COMMISSIONING TEST
CIRCUIT BREAKER INSPECTION REPORT
PT. MALEA ENERGY GROUNDING
QUALITY CONTROL DEPARTMENT INSPECTION REPORT

Project : PLTA MALEA HEPP STAGE-1 (2x45 MW) Report No. Rev. 0
Drawing No. LH16-E11-602-LY-001 Rev.
Location : POWER HOUSE BUA KAYU Rev.
Date Page : 1 of 2

Applicable
Description GROUNDING RESISTANCE B1 FLOOR LAYOUT Code & IEEE 81
Standard

No Measuring Instrument Axis Insulation Resistance Status Result

1 Digital Earth Tester Model 4105A E-F 2-3 0.37 Done Good

2 Digital Earth Tester Model 4105A E-F 2-3 0.38 Done Good

3 Digital Earth Tester Model 4105A E-F 3-4 0.4 Done Good

4 Digital Earth Tester Model 4105A E-F 3-4 0.39 Done Good

Result : Qualified , Unqualified

Note:

Quality Control Witnessed by Accepted by

-------------------------------------------- -------------------------------------------- -----------------------------------------------------


Date : Date :
Distribution : 1. File QA/QC (Original) 2. Originator (Copy)
PT. MALEA ENERGY GROUNDIN
INSPECTION RE
QUALITY CONTROL DEPARTMENT

Project : PLTA MALEA HEPP STAGE-1 (2x45 MW) Report No. :

Location : Power House Malea Stage-1 Drawing No. : LH16-E11-602-LY-001

Date : Page: 2
Description : B1 FLOOR LAYOUT Applicable Code :
& Standard

E-F 2-3 E-F 2-3

E-F 3-4 E-F 3-4

Result : Qualified Unqualified

Note:
Quality Control Witnessed by Accepted by

Date : Date : Date :


Distribution : 1. File QA/QC (Original) 2. Originator (Copy) 3. Engineering (Copy)