General Specification Effective date: 09/2016

GS MS PVV 003 Rev: 00

7.3 Dimensional tolerances


The values of the dimensional tolerances of the preproduced elements to be assembled are collated
in Table 3 : Dimensional tolerances.
Before bolt- up the maximum axial clearance between mating flanges shall take into account equal
the initial gasket thickness plus or minus the value stipulated in Table 3. The COMPANY reserves
the right to have disconnected any pump or compressor piping they have reason to suspect may be
"pulled up" on the machine flanges. If flange bolts cannot be reinstalled by hand, CONTRACTOR
shall be responsible for the necessary modification.

“Process”
Standard Piping
1 piggable piping
and other
and on machines
equipment
or package
1 Not applicable ± 3 mm max.
9 Not applicable ± 1,5 mm max.
2
Not applicable 1,5 mm
3
2
0,5 mm max. 0,5 mm
4
3
Ø ≥ 10'' : 1 mm max.,
5 Not applicable
Ø ≥ 8'' : 0,5 mm max.

To be adjusted
according to machine
Ø ≥ 10'' : 1,5 mm max.,
6 0,5 mm/m from
Ø ≥ 8'' : 1 mm max.
8" ≤ Ø ≤ 18",
0,2 mm/m for Ø ≤ 6"

2 Thickness of gasket ± Thickness of gasket ± 3


4

7 0,5 mm mm
2
8 ± 0,5 mm 3 mm max.
2
Out of roundness only
applicable for Out of roundness :
2
5

“Process” piggable
piping:
9
8% max. for internal
8

pressure
3% max. for external
0,5% max pressure

6 7 Table 3 : Dimensional tolerances

Page 38/88