You are on page 1of 4
inted Pages—6 + 1 sheet Printed Page Roll No. 220511(20) 020611(20) Diploma in Engg. (Fifth Semester) Examination, April-May 2018 . (Old Scheme) (Civil Engg, Branch) QUANTITY SURVEYING & COSTING: Time Allowed : Thee hqurs ‘Maximum Marks : 100 Minimum Pass Marks: 35 es wnt ner ae ct atfrard Bye Tatts fwey Re ob by faved oh ware & ee ie Pe at fee sitter 3 se wt itor er ae BE rey am WD a er ahem aH re Note + All questions are compulsory. Internal choices ‘have been given in questions. In case of any doubt or dispute the English version question should be treated as final. If any data is missing assume suitable. e8VTUonline.com Ae PIS war a at ay anger Fes wT #2 eSVTUonline.com 220S11¢29y02061120) 5 3 121 C8VTUontine.com What is the principle of units for various item of works? faa aR Ree fry Rar were fab ara att (aE ert she, i) Ta Fra ste Gin 8 ea eA ae (iv) faa i ead (v) stats BF What is the basis of preparation of stte- estimate for different type of structure Water supply project (Building projects (i) Roads and Highway projects (0) Bridges and Culver, (0) Overhead Tanks Profan art & sree gant fer Fag ai Gi) Tern wz CSVTUonline.com -220511(20)/020611(20) 13) €SVTUonline.com go ets fs et (nett oD oy 6a Fore are, Wie down the measurement units fr following item of work 6 Sung couse (a Roling shuter (i Reinfred Brick work (9 Eave Boards (in Rocfing) (0) Thin Patton wall 4 shone 2 Fe fr met RABE seat ‘ing wifed ah effetti orem What is C'.R.2 alist the various information avaiable inthis explain all terminologies S. fri 10 ot at, 20 at A 3 # at ee fat eh og 4 er HE ST Shee wate ange sar TIENEN ity of sand and comet of 10 eat, 20 cement ora 16 Calculate the No. of bricks a ‘equired fora brick masonaty ¥* w 0 v0. CSVTUonline.com CSVTUonline.com | 4) 6. (a) Vente fa — @ aT Gi) sires ae Define @ Task Gi) Overbead Cost oy Freitag 77 % fire fet ‘efit — wo ew ad atte ak TTT ang oe Be Fmd ete eet @ aR ee Gin eer 3 He fae Gy Aite wate (12224) oy we feet ge HH yrs down the tesk for any artisan for following (Brickwork io CM. in foundation iy. Brikwork in Mud-Monar in super structure (ai) Brickwork in Juchearches (iy) Cement-Conerete (15234) (09 Barthwork in excavation ia hand soit 220811 20)/02061120) ‘CSVTUonline.com CsVTUonline.com 151 CSV TUonline.com 161 1. Prien afar By ye rd aw we 0 Take width of Road= 10.0 m, side slopes in = cachwork= 2:1 (11: V), Draw Lescetion and ross a sh seein ao_| fs a7 aria me soction for roadwork, ° 155.00 #, 15650 2» asso fe FET tae Fs rT A 60 1ss.45 HAL (i) ts ga are 90 155.90 1: 200 a ret @ AAA Case) tae 120 196.20 a ta oe fe feent a wd 130 15520 4 (iy BONA, (12:4) we, vee ge) stgd 100 A, ade Te, figt ani T21 oy wegen te Real wa e fea (Gerda Ul te ee tow ford ay coterie wt wo Pateulate the qiantty of earthwork from the following cavige te ely Calculate the quantities of the following items data [Chaimage RL. of Ground RL. of Formation] (Refer fig.1) ° 15500 aso (9) Eachwork in excavation » 155.60 m. GH PCC. (1:4: 8) in base 0 15SAS- J (iii) Brick masonary upto plinth A 155.90 Down Gradient (iv) D.C, work (1:2: 4) in plinth 120 156.20 m. of 1: 200 (V) Brick work im super structure 150 136.05 J (i) Abstract ofall items m. SVTUoniine.com se) SVTUonline.com 2ausH 420206120) " 2znstIanye2061120) ‘SVTUonline.com een rr (torr) drineRony Debs an0strayo7061120)

You might also like