i tom ‘SM Mall of Asia Block 4 @) £00 CONSTRUCTION MANAGER'S INSTRUCTION Contractor (UNIFIED MIOROSYS. i No<[SMB4_CMI_0448_GP24_0000 Work Package No, [CP-24 bates[November 25, 2019 ockage Name: [FDS and BMS. cr ret: *[NA 1 Zone: [SF Mezzanine LVSG Room Project No, tna se Oy Subject: (sth Floor Mezz LVSG Rm FM 200 Gas Suppression Systom “The Project Manager hereby instructs the Contractor to proceed with the following works in accordance with the provisions ofthe Contract: Work Required Unified Microsys is instructed to provide the cost for supply and install as well as testing and Jcommissioning of FM 200 Gas Suppression System in Sth floor mezzanine LVSG room (CAD file refer to TENMAN -GCOR-0001869) as shown in the attached highlighted drawing with an internal Jetevation of 6 meters. Unified Is required to submit a price within 14 days from the date of this CMI for evaluation by JOwner's respresentatives. [Attachments: [1 OAP_IKEAMOA_DE_SFM_FRE_O107 fev. C Issued, For and behalf of SMB Project Team # . vane Tar comes te owe oa; _HOV 25 718 ree om: 25/a (nb = consuation Director ject Distr CM = Commercial Manager Leoend UPPER FIFTH FLOOR FIRE PROTECTION LAYOUT

You might also like