Name of Applicant:
Republic of the Philippines
OFFICE OF THE CITY BUILDING OFFICIAL
City of Davao
Address:
Project Location:
Use or Type of Occupancy:
Contact Numbers:
Name of Authorized Representative:
Contact Numbers of the Authorized Representative:
CHECKLIST OF GENERAL REQUIREMENTS FOR BUILDING PERMIT APPLICATIONS
A. PRE-REQUISITE DOCUMENTS;
A.A] Clearances/Certificates (rom other Offices)
[21 Zoning Location clearance (CPOO) (Sec. 302.12.0}
(E12. BF? Fire Safety Evaluation Certfeate(FSEC|{Sec. 303.10)
E13. cus (0018) (0.0.No.13, 1998; NBC MIC No, 02, 2013)
up to2-storey residential or minor repair works: stamped
received by DOLE
> construction of commercial bldg.: Should be duly
Approved by DOLE
4. Others (as deemed applicable)
. DPwH Clearance (if along National Highway) (Sec. 302.22.b.)
caspiatoy clearance if applicable) (Sec, 302.12.)
1 DENR ECC for Environmentally Critical Project (See. 302.12.b vl)
Drainage Clearance (from DPWH/CEO) i required in the ECC
and if there is existing drainage/waterway afected
1 Hrattic impact Assessment (TIA) for major development such as,
Malls, Convention Centers, Sports Complex. ete. duly approved
by the Trafic Management and Control Board {TMCB)
1 co RROW Clearance if along City/iegy/Subd Road)
2] Legal Documents
CL certified true Copy of Land The from the Land Registration
Authority) (Se. 302.02.)
22. Centted True Copy of Tax Declaration of the Property from
the City Assessors Offic) (See. 302.02.)
(3. Certified True Copy of Curent eal Property Tax
Receipt from the Gy Treasurer's Office)
{See. 302.2011)
4.tf Applicant i:
Not the ower ofthe Lat whichever is apleabe sec 302.2
1 Notarized Deed of absolute Sale
Notanzed Contract of ease
1) Notaries Contract of Sale
5) Notarized authority to Construct fram Lot Owner
And, notarized Special Power of attomey (SPA)
exporation:
C7 Notarized secretary's Certleate appointing the authored
person who wilign for and in Beha ofthe Company
‘Sommunity Association: (or residential buildings)
Tr Association Boara Resolution
Applicant's Certificate of Membership in that Community
Association
1 city Housing clearance (if Gov't Housing Project)
3. Gy: Box 9 shouldbe signed bythe iy Administrator
. INIA: Box 9 shouldbe signed by the Regional Manager
C1 Barangay Clearance of NOSITE CONFLICT
Subalysin:
Ey] Approved Development Permit (OP) (fram SP/HLURE)
G7 Buiding tan shouldbe stamped approved by Subdivision
Administrator it appiicable)
3. Other Legal Requirements
Photocopy of Owners/Applicant’s valld.0 with thrce (3)
specimen signatures
T Photocopy of PRC ID's and current PTR’s and TIN of all the
Signing Professionals NBC MC No. 01, 2005; tem 4]
18] Technical Documents (oy Owner and Hired Professionals)
1-Appiaton teter with ly fled-up forms ofthe flowing
{ec 302)
(132. Busing Pert form with 5 sets of cvi/Archtactural
Pans duly signed and sealed by a licensed Chi
Enginer/arcitect (See 302.36 Sec. 302-45]
[3 Senitary/Phumting Permit Form with sts Plumbing Plans duly
signed and sealed by a hcensed Sanitary Engineer/Master
Plumber (Se. 302.3, Se.302]
14 Electrical Perit Form wth set Electra Plans duly signed
and sealed by aicensed (Reitered Professional) Eectncl
Engieer/Eecronc Erginet[Se. 302 2.4 Se. 302.6)
5. Mechanical Permit Form with 5 sets Mechanical Plans (if
applicable) dul signed and sealed by leenseo
{Reglstered Professional) Mechanical Engineer
(Os: Stetch/tot Pan wth Vicinity Map drawn to seale signed and
sealed by a Neensed Geodetic Engineer
{Sec, 30230, See. 30211) and Relocation Survey Plan and
Report Figure 3}
127 Projet Technical Specifications (signed and sealed) (Se. 3027
Tis. itof Matera and Cos estimates (signed and eal)
{see 302}
C2. Boring and Pate Loa Tests Result/Repor by a eensed
u/Gctechnial Engineer for bulking thre (3) storeys ad
above (Sec. 302.5.)
if ext bi for adctona storey: submit affidavit thatthe
foundation cn carry the proposed additional eos
Do structural Design Anais fora buitdnes except one (1)
storey bullings and sgl detached structure wth tot
flor area of 20se.m ores (Se. 302 5c)
Tt. semi Analysis Sec 3025)
‘Note: INCOMPLETE DOCUMENTS WiLL NOT BE ACCEPTED
(Git dawaton kung kulang ang mga dokumentc)
all forms must be filled-up properly, use black ink
only and write legibly
Recelved/Pre-Evaluated as to checkist by:
Name/Position:
Date/Time:
Signature: