You are on page 1of 2

How to Calculate Velocity of team in Scrum

Advertisement:

As you know Scum is a framework of iterative and incremental for the project management.
Scrum has three roles: Scrum Master, Product Owner, and Team. The combination of all three
roles is known as The Scum Team. The Team is a self manageable in the Scrum methodology.
So, it is important for the team to understand the concept velocity.

In a Scum, whole the projects are divided into number of sub process. These sub process are
known as sprints. Sprints can be of one week, two week or three week duration. Scum team is
generally consisting of more than seven or less than seven people.

According to the scum teams velocity is related with the amount of work done by a team in a
given sprint. Team must have to know about the velocity of the team in Scrum, if in any case
team does not know about the velocity of team in Scrum, then team has no way to know that how
much work to put into upcoming iteration.

If the team does to think about the velocity of a team, then at that time it is the 100% probability
that team must miss the scope of the iteration. Scrum teams know that velocity is a rough
estimate for the amount of work that a team can accomplish in a given sprint. In a Scrum
required work is called a Backlog and the components of Backlog are called Backlog items. The
size of the backlog items is known as points or story points. Velocity of the team in a Scrum has
been calculated as follows:

Velocity of the team in Scrum = Number of total story points / One iteration

Let there are total 91 points calculated. So velocity of team in Scrum is 91 points per sprint.
By use of the Yesterday’s weather principal it is natural for commit about the same type of
backlog items in the next sprint. Before doing this it is necessary to check the history of the
Project.

You might also like