‘Sth, CORKIGENDA_& ADDENDA
FORSCAEDULE OF RATES P.W.D.(1)B) w.e-f
16.04.1019 Volume -I (for building, materiai &
dabour) 2
mee ‘SECTION 1. BUILDING WORKS
(A) EARTH WORK, ANTITERMITE TREATMENT
a ‘Rate (RS) =
| > i
2 | dels
| Le
‘ 38 Hi} a a sali | 3
= 3 eilalé 3 q
i aay leet le Hide) i
e|< Description of hems ow | &3/33) 2] F aiilg i es|es|'s| 4 |g
Pia eelda/ 2) a] 2] aa] aged]? Hida) ak
i 3 |ii Cie 3s| 3 ag] as |i] i
4 ay : a | Belee 2 PEaE Paes
3 : Hi |G
s gs a 1 fy 3
a\s | >
cinco
ng i oan 0 Fh By ver rd
wrt nt ecg 136 tan er cl ond
cece ope ee
ee ci compe aching ar cura
2 |supply of sand. (payment to be made on in place of
& |nearrement fished quanti)
3 | Do- ty fneson! ci [ame ses [oa [ara [prot | 7a [snes [rer [vrai [re [ar [rear | e7 [es [Se
1) tng fenton pe Hr so a
~ |layers not exceeding 150 mm as directed and
|consofidating the same by thorough eaturaion with
E|vatr, ramming complete including. the cost of|
= lsupply of sand (payment to be made on please reod
|measurement of finished quantity)
ae scm sre [sane 72s5] sass ]osves| 9573 [sor | 7 [ose ]osrs] srs | eens] rave [sane] zis‘inplace of
please read
Item no.17 , Page no. 16500315
[M.F. suspended ceiling made with 12.5 mm thick Gypsum plaster board]
including G.t perimeter channel of 0.55 mm flush (having two flanges}
120 mm and 30 mm respectively and web 27 mm ) along with perimeter]
fof cciling.with G1. intermediate. channel. of 0,9-mm-thick size 45}.
JmmxtSmm placed at 750 mm e/e with GJ. ceiling angle of size 25|
}mmx1Ommx0.55 mm thick fixed tothe ceiling with G1. Cleat and steel
Jexpansion fastener ceiling section 0.55 mm thick of size 51.50)
Jmmx26mm fixed to the intermediate channels with the help of
Jconnecting clip and inthe direction of perpendicular to the intermediate]
Jchanne! of 300 mm clc 12.5 mm thick Gypsum plastered board ae to be]
fixed under ceiling section as above by machine screws, The boards are
to be joined and finished with jointing compound, paper tape and|
lapplication of top coat etc. as per the direction of Engineer-in-charge
|(The rate includes of cost of all materials including taxes, cost of
laccessores, fittings and fixtures, scaffolding and labour charges etc
|complete)
lin ground floor
Providing and fixing false ceiling at ll height including providing and fixing of ame work
|made of special sections, power pressed from M.S. Sheet and galvanized with rinc coating of|
130 gms/sqm (both side inclusive) as per IS: 277 and consisting of angle cleats of size 25 mam|
wide x1.6 mm thick with flanges of27-mm and 37 mm, a 1200-mm centre to centre one
Mange fixed tothe ceiling with dash fastener 12.5 mm dia x $0 mam long with 6mm dia bolts,
other flange of cleat fixed tothe angle hangers of 25x10x0.50 mm of required length with
nuts & bolts of required size and other end of angle hanger fixed with intermediate.
{channels 45x15x0.9 mm running atthe spacing of 1200 mm centre to centre, to which the
citing section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each
[navn lips of 10.5 mm, at 450 mm centre to centre, shall be fixed ina direction
perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x
[230 mm long G.1. wire at every junction, including fixing perimeter channels 0.5 mm thick
}27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall
partition with the help of rawi plugs at 450 mm centre, with 25 mm long dry wall screws
[@230 mm interval, including fixing of gypsum board to ceiling section and perimeter
|channel withthe help of dry wall screws of size 3.5x2S mmm at 230 mm ee, including joining
[and finishing to a flush finish of tapered and square edges ofthe board with recommended
jointing compound, jointing tapes, finishing with jointing compound in'3 layers covering |<
lupto 150 mm on both sides of joint and two coat of primer suitable for boar, ll as per
|manufactur's specification and also including the cost of making openings for light fittings,
erils diffusers , cutouts made with frame of perimeter channels suitably fixed, all complete
as per drawings, specification and direction ofthe Engineer-in-Charge bt excluding the cost
{of painting with: (ISI Mark on Board)
PTO:NEW
[Providing and applying 12 mm thick (average) premixed formulated one coat gypsum
lightweight plaster consis of additives and light weight aggregates eg. vermiculite / perlite
respectively conforming to 1S:2547 (Part - 1 & Il) 1976, applied on hacked / uneven| Sqm.| 195
Jbackeround such as bare brick/blocl/RCC work on walls & ceiling at all floors and|
Vocations, finished in smooth line and level et. complete.
195 |195] 195 | 195] 195 |195| 195,
195
195] 195] 195 | 195 |195| 195
ee goal
‘TAPASH KRCDEY
Superintending Engineer
Bridge Planning. Circle
Member of Cmbined
‘Schedule Committee PW Die. &
‘PW Roads) De.
A Wa
GOUTAM ADA}
‘Superintending Engineer
Survey & Design Circle
Member of Combined
Schedule Committee PW Die. &
PW(Roads) Dte.
EP.
SANKAR BOTTA
Superintending Engines
Planing Monriag Ce
Cortera Conoed
Sctedle Connie PW De &
Puan De
Oy IF v
Muy HoPpADHY A
TAPASIL MUKHAPADAY
Shonen Cer
racer
Wosbee Coed
Settle ae PB
ee