Professional Documents
Culture Documents
KRH Ipge
KRH Ipge
KWH KWH t
KRH – Unit 1 (PGE) 289605 252165.643069 2588.266
Buangan ke Rock GPP Shutdown Import SGSS Shutdown
Muffler (Hour) Energy (Hour)
USton hr KWH hr
0 0 0 0
Keterangan
Jam Awal Gangguan Jam Akhir Gangguan
(HH:mm) => gunakan (HH:mm) => gunakan Derating
PLTP Status Gangguan tanda petik satu (') tanda petik satu (') (MW)
sebelum mengetik jam sebelum mengetik jam
t barg barg
Operation
Shut In
Operation
Operation
Shut In
Keterangan
Temperature calculated
Temperature calculated
Cold Brine Operation Cold Brine & Condensate Reinjection (Flow Meter perlu kalibrasi)
Hot Brine Operation Tidak ada Press,Temp dan Flow indicator
er perlu kalibrasi)
SUMUR TKS Status Sumur Keterangan
barg
KRH 4-2 0 Shut In NO PRESSURE GAUGE
KRH 4-3 39.4 Shut In
KRH 5-3 25 Shut In
Trotle Valve Opening
SEPARATOR Tekanan Suhu Level Brine (%) Brine (%)
barg deg C % %
KRH 4 5.8 163.7 60 100
KRH 5 5.7 163.5 10 100
KRH 6 6.3 166 10 100
Trotle Valve Opening Steam Flow Rata2 Brine Flow Rata2
Steam (%)
% t/hr t/hr
100
100
100 62.04
Suhu
INTERFACE POINT Tekanan Interface Point Interface SCRUBBER Tekanan Scrubber
Point
barg deg C barg
Interface KRH Unit 1 5.819 162.7 Scrubber KRH Unit 1 5.761
Suhu Scrubber
deg C
162.7
AREA Rencana Realisasi Kemarin Temuan Kemarin
Karaha