You are on page 1of 3
‘Sth, CORKIGENDA_& ADDENDA FORSCAEDULE OF RATES P.W.D.(1)B) w.e-f 16.04.1019 Volume -I (for building, materiai & dabour) 2 mee ‘SECTION 1. BUILDING WORKS (A) EARTH WORK, ANTITERMITE TREATMENT a ‘Rate (RS) = | > i 2 | dels | Le ‘ 38 Hi} a a sali | 3 = 3 eilalé 3 q i aay leet le Hide) i e|< Description of hems ow | &3/33) 2] F aiilg i es|es|'s| 4 |g Pia eelda/ 2) a] 2] aa] aged]? Hida) ak i 3 |ii Cie 3s| 3 ag] as |i] i 4 ay : a | Belee 2 PEaE Paes 3 : Hi |G s gs a 1 fy 3 a\s | > cinco ng i oan 0 Fh By ver rd wrt nt ecg 136 tan er cl ond cece ope ee ee ci compe aching ar cura 2 |supply of sand. (payment to be made on in place of & |nearrement fished quanti) 3 | Do- ty fneson! ci [ame ses [oa [ara [prot | 7a [snes [rer [vrai [re [ar [rear | e7 [es [Se 1) tng fenton pe Hr so a ~ |layers not exceeding 150 mm as directed and |consofidating the same by thorough eaturaion with E|vatr, ramming complete including. the cost of| = lsupply of sand (payment to be made on please reod |measurement of finished quantity) ae scm sre [sane 72s5] sass ]osves| 9573 [sor | 7 [ose ]osrs] srs | eens] rave [sane] zis ‘inplace of please read Item no.17 , Page no. 16500315 [M.F. suspended ceiling made with 12.5 mm thick Gypsum plaster board] including G.t perimeter channel of 0.55 mm flush (having two flanges} 120 mm and 30 mm respectively and web 27 mm ) along with perimeter] fof cciling.with G1. intermediate. channel. of 0,9-mm-thick size 45}. JmmxtSmm placed at 750 mm e/e with GJ. ceiling angle of size 25| }mmx1Ommx0.55 mm thick fixed tothe ceiling with G1. Cleat and steel Jexpansion fastener ceiling section 0.55 mm thick of size 51.50) Jmmx26mm fixed to the intermediate channels with the help of Jconnecting clip and inthe direction of perpendicular to the intermediate] Jchanne! of 300 mm clc 12.5 mm thick Gypsum plastered board ae to be] fixed under ceiling section as above by machine screws, The boards are to be joined and finished with jointing compound, paper tape and| lapplication of top coat etc. as per the direction of Engineer-in-charge |(The rate includes of cost of all materials including taxes, cost of laccessores, fittings and fixtures, scaffolding and labour charges etc |complete) lin ground floor Providing and fixing false ceiling at ll height including providing and fixing of ame work |made of special sections, power pressed from M.S. Sheet and galvanized with rinc coating of| 130 gms/sqm (both side inclusive) as per IS: 277 and consisting of angle cleats of size 25 mam| wide x1.6 mm thick with flanges of27-mm and 37 mm, a 1200-mm centre to centre one Mange fixed tothe ceiling with dash fastener 12.5 mm dia x $0 mam long with 6mm dia bolts, other flange of cleat fixed tothe angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate. {channels 45x15x0.9 mm running atthe spacing of 1200 mm centre to centre, to which the citing section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each [navn lips of 10.5 mm, at 450 mm centre to centre, shall be fixed ina direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x [230 mm long G.1. wire at every junction, including fixing perimeter channels 0.5 mm thick }27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall partition with the help of rawi plugs at 450 mm centre, with 25 mm long dry wall screws [@230 mm interval, including fixing of gypsum board to ceiling section and perimeter |channel withthe help of dry wall screws of size 3.5x2S mmm at 230 mm ee, including joining [and finishing to a flush finish of tapered and square edges ofthe board with recommended jointing compound, jointing tapes, finishing with jointing compound in'3 layers covering |< lupto 150 mm on both sides of joint and two coat of primer suitable for boar, ll as per |manufactur's specification and also including the cost of making openings for light fittings, erils diffusers , cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction ofthe Engineer-in-Charge bt excluding the cost {of painting with: (ISI Mark on Board) PTO: NEW [Providing and applying 12 mm thick (average) premixed formulated one coat gypsum lightweight plaster consis of additives and light weight aggregates eg. vermiculite / perlite respectively conforming to 1S:2547 (Part - 1 & Il) 1976, applied on hacked / uneven| Sqm.| 195 Jbackeround such as bare brick/blocl/RCC work on walls & ceiling at all floors and| Vocations, finished in smooth line and level et. complete. 195 |195] 195 | 195] 195 |195| 195, 195 195] 195] 195 | 195 |195| 195 ee goal ‘TAPASH KRCDEY Superintending Engineer Bridge Planning. Circle Member of Cmbined ‘Schedule Committee PW Die. & ‘PW Roads) De. A Wa GOUTAM ADA} ‘Superintending Engineer Survey & Design Circle Member of Combined Schedule Committee PW Die. & PW(Roads) Dte. EP. SANKAR BOTTA Superintending Engines Planing Monriag Ce Cortera Conoed Sctedle Connie PW De & Puan De Oy IF v Muy HoPpADHY A TAPASIL MUKHAPADAY Shonen Cer racer Wosbee Coed Settle ae PB ee

You might also like