CONSTRUCTION MANAGER'S INSTRUCTION
Contractor (UNIFIED MIOROSYS. i No<[SMB4_CMI_0448_GP24_0000
Work Package No, [CP-24 bates[November 25, 2019
ockage Name: [FDS and BMS. cr ret: *[NA 1
Zone: [SF Mezzanine LVSG Room Project No,
tna se Oy
Subject: (sth Floor Mezz LVSG Rm FM 200 Gas Suppression Systom
“The Project Manager hereby instructs the Contractor to proceed with the following works in accordance
with the provisions ofthe Contract:
Work Required
Unified Microsys is instructed to provide the cost for supply and install as well as testing and
Jcommissioning of FM 200 Gas Suppression System in Sth floor mezzanine LVSG room (CAD file
refer to TENMAN -GCOR-0001869) as shown in the attached highlighted drawing with an internal
Jetevation of 6 meters.
Unified Is required to submit a price within 14 days from the date of this CMI for evaluation by
JOwner's respresentatives.
[Attachments:
[1 OAP_IKEAMOA_DE_SFM_FRE_O107 fev. C
Issued,
For and behalf of
SMB Project Team
# .
vane Tar
comes te
owe oa; _HOV 25 718
ree om: 25/a
(nb = consuation Director ject Distr CM = Commercial Manager
LeoendUPPER FIFTH FLOOR FIRE PROTECTION LAYOUT