You are on page 1of 11
4 &.. ‘Sumitomo Corporation SITE TRANSMITTAL LONTAR EXTENSION CFSPP (1X315MW) Req.No. _B 2432 Date: —_December 4, 2019 To: PT Satyamitra Sury: Lontar Extension C ‘a Perkasa SPP (1X315MW) Attention: Mr. Janto Setiawan - Project Director Mr. Suhartono,- Project Field Manager fae Mr. Lukman Hadianto - Field Project Manager (Ci ) Mr. Jeyamohan Gurusamy - Field Project Manager (M/E/1&C) Consortium is sending PT. SSP the attached documents for your review. D shop Drawings O Prints G Plans O Copy of Letter CO Change Order C Samples O Catalog Cuts O Specifications & Other Copies Date Ref. No. Description 1 | 04-Dec-19 CIR B&V/SSP-640 ‘Auxiliary Boiler and Thermal Desalination Plant - Steam Blowing Piping ‘These are transmitted as checked below: O For Approval CO Exceptions Noted CO For Review and Comment O For Your Use O No Exceptions Noted CO Returned for Correction Oi As Requested & For Action O For Information Remarks: Dear All, Please find attached Document listed above for your action. ‘Thank you. Ifyou have any questions, please call me at: +62 21 2978 0532 Signed: é mh i Nicholas Choon al BEV Site Manager cP-c-SAD1-F-001 Page tot CONSTRUCTION INFORMATION REQUEST Consortium of Sumitomo Corporation, Black & Veatch | Area/System and PT. Satyamitra Surya Perkasa All Area Lontar Extension Coal Fired Steam Power Plant 1x315 MW Project File No. _83.5000 Date: (04 Dec 2019 Project No. From: CIRNo. _CIR B&V/SSP-640 Comany Prepared By: _Singitam Prabhakar ContractiP.O. No. 0436.PJ ‘We request the below Information be supplied or dantied, SUBJECT: Auxiliary Boiler and Therifial Desalination Plant - Steam Blowing Piping a This has reference to the Steam Blow from auxiliary boiler outlet piping to thermal desalination plant. CCL shall note that the scheme of the steam blow indicated in the P&ID 189963-4LBK-M2594B has been revised and modified as per scheme in attachment. Based on the revised scheme, steam blowing shall now include steam piping with in thermal desalination plant and the steam will be vented past the MED steam piping. Attachment -2 contains the piping layout including the temporary pipe routing to vent the steam to the safe outlet. CCL shall install the temporary piping in accordance to this drawing. CCL shall use the below materials delivered for installing the temporary piping a) Material delivered by Seonghwa (86.1211) for the pipelines 40LBK80BR002-1 and 40LBK80BR003-1 b) 5 spools of 6" pipe material delivered in MIR 1914 ) Material delivered in BV-ON-0168 (for remaining pipes and fittings) d) CCL shall use-the use the temporary or scrap steel available at site for installing the supports. ) Anchor bolts shall be requested from CTL Modifications to be recorded on contractor's as-built records: ‘Adéltional Materials Required?: [] SMPRIP.O. # Arval Date: i Prepared by: Singitam Reviewed By: Santosh Pansu& Response required by: Verbal Reply Given to on Name of Person Dale REPLY Reply Prepared By: Date: Signature Ap “ ury sul | Sobrnitat os! Bayel!S Subh Signature: > Classification: Primary _[—_] Secondary] Distribution: B&V Project Manager File CP-C-FENT-F-001 Page _1 of 4 ‘Atachment| CR BBVISSP.640 s,m [Te yenos-Po-aoa8 «ronan grat rca cn ng pac soeaeth 5 Fon cl seroorean Cagran |S SeRSuDSansu eerste "Thermal Desatnaten Plant MED #3 7Gosronsam non, [Seam aeoranog tt =oLaKeo ‘UNCON a i Sere eee eee tee eee 7. = eereiene sm, APPROVED FOR mE a= CONSTRUCTION LLONTAR EXTENSION CAL FRED STEAI POWER PLANT(1X315MN) 'PT_PIN (PERSERO) ob z PT. PERUSAHAAN LISTRIK NEGARA (PERSERO) BLACKAayEATCH TORTARETENSION Sees =ae &. ot te [COAL FIRED STEAM POWER PLANT (1X31514¥)] 189963-GLBK-M25948 | 0 ‘ese [on PNG ARGENT RGAE © Sumitomo Corporation| bar STeMniow El I r I a 5 I a z z 1 wma — Tar] a Attachment 1 - CIR B&V/SSP-640 E eee noni seseeeseseerees Temporary Steam Blow Piping Trae — [Gaon act [ates 4 | thermal desalination equipment for vent to eI atmosphere without silencer vente i, cet commerorsccoworanven | f iD 22m ice anno nue E ae =} = —({E= is aeeees = \ = K ==; I i 7 PRUSAPAAN USTRICREGARA PERSE) wv sg ecewmmesescer conn ot ERE EER can sar unas nea 8 be bs a a i Z ners B $a iiasias LONTAR EXTENSION rl ‘ST VAUD CONDENSER RD VAG CONGENEER wee [Core «reo TOR cou. i owen ee) a Pe | CF 48N00 | GENERAL NOTE: 4O6CFraACOIO s0ccrraAcI20 a | sescrtastot *406¢F 4Bn002 | eee a eb meakayeares, ee | Seta — [eA | sate — | AS ORT ‘Cs bu Sune TN Fo ese Te eer ‘ssTwaniGnse? | | Temes ASTM SRG? Sem Fionta) [a8 (Sess a benno ieee smmoconentin [FEELS =, eames | fete Searmonimg| a | sommes] —— a ENT 0 ae a saver era [ seewasreon = FORMED i 2oScr2 a Se eneecanioe Erion [amar “4 Fee Con ee Fee 3 T z I = z i 3 I z I Sata 3 i 5 i 4 I 3 I 2 H T - THERNOSONPRESSOR PREHEATER DESUPERHEATING PUMP earn Jar] -aGcreT#01 OGCrRAGDO Rowe oa Safe area near aoacrisaroes |: Attachment 1 - CIR B&V/SSP-640 a ae oe 4 | equipment for vent to eae ** Temporary Steam Blow Piping Seon Pemaetoag| 8 Fatecwoe ween] we pee ee ai eee Fed pover_| 15607 i Seva) Dai “0% aint —| — ssa [gee Fonciniewesaoumnsrsan) mam fools” = Neale 8 i q 7 =| a : \ re raeeae aed _ le \ SE ( NEGARA Lowa erg ree Tage FST sen eweriecreniig ive a as cs — i os | LONTAR EXTENSION ml EVAPORATOR CELL + EVAPORATOR CELL? APORATOR CELLS APORATOR CELL WANOONOENSER | evra nore COAL FRED POWER PLANT SSH) {occF Aco “aoccrraRCORE “eGR c {eCrIaACo SOSSFISACIOD _ RugRPE Tren eon Faia [SURORR RSH | SENET | RMRERTTSY Tea — [ASU ANTRRTE | Rar —[arTnae ee al Taian erence $Me un sHous as “eis [TW NZ_| | “Toetaer —|—Asmrcawe? | |~nee —|~Aetebvea? | | Rarwmare naman ‘eis ASREGSHE? | NUMBERS FOR MED ONLY al z ‘s =“ SsECUIEWENT fRtecereta] 62 | fenmwgewnona) Wit] Fates mga] a —| enmmareenra| as Fete | Seow oe eer eave eevertornny [10 eae 8) = Seong) | eno 1 FoRMeDs soccrs | OCOne@veous | ENTERS al Tear es) | er as a | = Tease forge) | as FORMEDs? aaccrz | oc —_/_punane nema — = = FeRComnenssacery [= Er pe eet 3 I z I 3 I 5 I z I 3 z I PLAN VIEW Attachment 2 - CIR B&V/SSP-840 [Eee POTABLE PUNP— RINE PUP —~ ee ognanon sooitm PLATE HEAT EXCHANGER PLATE HEAT EXCHANGER Futer ——~ “YAN86484 13-Apr-2018 16:25:26 [=] ae ce nce oso te ‘SEAWATER SUPPLY SYSTEM cme | | & a | TE} WASTE WATER COLLECTION UMP COVMON AREA 1P189963.65.1510.05-49033 P. 1/1 StNE 12JAN-18 MC-01181 7 i 2 Zi a qi z i zt N WATERIAL UST FABRICATION Attachment 2 - CIR B&V/SSP-640 it = a | 4 u ieee cic ae 1 3 | Shik etonstocsne woe |} | ir Cacme) iio zy -(a3- (oa Refer to Auxil & [osetia pale Steam system =| ce a ae ey . Isometric for pipe line | Sieeer o Vis number ie lee Panes 40LBG51BRO003 / 3 | Siren o at 40LBG51BR004 Presrocts: 4 a oes at st QOveoua eigen "ei tte ee te ts Serge ae Sy. [set nn on a mes eee on PIPING ISOMETRICS CS 300H LS SAL aS one get [ oslsereemer rection aaa| fogcrcpRioi.cs fais ease ws ems eae LS no co = veer eaeanoes [TET = fe axe [asoerre femme] re] east saber areca eg aterm. | 16003-RDOSEO Cee LYAN86484 13-Apr-2018 16:25:26 ; : : : ¥ TPA : E JANE 5 L * 1 2 L WATERIAL UST FABRICATION Attachment 2 - CIR B&V/SSP-640 mat [a =n fete eee: wa ¢ 7 cu z = vf Ge 3 Soleil ae ee see tae a L a = ed A a sae ‘ Ta wer TET NOTES LEGEND a pews enrrarie &) VEOLIA MED 2+2 1750, ee ee a at ey, [En sie eno ene fees eres@ PIPING ISOMETRICS CS so0# eri er at SEE 2 END vm nr ree [= [sero sseseoroee elie Tas awl eeee docor 4 aRI60-cS SSeS eee oa RR ree =p fe ae Comte ttiepigen mer nomcoaes [RE aes a [eomoson ee] eietecaoten ancraeiaiaaae premsrescererseseze,| 16009-RD-0550 oa] = [ws [ar oi ¥ PAB! : z JANE 5; & 1 ‘ @ Attachment 2 - CIR B&V/SSP-640 MATERIAL LIST FABRICATION cs eae68 [a meme ] + | laanasomnne = fom | =o = Ed eee 4 fe ane — a ars TeBENB a f evrnare @) VEOLIA MED 2+2 1750 i a ee BLACK & VEATCH gonore PIPING ISOMETRICS CS 200# [ERS SRS HeSe Tn othe en “ats | 0GoHaRIOSCS Fase S's ake ha Ba ea fae cael es or aa a feta mre seston 16008-RO0550 4 o YANB6484 13-Apr-2018 16:25:26 T zi #1 pi89963.65.1510:05-43033 P 1/1 SENE 12-JANU8 MC 7 L = f a 7 ; = 7 i @ i a on ri 7 1 =7 1 a Temporary Steam blow header pipe zi : w preliminary routing field adusted Attachment 2 - CIR B&V/SSP-640_ fe SS f. re 3|Seceeree = |i |e ee 1 ae beeen = flere —— fost} TOTES a me area ate + fa nena erate eee sa mmreneeee, [RES BLACK & VEATCH exrnore @) VEOLIA MED 2+2 1760 Bere. ema mereaa i [EY seme ee sonra PIPING ISOMETRIC C8 3008 Lee ee a ee peyrecee [= mclaren tate te as nasa “OGOFEBRIIECS bea re eran Sue en {Soaacoe 4a a | Sicseee time won smma soe [aaa aa a a ees. pen oe. [tre staon enere vaste tenia Tanase man sstimemmenerToncoe| 16003-RD-0550 05, ns | ar N ; 7 7 _ i : ; 5 % 7 L : ji ; 5 , 7 [xa woven roRoneRUeTON me [oe vam! FS Ree 4OGCF14-BR103-CS sd S2nicis see trviztnbuan:eaah: bgp con Ex we] eet [a [ne ise nara cea trcaes eons i ee iaeare| sea ical mag | sn ru [revone [ecsoneren fosamn foamed] wr isk uae nes oe ‘sutteer| 16003-RD-0550_ 04 a G T T 5 = T

You might also like