ARDES 7:
A Research in Philippine Housing
Submitted by:
Cruz, Francesca Marie DJ.
Submitted to:
Arch. Juney G. Agron
Table of Contents
Every Filipino family has the right to live with dignity in the comfort of one’s own home
regardless of economic status. With full government support, we, the housing industry,
envision to eliminate the housing backlog by the year 2030
o 1 million homes for 2012–2016 o 2 million homes for 2017–2022 o 7 million homes for
2023–2030
HUDCC. Created in 1987 through Executive Order (EO) 90, the Housing and Urban
Development Coordinating Council is the overall housing overseer of the government,
providing the policy directions and coordinating mechanism for other housing agencies
like the following:
Industry Associations:
SHDA is the largest organization of housing developers in the Philippines, counting 160
members from its chapters in Luzon, Visayas, and Mindanao.
Founded 33 years ago by a group of licensed real estate brokers, REBAP pursues its
objective of “professionalizing the real estate industry and raising the level of ethical
standards of licensed real estate practitioners.” This Association has more than 1,200
members (both regular and associate) from its 27 chapters in Metro Manila and other
provinces.
PAREB is the oldest and largest real estate service organization in the country, tracing its
beginnings to as early as 1938. It is now composed of 57 member-boards that are
strategically located in 4 regions in the country and more than 3,600 members.
NREA was born in 1991 as a “one-stop trade organization in the real estate industry,”
with members from major real estate economic contributors and participants;
government agencies that regulate, license, and oversee the industry; and legislators
who are supportive of the urban and housing developments.
SUPPORT TO INDUSTRY DEVELOPMENT
Incentives
Under RA 7279 – Urban Development and Housing Act of 1992 Section 20 of RA 7279 or
UDHA of 1992, provides the following incentives for socialized housing developers to
encourage greater private sector participation in socialized housing and further reduce
the cost of housing units for the benefit of the underprivileged and homeless:
2. Creation of one-stop offices in the different regions of the country for the processing,
approval and issuance of clearances, permits and licenses: Provided, That clearances,
permits and licenses shall be issued within ninety (90) days from the date of submission
of all requirements by the participating private developers;
5. Donor’s tax for both lands certified by the local government units to have been
donated for socialized housing purposes.
Developers of low cost housing projects registered with the BOI are entitled to the
following fiscal and non-fiscal incentives:
2. Duty-free importation of capital equipment, such as but not limited to the following
eligible equipment under EO 70:
a. Lift /Elevators (for medium and high-rise buildings) b. Tower Crane and its accessories
c. Concrete Steel Formworks d. Stand-by Power Generator e. Various Forms such as
Foundation, Modify, Tunnel, and Facade Forms
HDMF is now the government’s main provider of housing loans. HDMF now offers a
credit ceiling as high as PhP2.5 million to its qualified members. HDMF is under pressure
as the recent fall in lending rates and the better payment terms in the financial market
have attracted many of its members to the private commercial and thrift banks. For
instance, HDMF is contemplating lending rates of 4.5%, down from the 6% fixed interest
rate that it usually charges its members.
Board of Investments.
By far, the only significant government support extended to housing comes in the form
of a BOI income tax incentive granted to developers of horizontal and vertical mass
housing units. To keep costs down and the units affordable, more and more developers,
especially of condominium structures have applied for and availed of this incentive,
which is reviewed annually by the government.
NHA Guidelines
CONCEPTUAL FRAMEWORK
SITE PLANNING
SITE SUITABILITY AND DETAILED
SITE SELECTION
DESIGN
On the other hand, Site Planning and Detailed Architectural and Engineering (A&E)
Design process can be conducted only for sites that have been evaluated as suitable
for housing, regardless of enhancements or mitigating measures that still need to be
undertaken prior to construction.
SITE SELECTION
The site selection process covers the identification of locations that are appropriate for
housing development. It involves the urban and regional context analyses, with
consideration of these factors:
The objective is to undertake a purposive site selection, instead of being reactive to the
escalating demand for housing under the NHA's mandate.
Responsible Units. The task of site selection shall be done through the collaboration of
operating units with the Housing Technology Development Office (H TDO) and other
units of the NHA who may submit inputs towards the selection of sites for housing, as may
be required.
The HTDO shall issue the guidelines for the operating units and other NHA departments
in the submission of prospective sites. It will be responsible for convening the responsible
units in preparing the HSM, for consolidating the maps, for submitting it for approval of
the General Manager and for notation by the NHA Board of Directors, and for causing
the review and update of the map. The HTDO shall ensure that the map remains a useful
reference at any time the NHA would require sites for housing.
Deliverable. The output of planning is a Housing Sites Map (HSM), which shall be the
mapped out locations of housing sites for at least the next 3 years, identifying if not exact
locations, the indicative areas within specific municipalities/cities whose urbanization
capacities can accommodate housing requirements of the population. This will be the
guiding reference for the annual work program and budget of NHA. It shall also be the
reference for land banking if it will be pursued for future expansion, or for emergency-
induced relocation (e.g., due to calamities or siege). It may be continuously updated
subject to the usual and proper evaluation of any additional sites to be included
A longer term plan, say for the next 6 or up to 30 years, may be programmed, provided
this is supported by sound bases, or that the maps make reference to, and correspond
to timeline of, approved longterm plans of the national government.
The resulting map shall as much as possible indicate the type of density that is most
applicable for every selected site. Minimum data that shall be included for every site
are the barangay on where it is located, ownership, land area, and zoning.
The HSM shall be approved by the General Manager prior to its adoption. Any
subsequent addition to the approved sites in between updating period shall be subject
to approval of the General Manager upon recommendation of HT DO
Timeline. There shall be an updated HSM every three years which period shall coincide
with the Medium Term Philippine Development Plan (MTPDP) and its midterm. The
approved HSM shall have been prepared and made available at least 3 months before
the period covered by the said MTPDP and its midterm, so that it can be used in work
programming for the succeeding year.
Site Selection for Emergency Cases. Sites of permanent housing for victims of calamities
and other emergency situations shall be selected from the HSM, unless concerned local
government unit/s will be able to provide suitable land from its/their respective
jurisdiction. The NHA shall be able to recommend sites for temporary housing within half
month, and for permanent housing within I month the affected settlers are displaced or
the settlement/s has/have been determined as inhabitable requiring the relocation of
settlers.
References and Tools. The planning may be guided through analysis and study of the
following information, among other useful data and tools it may deem significant in
planning:
A. National Framework for Physical Planning (NFPP) and MTPDP, and such
other national plans that may have impact on land uses,
B. Land Use or Zoning Maps and/or Comprehensive Land Use Plans (CLUP) of
local government units (LGUs);
C. Geological Hazard Maps generated by Mines and Geoscience Bureau of
the Department of Environment and Natural Resources (MGB-DENR) and
Indicative Hazard Maps from PHIVOLCS; and such other hazard maps from
reliable sources like DOST's Project National Operational Assessment of
Hazards (NOAH) and data from Manila Observatory;
D. Ongoing and approved projects for implementation from institutions like
the Department of Public Works and Highways (DPWH), Philippine
Economic Zone Authority (PEZA), Department of
Transportation and Communication (DOTC);
Guiding Criteria. Site selection will have, but will not be limited to, the following
coverage and corresponding criteria.
a. Location. Site selection must be made with both the regional and local context
in mind. Proposed sites must be able to link into existing public infrastructure, such
as transportation, power and water, health, educational and recreational
facilities, and as much as possible be near or accessible to major employment
opportunities. Sites shall be located outside potential hazard prone and
protection areas.
b. Conformity with Land Use. Sites to be offered for housing development should be
residential in land use classification based on the approved CLUP of the
concerned LGU. Should there be no approved CLUP for the locality, the same site
must be approved for housing development purposes by the concerned LGU's
Sangguniang Bayan/Panglungsod. Land use conversion and reclassification must
be approved by the Sangguniang Bayan/Panlungsod prior to inclusion in the
map.
c. Accessibility. The sites should be able to link to an existing or proposed public
transportation system. The sites must likewise have an existing legal road right of
way from a major thoroughfare.
SITE SUITABILITY
Site suitability looks at the intrinsic and specific technical qualities of the site and its
capability to address the requirements for housing. This process involves determining
the potentials, constraints and development issues the site may create.
Coverage. All sites of housing projects targeted for implementation based on NHA's
annual work program and budget shall be the priority sites to undergo suitability
process.
While properties included in the HSM are presumed as legally permissible for residential
development, the operating units undertaking site suitability shall exercise due
diligence in determining that there are no legal issues with the subject property
For sites not included in the HSM (e.g., new sites offered for housing development by
other entities such as local government units, other agencies, private developers or civil
society organizations), the concerned Project Office shall still carry out the site
inspection and suitability analysis.
Responsible Unit/s. The complete staff work of the site suitability undertaking is lodged
with the Project Office concerned, with the support of District and/or Regional Offices.
Ocular inspection of subject site is ideally conducted by a team from the Project Office
identified to be involved in the project with presence of the landowner or his/her
representative/s. Complements from other NHA units shall likewise be invited to the
inspection when their assistance is sought for site suitability and/or site planning
processes. The same team from the Project Office will also be responsible in preparing
the deliverable reports of this process for submission to the Regional Office concerned.
Deliverables. The process of site suitability shall entail the accomplishment of these
documents.
Site Inspection Report. A copy of the Site Inspection Report (SIR) form is attached
in this circular as Annex A. After securing the required documents and actual
ocular inspection, the form will be filled out to include analyses and
recommendations. Once duly accomplished, the output will provide a profile
with enough information to assess its suitability and a basis for appropriate
development planning. It shall contain analysis and recommendations as to the
site's suitability for a housing project.
Pre-Feasibility Study with Conceptual Plan. Pre-feasibility study is a study
conducted before proceeding with a full-blown feasibility study which is an
analysis of the viability of a project. It saves time and money in contrast to
conducting an FS. A copy of the prescribed form/outline of the PFS is attached
as Annex B for vertical development and Annex B-l for horizontal development.
Timeline. All applicable required documents (see Annex C for the checklist) must have
been secured prior to the conduct of site inspection. Within 5 days from the date of
inspection, the SIR must be submitted by the Project Office to the Regional Office. Then
the PFS with Conceptual Plan shall soon follow the submission of SIR within a period of 1
month.
Cadastral Mapping — to determine the metes and bounds of the site, extents of
adjoining properties, property overlaps and definition of legally-demarcated
waterways.
Topographic and Slope Analysis to determine unusual characteristics of the site
such as depressions, ravines and mounds. It is imperative that the topographic
survey extend beyond the boundaries of the site. Plotting various gradients of the
land shall be done to determine buildability.
Elevation Analysis — to relate the site to mean sea level especially for coastal
danger zones as well as to relate to airport aerodromes which may affect building
heights.
Waterways and Drainage — to plot out the paths of rivers and creeks along the
boundaries or within the site.
Vegetation Analysis — mapping of types, coordinates and base elevations of tree
locations with trunk diameters of 20cm and bigger.
Tools. The conduct of site suitability is aided by the utilization of such tools as mapping,
geographic information system (GIS), map overlays, and the SIR form. The output shall be
the Site Inspection Report, complete with analysis and recommendations as to the site's
suitability for a housing project.
Topography
Topographic survey shall extend beyond site limits in accordance with these
prescriptions:
Topography must be relatively flat and slopes of proposed sites should not exceed the
15% maximum gradient considered as buildable slopes for housing development. For
sites with rolling terrain, there should be least filling requirement that should not exceed
the cost parameters set by the NHA for a developed lot
Slope
For projects with above 300 to 600 units per hectare, slope should be below 5%.
For projects with density of 300 units and below per hectare, sloping area could
be 5% to 15%.
Sites with sloping area should be developed at a reasonable and affordable
cost, with the
assurance of soundness and structural stability for vertical construction.
Facilities
- Water Supply
The site must have a steady and sufficient supply of potable water and that the
sources of such
a supply should also be established whether it is from a local water company or
from the ground or any other alternative source prior to project planning.
Secondary data may be provided such as water testing results in the
immediate vicinity of the proposed site to determine the potability of water in
the area. Water supply must be provided and ensured in conjunction with the
program schedule of the local water service provider. Certification as to
secured.
- Power Supply
There must be a utility company that will serve the needs of the new
community, and that access for power facilities to and from the site must be
identified as a requirement for the approval of the identified site for housing
project. Provision of these facilities is imperative in the selection of site. Power
supply must be provided and ensured in conjunction with the program
schedule of the local power service provider. Certification as to its availability
must likewise be secured.
- Drainage Outfall
Natural waterways and outfalls shall be established on ground and as far as
practicable identify the legal access with regard to outfalls, to and from the site
to facilitate the planning of the drainage system. Flooding levels of the
identified sites and its immediate vicinity should also be determined prior to site
planning. The natural waterways should be retained in order to preserve the
ecological balance within and around the site. Drainage outfall should be
extended directly into the main waterways. Certification of availability of a
legal right of way for the drainage outfall from the project office, lot owner, or
local government unit concerned shall be submitted.
A site that has been deemed not suitable for housing, and where no measures
can be feasibly undertaken to make it so, shall find replacement from the
inventory of Housing Sites Map. Should another new site be proposed for the
given project, it has to go through the full site suitability process and it shall not
be considered unless found to be suitable for housing.
SITE PLANNING
Site Planning is undertaken after satisfying the first two processes of Site Selection and
Site Suitability. It shall only be commenced for sites considered to be suitable for
housing development, and shall consider the proposed enhancements and mitigating
measures to be conducted during pre-construction and construction phases of the
project as indicated in the Site Inspection Report.
Responsible Unit/s. Site Planning and Detailed A&E Design process, like Site Suitability, is
to be undertaken by the Project Office, with the support of concerned Regional
Offices. Assistance for review of prepared plans may be requested from the H TDO.
However, mandatory review by
HTDO shall be required for projects: above, b) with multi-storey buildings, calamities and
other emergency situation.
Deliverables. The output of this process will be the site development plan, complete
with detailed drawings, costing, and technical specifications, for approval and
signature of the NHA General Manager or delegated authority prior to implementation.
Site Development Plans and other Land Development Plans shall be signed and sealed
by the appropriate licensed professionals, on the original copy prior to approval, such
as the following:
Timeline. The project proposal consisting of the above shall be approved 2 weeks
before the target pre-procurement schedule of the project. Operating units,
depending on the size and complexity of the project may require a varying length
of time in preparing the site plans. On a regular project, they are advised to
allocate a maximum of 6 months for preparing the project proposal.
Site Planning Principles. As a rule, the basis for planning of all economic and
socialized housing is the 1m Implementing Rules and Regulations of Batas
Pambansa 220 (with the last revision by the HLURB in November 2008), On
providing accessibility for the Batas Pambansa
persons with disabilities, the Presidential Decree 1096 or the National
Building Code, and the Republic Act No. 9514 for fire code requirements.
However, in order to come up with a more responsive program as well as a
clearer definition of land development infrastructure for the socialized
sector and the low-income, the following guidelines shall be adopted.
Compliance to Existing Laws, Rules and Regulations. All site planning must be in
compliance to existing laws, rules and regulation on housing, whether local or
national. In cases of conflict, the more specific provision shall prevail over the
general ones
Adoption of the Green Infrastructure. Planning shall adopt greenbuilding and the
preservation of existing natural assets of the land such as trees, ground cover
and vegetation, and natural waterways.
Land Use Allocation per Site. The land use allocation for each site should not go
beyond the ratio of 60% net saleable area and 40% non-saleable area, broken
down into the following:
For Saleable Areas. The net saleable shall consist of a maximum of 60% of the
total gross land area and shall be devoted for residential housing development.
For Non-Saleable Areas. The non-saleable areas shall conform to the minimum
requirements pursuant to Section C of BP 220 as amended.
The non-saleable areas consisting of a minimum of 40% of the total gross land
area shall be devoted for other uses as follows.
- Circulation/ Road Network
- Parks and Playgrounds
- Community Facilities
- Utility Areas (MRF, STP)
Maximum Allowable Density per Hectare. The maximum allowable density per hectare
for horizontal development shall be 150 lots/units per hectare.
For vertical development or low rise buildings (LRBs), maximum density per hectare shall
be as follows
Maximum Density # of
LRB Model
units er hectare
2-Store LRB 192
3- Store LRB 252
4- Store LRB 336
5- Store LRB 420
Lot and Building Orientation. Orientation should be considered to maximize solar
orientation and breeze access. If locating on sloping sites, this criterion needs to be
weighed against slope orientation criterion in order to reduce earthworks.
It is prescribed that orientation of lots and blocks is guided by the slopes of the site, to
wit:
For relatively flat lands, or 0-4% slope, orientation shall be guided by solar orientation, at
which direction it will be most beneficial in terms of passive lighting and cooling
For sites over 4% slope up to 15% slope, ensure earthworks is minimized by considering
both right of way and building pad orientation. The long axis of building pads should run
parallel to the contours to minimize retaining wall heights. Roads can run perpendicular
to the contours up to the 15% maximum road gradient. This can reduce the need for
earthworks by allowing each building pad to be progressively stepped up the slope.
Sites over 15% slope should be referred to an engineer if they can be developed
efficiently.
Block Length Rowhouses on full straight block shall have a maximum of 8 units per row,
with end lots shall facing the wider road right of way. Alley between blocks should be
at least 2 meters.
Circulation and Road Network. The circulation and roads which are part of the non-
saleable area of the site must have a minimum width provisions as follows:
451-750 10 6.5
751-2250 12 8 6.5
2251-4500 15 8 6.5
4501 and above 15 10 6.5
Land Development. Land Development shall be guided by the NHA's detailed design
standards and technical specifications to be issued through the HTDO.
No development permit shall be secured from the LGU concerned without the prior
approval of NHA.
As a general rule, all standard building plans and housing units/models shall emanate
from the HT DO, as approved by the General Manager. Said plans must likewise be
prepared, signed and sealed by the appropriate registered license professionals, as
follows:
LEGAL REFERENCES
EXECUTIVE ORDERS
Executive Order No. 272: Authorizing the Creation of the Social Housing Finance
Corporation and Directing the transfer of the Community Mortgage
Program, Abot-Kaya Pabahay Fund Program, and other social Housing Powers
and Functions of the National Home Mortgage Finance Corporation to the
Social Housing Finance Corporation (2004)
Executive Order No. 105: Approving and Directing the Implementation of the
Program for "Provision of Group Home/Foster home for Neglected, Abandoned,
Abused, Detached and Poor Older Persons and Persons with Disabilities" (2002)
Executive Order No. 20: Reaffirming Mass Housing as a Centerpiece Program in
the Poverty Alleviation efforts of the Government and further strengthening the
Housing and Urban Development Coordinating Council (2001)
Executive Order No. 258: Prescribing Time Standards in the Issuance of Permits for
Housing Projects (2000)
Executive Order No. 45: Prescribing Time Periods for Issuance of Housing Related
Certifications, Clearances and Permits, and Imposing Sanctions for Failure to
Observe the Same (2001)
IRR EO 45
Executive Order No. 159: Declaring Mass Housing as Centerpiece Program of
the Estrada Administration and Constituting the Presidential commision for Mass
Housing (1999)
Executive Order No. 170: Establishing the Revolving Funds for Housing Projects of
Local Government Units (1999)
Executive Order No. 71: Devolving the Powers of the Housing and Land use
Regulatory Board to approve Subdivision plans to Cities and Municipalities
pursuant to R.A. no. 7160, otherwise known as the Local Government Code of
1991 (1993)
Executive Order No. 72: Providing for the Preparation and Implementation of
Comprehensive Land Use Plans of LOcal Government Units Pursuant to the Local
Government Code of 1991 and other Pertinent Laws (1993)
Executive Order No. 129: Establishing an Institutional mechanism to Curtailment
of the Activities of the Professional Squatting Syndicates and Professional
Squatters and Intensifying the drive against them (1993)
Executive Order No. 357: Strengthening the Existing Coordinating Mechanism of
the National Shelter Program of the Government Under Executive Order No. 90,
Dated December 17, 1986 (1989)
Executive Order No. 90: Identifying the Government Agencies Essential for the
National shelter program and defineing their mandates, creating the Housing
and Urban Development Coordinating Council, Rationalizing funding sources
and lending mechanisms for home mortgages and for other purposes (1986)
ADMINISTRATIVE ORDER
MEMORANDUM CIRCULAR
Memorandum Circular No. 87, Series of 2015 - Directing all National Government
Agencies and Instrumentalities, including Government-Owned or Controlled
Corporations, to Submit an Inventory of their respective Idle Lands, and Creating
an Inter-Agency Task Force to identity Lands, and sites for Socialized Housing
Memorandum Circular No. 112, Series of 2006 - Housing Fair for employees in the
public sector.
Memorandum Circular No. 2016 – 098
SUBJECT: NHA Standard Housing Models Design Manual
PROCLAMATION
Proclamation No. 662: Declaring the Month of October as the National Shelter
Month (1995)
PRESIDENTIAL DECREE
Presidential Decree No. 957: Regulating the Sale of Subdivision Lots and
Condominiums, Providing Penalties for Violation Thereof (1976)
IRR PD 957
DESIGN DEVELOPMENT
DESIGN GOALS
In setting design goals, SD was considered in its three aspects — the social, the
environmental, and the economic (2). As much as possible, “integrated” design goals
were set, that is, the accomplishment of a goal should in most cases support the
accomplishment of another goal.
The indicators describe provisions that increase probable success in achieving the
design objectives. These indicators were not intended to serve as an exhaustive
compilation of ALL design requirements for dwellings. All applicable code requirements,
covered by the indicators herein or otherwise, were still observed.
In the process of designing this framework, some design objectives were found to
contribute to the achievement of some design goals while possibly hampering the
achievement of other design goals. For example, achievement of the design objective,
“materials used for the structure are inherently resistant to the effects of earthquakes
and typhoons,” may result to disaster-resilience and low maintenance, but may not
result to low initial cost. Thus, in such cases, the NHA design team had to consider
satisfying design goals in varying degrees; that is, although a strategy may not
completely satisfy a certain design goal, it must neither completely prevent that design
goal from being achieved.
DESIGN STANDARDS
Batas Pambansa 220 ( BP 220) a law that was passed in 1982, authorizing the Housing
and Land Use Regulatory Board to establish and promulgate two levels of standards
and technical requirements for the development of economic and socialized housing
projects in urban and rural areas, provided a framework for making available
adequate housing for average and low-income earners. In 2008, revisions were made
to the Implementing Rules and Regulations (IRR) of BP 220. Such changes include the
provision of the minimum lot size of 28 square meters, and the minimum floor area for a
socialized housing unit at 18 square meters. Land use ratio for buildable and non-
buildable areas is set at 70%-30% ratio. NHA for its part, improved its own design
standards in terms of lot and housing unit sizes, as well as in the applicable land uses.
The most recently approved guideline for site development is now set at 60% saleable
(residential, commercial and industrial, institutional) and 40% non-saleable (open space
community facilities, easements, road networks and footpaths).
In coming up with the housing models, the following principles were considered:
1. Social and cultural: Behavioral patterns of people must be carefully studied based on
previous experience and historical data. Design should consider acceptability and
cultural adaptability of any housing development to the specific target market. 2.
Physical Aspect : a. The exterior design of the building can never be disassociated from
its interiors. The roof, columns and beams, walls and floors, window and door openings
provide the enclosure to the structure The conscious planning of each of the exterior
parts directly affect the conditions inside the house such as areas for sleeping, living,
dining, kitchen, laundry and toilet facilities. Further, natural light and ventilation should
be adequately provided to save on energy costs. b. Furniture layout inside the
buildings and partition walls should be planned in same manner with thought on the
layout of fixtures such as cabinets, beds and even storage for cleaning tools and
equipment. c. Lighting and convenience outlets must also be strategically located for
easy access within the housing units, but with consideration to the safety of the
children. d. Careful placement of spaces in relation to the solar and wind orientation
and their dimensions all relate to the indoor quality of the house.
3. Maintenance and Sustainability : Project design and development must consider the
aspect of maintenance to sustain the architectural and structural integrity of the
buildings and the environmental quality of neighborhoods. 4. The planning,
architectural lay-outing and utilization of spaces within and surrounding such buildings
or structures must be well coordinated with the design of the utilities inside and outside
of the structures. As an example, the location of electrical posts and septic tanks was
considered in the setback requirements.
5. Budget consideration : The sector being served by the NHA belongs to the lowest
30% of the income population, so that affordability levels is of utmost importance. The
housing package which include the house and lot models must meet the required
social, cultural and physical aspects within the financial scheme for each of the
programs for implementation.
DESIGN PARAMETERS
1. Land Allocation
a. Saleable Areas
There shall be no fixed ratio between the saleable portion and non-saleable
portion of a subdivision project.
b. Non-saleable Areas
Non-saleable areas shall conform with the minimum requirements for open
space comprising those allotted for circulation system, community facilities and
parks and playgrounds.
Area allocated for parks and playgrounds shall be mandatory for projects 1
hectare or above and shall be strategically located within the subdivision
project.
In no case shall an area allocated for parks and playgrounds be less than 100
square meters. An addition of 1% increment for every 10 or fraction thereof
above 225.
The site shall not be subject to flooding nor situated in steep slopes. Sites
potentially hazardous or dangerous to the health and safety of users especially
children, should be avoided, e.g., along rivers, near dumping site, etc.
No. of Neighborhood
Convenience/
Saleable Multi-Purpose Elementary High Tricycle
Retail
Lots Center* School** School** Terminal*
Center**
and/or
Dwelling
Unit
10 & - - - - -
below
11 – 99 - - - - -
100 – 499 x - - - -
500 – 999 x - - - -
1000 – x - - - -
1499
1500 – x x x - x
1999
2000 – x x x x x
2499
2500 – x x x x x
3000
* Mandatory Provision of area
** Optional Saleable but when provided in plan the same shall be annotated in
the title.
The area allocated for community facilities shall vary with the density of the
subdivision, i.e., number of lots and/or living units whichever is applicable, as
shown below:
The area allocated for circulation system shall not be fixed, as long as the
prescribed dimension and requirements for access (both for project site and
dwelling units) specified in these Rules are complied with.
Land circulation system shall comply with the pertinent requirements of BP 344
otherwise known as the Accessibility Law.
Major roads shall maintain a uniform width of road right-of-way. Tapering of road
width shall not be allowed where the road right-of-way is wider than the
prescribed standard for the interconnecting road of the proposed subdivision.
Interior subdivision project must secure right-of-way to the nearest public road and
the right-of-way shall be designated as interconnecting road with a minimum
width of 10 meters. This fact shall be annotated on the title of the said road lot and
must be donated and deemed turned over to the LGU upon completion of the
said interconnecting road.
Alley shall have a width of 2.0 meters intended to break a block and to serve
both pedestrian and for emergency purposes, both ends connecting to
streets. It shall not be used as access to the property.
Planting strips as required under PD 953 and its Implementing Rules and
Regulations shall be observed in accordance with the following road
specifications:
Road intersections shall be provided with adequate curb radii consistent with
sound engineering principles. (See Figure 3: Curb Radii Dimension) Figure 3:
Curb Radii Dimension
b.3.6 Road Grade/Slope
Crown of the roads shall have a slope of not less than 1.5 to 9 percent.
(See Figure 4: Road Grade Slope)
Grades and vertical curbs shall conform to the design requirements of the
Department of Public Works and Highways (DPWH).
RIGHT OF WAY
2. Lot Requirement
a. Lot Planning
a.4 Lots shall be protected against physical hazards. No lot shall be laid
out where potential risks exist (e.g. erosion, slides, flooding, fault lines,
etc.)
a.5 Lots shall be protected against non-conforming uses and/or other risks
through the provision of adequate buffer strips, protective walls, and
roads or other similar devices.
b. Minimum Lot Area(Amended per Board Res. No. 824, Series of 2008)
The minimum lot area of various types of housing for economic and
socialized housing project shall be as follows:
Note:
2. Price of saleable lots intended for single detached units shall not
exceed 40% of the maximum selling price of the house and lot
package.
1. Single detached
a. Corner lot 8m 8m
b. Regular lot 8m 8m
c. Irregular lot 4m 4m
d. Interior lot 3m 3m
2. Duplex/single attached 6m 6m
3. Row house 4m 3.5m
Note:
For row houses, there shall be a maximum of 20 units per block or cluster
but in no case shall this be more than 100 meters in length.
3. Length of Block
Maximum block length is 400 meters. However, block length exceeding 250
meters shall already be provided with a 2-meter alley approximately at
midlength.
4. Shelter Component
5. Setback/Yard
The minimum setback of dwelling unit both for economic and socialized
housing project shall be as follows:
6. Water Supply
Each lot and/or living unit shall be served with water connection (regardless of
the type of distribution system). Water supply provided by the local water
district shall be potable and adequate. It shall be complemented/
supplemented by other sources, when necessary, such as communal well,
which may be located strategically for ease and convenience in fetching
water by residents and at the same time not closer than 300 meters from each
other.
If public water supply system is not available, the developer shall provide for an
independent water supply system within the subdivision project. Minimum
quantity requirement shall be 150 liters per capita per day.
Each subdivision must have at least an operational deep well and pump sets
with sufficient capacity to provide average daily demand (ADD) to all
homeowners provided a spare pump and motor set is reserved.
Likewise, required permits from the NWRB shall be obtained and standards of
the Local Water Utilities Administration (LWUA) shall be complied with.
If ground reservoir is to be put up, an area shall be allocated for this purpose
(part of allocation for community facilities). The size shall depend on volume of
water intended to be stored. It shall be protected from pollution by providing
buffer of at least 25 meters from sources of pollution/contamination.
For elevated reservoir, structural design shall comply with accepted structural
standards or the National Building Code of the Philippines. The elevated
reservoir or water tank capacity must be 20% average daily demand plus fire
reserve.
Provision for fire protection shall comply with the requirements of the Fire Code
of the Philippines. Whichever is applicable, the Local Government Unit shall
provide each community with fire hydrants and a cistern that are operational
at all times.
For a multi-storey building, a water tank shall be provided if the height of the
building requires pressure in excess of that in the main water line. Capacity
should be 20% average daily demand plus fire reserve.
When power is available within the locality of the project site, its connection to
the subdivision is required. Actual connection, however, may depend on the
minimum number of users as required by the power supplier.
Provision of street lighting per pole shall be mandatory if poles are 50-meter
distance and at every other pole if the distance is less than 50 meters.
a. Septic Tank
9. Drainage System
The design of the drainage system of the subdivision shall take into
consideration existing development of adjacent areas relative to their
impact/effect on its drainage system, if any. Further, it shall conform with the
natural drainage pattern of the subdivision site, and shall drain into appropriate
water bodies or public drainage system or natural outfalls. In no case shall
drainage outfalls drain into a private lot. Its layout shall conform with sound
engineering design principles certified by a duly licensed civil/sanitary
engineer. Drain lines shall be of durable materials and approved installation
practices.
The minimum drainage system for economic and socialized housing shall be
concrete lined canal with load bearing cover.
The Homeowners Association shall form fire brigade in collaboration with the
barangay fire brigade. Water for fire fighting shall be part of the water supply
requirements and shall comply with the requirements of the local/district fire
unit of the Philippine National Police.
UNDER BP 220
2. Land Allocation
for Projects 1
hectare and
above a. a. Variable
Saleable Area b. See open space requirement as per b.1, b.2 and b.3
b. Non-saleable
area
Mandatory allocation for parks and playgrounds per
tabulation below:
b.1 Area for Density % of Density % of
parks and (No. of Lots or Gross Area (No. of Lots or Gross
playgrounds Dwelling Unit for Parks & Area
for projects 1 Per Hectare) Playgrounds Dwelling Unit for Parks
hectare & &
above. 150 & below 3.5% Per Hectare)
151 – 160 4.0% Playgrounds
161 – 175 5.0%
176 – 200 6.0% 150 & below 3.5%
201 – 225 7.0% 151 – 160 4.0%
Above 225 9.0% 161 – 175 5.0%
176 – 200 6.0%
201 – 225 7.0%
Above 225 9.0%
b.3 Circulation
Observe hierarchy of roads
System
4. Minimum Lot
Frontage
4.1 Single
Detached 8 m. 8 m.
a. Corner lot 8 m. 8 m.
b. Regular 4 m. 4 m.
lot 3 m. 3 m.
c. Irregular 6 m. 6 m.
lot
d. Interior lot 4 m. 3.5 m.
4.2 Single
Attached/
Duplex
4.3 Row house
5. Length of Block Maximum length of block is 400 meters. However,
blocks exceeding 250 meters shall be provided with
a 2-meter alley approximately at midlength.
6. Road Right-of-Way
Note:
2.5 has. & below Major, minor, motor court, Major, minor, motor court,
alley pathwalk
Above 2.5 – 5 has. -do-
Above 5 – 10 has. -do- -do-
Major, collector, minor, motor
Above 10 – 15 court, alley Major, collector, minor,
has. -do- motor court, pathwalk
-do-
Above 15 – 30 -do- -do-
has. -do-
Above 30 has.
8. Roads
Specifications
8.1 Planting
Strip
(PS)
Sidewalk (SW)
PS SW
ROW
1.30 m 1.20 m
15.0 m. 0.80 m 1.20 m
12.0 m. 0.80 m 1.20 m
10.0 m. 0.40 m
8.0 m. 0.60 m optional
6.5 m. 0.50 m
Refer to Supplemental Rules and Regulations to Implement
PD 953 for specific tree species, Annex 2.B.
8.2 Road
Pavement
Concrete/Asphalt
Concrete/Asphalt
Major
Macadam
Minor
Macadam
Motor Court Macadam
Sidewalk
Pathwalk/alley
12.1 Septic Tank Individual septic tank conforming to the standards and
design of the Sanitation Code of the Philippines.
12.2 Connection
to Whenever applicable, connection shall be made to an
Community approved public or community sewer system subject to
the requirements and provisions of the Sanitation Code
Sewer System
of the Philippines and other applicable rules and
regulations.
13. Garbage Disposal Provide sanitary and efficient refuse collection and
System disposal system whether independently or in conjunction
with the local government garbage collection and
disposal services.
14. Shelter
Component
14.1Minimum Floor
Area
a. Single 22 sqm. 18 sqm.
Detached
b. Duplex/ 22 sqm. 18 sqm.
Single
Attached
c. Row house 22 sqm. 18 sqm.
15. Setback/Yard
a. Front setback 1.5 m
b. Side yard 1.5 m (from the building line)
c. Rear yard 2.0 m
d. Abutments May be allowed per requirement of the National Building
Code of the
Philippines
Building Design Standards and Guidelines
Projects incorporating housing components shall comply with the following design
standards and guidelines.
1. Lot Planning
Open spaces shall be located totally or distributed anywhere within the lot in
such a manner as to provide maximum light and ventilation into the building.
The minimum horizontal dimension of courts and yards shall not be less than 2.0
meters. All inner courts shall be connected to a street or yard, either by a
passageway with a minimum width of 1.20 meters or by a door through a room
or rooms.
Every court shall have a width of not less than 2.0 meters for one and two storey
buildings. However, this may be reduced to not less than 1.50 meters in cluster
living units such as quadruplexes, row houses and the like, one or two stories in
height with adjacent courts with an area of not less than 3 square meters.
Provided, further, that the separation walls or fences, if any, shall not be higher
than 2.0 meters. Irregularly shaped lots such as triangular lots and the like
whose courts may also be triangular in shape may be exempted from having a
minimum width of 2.0 meters, provided that no side thereof shall be less than
3.0 meters.
e. Abutments
Abutments on the side and rear property lines may be allowed provided the
following requirements shall be complied with:
b. Ceiling Heights
1) Minimum ceiling height for habitable rooms shall be measured from the
finished floor line to the ceiling line. Where ceilings are not provided, a
minimum headroom clearance of 2.0 meters shall be provided. (See Fig.
5: Minimum Ceiling Heights)
2) Mezzanine floors shall have a clear ceiling height of not less than 1.80
meters above and below it, provided that it shall not cover 50% of the
floor area below it. (See Fig. 6: Mezzanine Floor)
1) Doors
b) Doors shall have a minimum clear height of 2.0 meters. Except for
bathroom and mezzanine doors which shall have a minimum clear
height of 1.80 meters.
a) Rooms for habitable use shall be provided with windows with a total
free area of openings equal to at least 10% of the floor area of the
room.
b) Bathrooms shall be provided with window/s with an area not less than
1/20 of its floor area.
c) Required windows may open into a roofed porch where the porch:
c.1 abuts court, yard, public street or alley, or open water course and other
public open spaces;
3) Interior Stairs
The stairs shall ensure structural safety for ascent and descent, even in
extreme cases of emergency. It shall afford adequate headroom and
space for the passage of furniture.
b) Riser and Run. Stairs shall have a maximum riser height of 0.25 meter
and a minimum tread width of 0.20 meter. Stair treads shall be
exclusive of nosing and/or other projections.
f) Guard and Handrail Details. The design of guards and handrails and
hardware for attaching handrails to guards, balusters of masonry walls
shall be such that these are made safe and convenient.
f.1 Handrails on stairs shall not be less than 0.80 meter or more than
1.20 meters above the upper surface of the tread, measured
vertically to the top of the rail from the leading edge of the tread.
(See Fig. 8: Stairway Design)
f.3 The height of guards shall be measured vertically to the top guard
from the leading edge of the tread or from the floor of landings. It
shall not be less than 0.80 meter and no more than 1.20 meters.
Masonry walls may be used for any portion of the guard.
d. Roofing
e. Electrical Requirements
There shall be provided at least one light outlet and one convenience outlet
per activity area.
1. Lot Planning
Each dwelling unit shall be provided with a sanitary means for the removal
of garbage and trash.
Interior
Inside
Corner/Through 2.0 2.3 2.6 2.9 3.2 3.5 3.8 4.1 4.4 4.7 5.0
Lot abutting 3 or
more streets,
alleys, rivers,
esteros, etc.
Buildings).
The minimum distance between buildings with more than 4 storeys shall
be 10 meters. The minimum horizontal clearance shall be 6.0 meters.
Except, however, in cases when the two sides of the buildings facing
each other are blank walls, i.e., either there are no openings or only
minimal openings for comfort rooms, the minimum distance between
the buildings shall be 2.0 meters. And the horizontal clearance
between the roof eaves shall be 1.0 meter. (See Fig. 14:
MEASURE THIS
SHORTEST DISTANCE
g. Parking Requirements. (Amended per Board Res. No. 824, Series of 2008)
The driveway may be used as parking area provided that the minimum
right-of-way shall be maintained. (See figure 16: Parking Layout).
Fig. 16: Parking Layout
Off-site parking may be allowed in addition to on-site parking provided that
designated parking area is part of the project and provided further that it shall
not be 100 meters away from the condominium project.
a. Living Units
In general, all building design standards for the single-family dwelling shall
apply to all living units of multi-family dwellings, except that, the minimum floor
area of a living unit in multi-family dwellings shall be 22 square meters for
economic housing and 18 square meters for socialized housing. For BP 220
condominium projects, the minimum floor area shall be 18 square meters.
Standards for exits, corridors, exterior balconies and common stairways shall
conform with the provisions of the National Building Code of the Philippines and
its Implementing Rules and Regulations as well as Section 3.1007 of the
Implementing Rules and Regulations of the Fire Code of the Philippines (Annex
1).
Automatic fire alarm suppression system should be provided for structure more
than 15 meters in height.
To ensure healthful and livable conditions in the project, basic utilities and
services shall be provided, the minimum requirements of which shall be:
1) Water Supply
3) Drainage System
Adequate services for the regular collection and disposal of garbage and
rubbish shall be in compliance with applicable local ordinances.
6) Elevator Requirements (If Applicable) (Amended per Board Res. No. 824,
Series of 2008)
All construction shall conform with the provisions of the latest edition of the
Philippine Structural Code.
b. Electrical Requirements
All electric systems, equipment and installation shall conform with the provisions
of the latest edition of the Philippine Electrical Code and the requirements of
the electric utility that serves the locality.
c. Sanitary Requirements
All sanitary systems, equipment and installation shall conform with the provisions
of the latest edition of Sanitation Code of the Philippines and its Implementing
Rules and Regulations and National Plumbing Code.
d. Construction Materials
HOUSING MODELS
HOUSING BACKLOGS IN THE PHILIPPINES
KADAMAY HOUSING
The occupation of more than 5,000 housing units at Pandi, Bulacan initiated by
KADAMAY is a manifestation of the demand for decent housing and the
government’s failure to resolve the housing problem. There are problems
surrounding the government’s current housing program such as the lack of basic
social services and livelihood in relocation sites. He also stressed the government
should consult the beneficiaries on housing projects to identify the needs of the
community.
YOLANDA HOUSING
Typhoon victims who were supposed to occupy the units complained of the
poorly-constructed houses, saying most are shaky, have no power lines, and
have inefficient sewage systems.
PABLO HOUSING
Is a housing backlog of NHA, because of the improper location of the project in
Barangay Andap, New Bataan, Compostela Valley province.
It was supposed a relocation site for victims of typhoon ‘Pablo.’ but the site was
at the foot of the mountain…along the danger zone. The 300 relocated
households now need another relocation due to the risk of landslides.