Beam 1
175
Dead load due to slab = 1000 × r.c
175
1000
× 25 = 4.375 kN/m2
𝑛𝑙𝑥 𝑙𝑥 2
Load distribution of dead load = 6
[ 3 − (𝑙𝑦) ]
5.375(3.95) 3.95
= 6
( 3 − [ 7.7 ] ) = 9.684 kN/m
𝑛𝑙𝑥 𝑙𝑥
Load distribution of live load = 6
( 3 − [𝑙𝑦]
1.5(3.95) 3.95
= 6
( 3 − [ 7.7 ] = 2.703 kN/m2
1
Dead load of beam (self-weight) = volume of beam x r.c
1
(7.7 ×0.2)+ ( 0.2×0.2 )×5.375
2
Dead load due to overhang = ( 7.7
= 1.089 kN/m
Beam 2
𝑛𝑙𝑥 𝑙𝑥 2
Load distribution = [3−( ) ]
6 𝑙𝑦
= 9.684 kN/m
𝑛𝑙𝑥 𝑙𝑥 2
Live load (due to slab) = 6
[ 3 − (𝑙𝑦) ]
1.5(3.95) 3.95 2
= 6
[ 3 − (7.74) ]
= 2.705 kN/m
Beam 3
𝑛𝑙𝑥 𝑙𝑥 2
Load distribution = 6
[ 3 − (𝑙𝑦) ]
2
= 9.684 kN/m
Dead load due to slab, overhang and beam = 9.684 + 1.089 + 4.25 = 15.033 kN/m
𝑛𝑙𝑥 𝑙𝑥 2
Live load (due to slab) = [3−( ) ]
6 𝑙𝑦
3.0(3.95) 3.95 2
= [3−( ) ] = 5.405 kN/m
6 7.7
Beam 4
𝑛𝑙𝑥 𝑙𝑥 2
Load distribution = [3−( ) ]
6 𝑙𝑦
5.375(3.95) 3.95
= 6
[ 3 − (7.74)2 ]
= 9.694 kN/m
Dead load due to slab, overhang and beam = 9.984 + 1.089 + 4.25 = 15.033 kN/m
Dead load due to partition wall = 3.5 x 2.625 = 3.5 x 2.625 x 1.975 = 18.15 kN
𝑛𝑙𝑥 𝑙𝑥 2
Live load (due to slab) = 6
[ 3 − (𝑙𝑦) ]
3.0(3.95) 3.95 2
= 6
[ 3 − (7.74) ] = 5.411 kN/m
Beam 5
Dead load due to slab = 4.375 kN/m2
3
Total load due to slab = 5.375 kN/m2
𝑛𝑙𝑥 𝑙𝑥 2
Load distribution = 6
[ 3 − (𝑙𝑦) ]
= 9.684 kN/m
Dead load due to slab, overhang and beam = 9.684 + 1.089 + 4.25 = 15.033 kN/m
𝑛𝑙𝑥 𝑙𝑥 2
Live load (due to slab) = 6
[ 3 − (𝑙𝑦) ]
3.0(3.95) 3.95 2
= 6
[ 3 − ( 7.7 ) ] = 5.405 kN/m
Beam 6
Dead load due to slab = 4.375 kN/m2
𝑛𝑙𝑥 𝑙𝑥 2
Load distribution = [3−( ) ]
6 𝑙𝑦
5.375(3.95) 3.95
= 6
[ 3 − (7.74)2 ]
= 9.694 kN/m
Dead load due to slab, overhang and beam = 9.984 + 1.089 + 4.25 = 15.033 kN/m
Dead load due to partition wall = 3.5 x 2.625 = 3.5 x 2.625 x 1.975 = 18.15 kN
𝑛𝑙𝑥 𝑙𝑥 2
Live load (due to slab) = 6
[ 3 − (𝑙𝑦) ]
4
3.0(3.95) 3.95 2
= [3−( ) ] = 5.411 kN/m
6 7.74
Beam 7
Dead load due to slab, overhang and 200mm wall = 9.684 + 1.089 + 9.1875 = 19.96 kN/m
Dead load due to beam = 3.0 kN/m
Dead load due to 200mm partition wall = 3.5 x 2.625 x 1.3 = 11.94 kN
Total dead load = 22.96 kN/m
Live load = 5.405 kN/m
Beam 8
Dead load due to slab, overhang and 200mm wall = 9.694 + 1.089 + 9.1875 = 19.97 kN/m
Dead load due to slab and overhang = 9.984 + 1.089 = 10.783 kN/m
Dead load due to 200mm partition wall = 1.975 x 2.625 x 3.5 = 18.15 kN
Total dead load = 22.97 kN/m
Live load = 5.411 kN/m
5
The frame below illustrates a labeled line diagram of the above frame A-A.
7700 7740
A B C
3225
E
D F
3225
G H I
3225
J K L
1700
M O
N
6
The extract from Clause 3.2.1.2.1 of BS 8110 states that: “The moments, loads and shear forces to be
used in the design of individual columns and beams of a frame supporting vertical loads only may be
derived from an elastic analysis of a series of sub-frames. Each sub-frame may be taken to consist of the
beams at one level together with the columns above and below. The ends of the columns remote from the
beams may generally be assumed to be fixed unless the assumption of a pinned end is clearly more
reasonable.”
7
Beam ELEMENT GK QK Load at Ultimate Point load Point load
number (kN/m) (kN/m) service load at service at ultimate
(kN/m) (kN/m) (kN) (kN)
= =
1.0Gk+1.0Qk 1.4Gk+1.6Qk
Beam 1 AB 15.020 2.703 17.723 25.353 - -
Beam 2 BC 15.023 2.705 17.728 25.360 - -
Beam 3 DE 24.210 5.405 29.615 42.542 - -
Beam 4 EF 24.21 5.411 29.621 42.56 18.15 25.41
Beam 5 GH 24.210 5.405 29.615 42.542 - -
Beam 6 HI 24.21 5.411 29.621 42.56 18.15 25.41
Beam 7 JK 22.960 5.405 28.365 40.792 - -
Beam 8 KL 22.97 5.411 11.94 16.72
28.381 40.816
18.15 25.41
First of all, we will sketch the sub- frames with their loadings.
8
For the first condition, the udl load is the same for all beams and the value is found using the
equation 1.4 ∗ 𝑑𝑒𝑎𝑑 𝑙𝑜𝑎𝑑 + 1.6 ∗ 𝑙𝑖𝑣𝑒 𝑙𝑜𝑎𝑑.
1. 7.700m 7.740m
25.353kN/m 25.360kN/m
A B C
3.225m
D E F
9
dEB = 0
dFC = 0
MFBE = 0
MFEB = 0
23.353(7.70)2 25.36(7.74)2
MFBA = 12
= +115.4 kNm MFCB = = + 126.6 kNm
12
MFCF = 0
MFFC = 0
Step 3:
A B C
10
A D B E C F
FEM 0 0 0 0 0 0
7.700m 7.740m
91.13kNm
79.6kNm
25.353kN/m
B B 25.36kN/m
A
C
137.06kNm
140.57kN
∑MA =0, ∑M m=0,
B
∑V=0 ∑V=0
RA – 25.353(7.7) + 105.06 = 0 RB – 25.36(7.74) + 91.8 = 0
RA=90.16 kN RB=104.5 kN
11
79.6kNm 3.707kNm 91.13kNm
A B C
3.225m
D E F
39.85kNm 45.53kNm
1.742kNm
12
7.700m 7.740m
25.35kN/m 25.36kN/m
A B C
3.225m
D E F
Shear force
(KN) 104.5kN
90.16kN
Distance (m)
3.6m 7.7m 11.8m 15.4m
1.69kN
-91.8kN
-37.04kN
42.37kN
-105.1kN
B.M
(KNm) -140.6kNm
-91.13kNm
-137.1kNm
-3.707kNm
-79.6kNm
Distance (m)
3.85m 7.7m 11.75m 15.4m
-79.6KNm
91.13
kNm
13
1.74kNm
39.85kNm
91.07
-45.53kNm
79.00kNm kNm
2.
7.700m 7.740m
A B C
25.41kN
3.225m
42.542kN/m
42.56kN/m
D E
F
G H I
Joint E Check ∑ 𝑑 = 1
14
𝐸𝐼𝐸𝐷 187
𝐾𝐸𝐷 = = 9.35 × 105 𝐸 𝑑𝐸𝐷 =
7700 637
𝐸𝐼𝐸𝐵 ∑ 𝐾 = 3.19 X 106 E 132
𝐾𝐸𝐵 = = 6.60 × 105 𝐸 𝑑𝐸𝐵 =
3225 637
𝐸𝐼𝐸𝐹 186
𝐾𝐸𝐹 = = 9.30 × 105 𝐸 𝑑𝐸𝐹 =
7740 637
𝐸𝐼𝐸𝐻 132
𝐾𝐸𝐻 = = 6.60 × 105 𝐸 𝑑𝐸𝐻 =
3225 637
Joint F Check ∑ 𝑑 = 1
𝐸𝐼𝐹𝐶 223
𝐾𝐹𝐶 = = 2.23 × 106 𝐸 ∑ 𝐾 = 5.40 X 106 E 𝑑𝐹𝐶 =
3225 540
𝐸𝐼𝐹𝐸 94
𝐾𝐹𝐸 = = 9.30 × 105 𝐸 𝑑𝐹𝐸 =
7740 540
𝐸𝐼𝐹𝐼
𝐾𝐹𝐼 = = 2.23 × 106 𝐸 223
3225 𝑑𝐹𝐼 =
540
𝑑𝐴𝐷 = 0 , 𝑑𝐻𝐸 = 0
𝑑𝐺𝐷 = 0 , 𝑑𝐶𝐹 = 0
𝑑𝐵𝐸 = 0 , 𝑑𝐼𝐹 = 0
15
−42.542(7.70)2 MFAD=0
MFDE = = -210.19 MFDG=0
12 −42.56(7.74)2 25.41(2.14)(5.60)2 MFDA=0
kNm MFEF = 12
− (7.74)2 MFGD=0
= -240.94 kNm MFBE=0
MFEB=0 MFEH=0
D E F
67 187 186 94
d 387 637 637 540
-210.19 210.19 -240.94 223.35
FEM
36.38948 9.02708 8.978807 -38.8794
BAL
4.51354 18.19474 -19.4397 4.489403
CO
-0.78141 0.365481 0.363527 -0.78149
BAL
0.18274 -0.39071 -0.39074 0.181763
CO
-0.03164 0.229406 0.228179 -0.03164
BAL
0.114703 -0.01582 -0.01582 0.114089
CO
-0.01986 0.009288 0.009238 -0.01986
BAL
-169.822 237.6095 -251.207 188.4228
End Moments
A D B C F
E
d 160 132 0
223
0 0 540
387 637
FEM 0 0 0 0 0 0
16
BAL ... 86.90 ... 6.372 ... -92.235
CO 43.45 ... 3.186 ... -46.118 ...
BAL ... -1.866 ... 0.258 ... -1.36
CO -0.933 ... 0.129 ... -0.927 ...
BAL ... -0.076 ... 0.162 ... -0.075
CO -0.038 ... 0.081 ... -0.038 ...
BAL ... -0.047 ... 0.007 ... -0.047
End Moments 42.479 84.911
3.396 6.799 -47.082 -94.211
G D H E I F
160 132 0
223
d 0 0 540
387 637
FEM 0 0 0 0
0 0
BAL ... 6.372 ... -91.05
... 86.90
CO 3.186 ... -45.52 ...
43.45 ...
BAL ... 0.258 ... -1.36
... -1.866
CO 0.129 ... -0.681 ...
-0.933 ...
BAL ... 0.162 ... -0.0599
... -0.076
CO 0.081 ... -0.0299 ...
-0.038 ...
BAL ... 0.007 ... -0.035
... -0.047
3.396 6.799
End Moments -47.082 -94.211
42.479 84.911
D E F
3.225m
G H I
F
42.48kNm
3.396kNm 47.082kNm
17
∑MD =0, ∑ME =0, ∑MF =0,
42.48 -RG(3.225)+ 3.396 - RH(3.225) + 47.082 – RI (3.225) +
84.91= 0 6.799= 0 94.21= 0
RG = 39.50 kN RH = 3.16 kN RI = 43.81kN
7.700m 7.740m
188.42 kNm
169.82kNm 25.41kN
42.542kN/m
42.56kN/m
E E
D
F
2.14m 5.60m
237.61kNm
251.207kNm
∑MD =0, ∑ME =0,
169.082 – 42.542x7.72/2 + RE(7.7) -237.61 = 0 251.207– 42.56x7.742/2 – 25.41(2.14)+
RF(7.74) -188.42 = 0
RE =172.69 kN
RF = 163.62kN
∑V=0
∑V=0
RE – 42.56 (7.74) -25.41 + 163.62 = 0
RD – 42.542(7.7) + 172.69= 0
RE = 191.20 kN
RD=154.87 kN
3.225m
D E F
F 18
84.91kNm
6.799kNm 94.21kNm
A B C
42.542kN/m 25.41kN
3.225m
42.56kN/m
D E F
3.225m
2.14m 5.60m
G H I
Shear
force (kN) 191.20kN
43.81kN
-39.5kN
3.16kN
157.85kN
11.6m 15.4m
3.8m
-172.69kN -163.62kN
B.M
-84.91KNm
-6.799kNm
(KNm)
94.21kNm
19
-169.82kNm -251.21kNm
-237.61kNm -188.42kNm
Distance (m)
3.8m 15.4m
42.48kNm
47.082kNm
111.53kNm
3.396kNm
170.8kNm
3. 7.700m 7.740m
D E F
25.41kN
3.225m
42.542kN/m
42.566kN/m
G H
I
J K L
Shear
force (kN) 191.20kN
43.81kN
-39.5kN
3.16kN
157.85kN
11.6m 15.4m
3.8m
-172.69kN -163.62kN
B.M
(KNm)
20
-84.91KNm
-6.799kNm
94.21kNm
-169.82kNm -251.21kNm
-237.61kNm -188.42kNm
Distance (m)
3.8m 7.7m 15.4m
42.48kNm
47.082kNm
111.53kNm
3.396kNm
170.8
4. 7.700m 7.710m
kNm
G 16.72kN H I
25.41kN
40.79kN/m 3.225m
40.81kN/m
J K
L
2.28m 5.42m 2.32m 1.700m
5.42m
M N O
21
Joint K Check ∑ 𝑑 = 1
𝐸𝐼𝐾𝐽 52
𝐾𝐾𝐽 = = 2.08 × 105 𝐸 𝑑𝐾𝐽 =
7700 505
𝐸𝐼𝐾𝐻 165
𝐾𝐾𝐻 = = 6.60 × 105 𝐸 𝑑𝐾𝐻 =
3225 505
𝐸𝐼𝐾𝐿 ∑ = 2.02 X 106 E 51
𝐾𝐾𝐿 = = 2.07 × 105 𝐸 𝑑𝐾𝐿 =
7740 505
3 3 𝐸𝐼𝐾𝑁 237
𝐾𝐾𝑁 = . = 9.40 × 105 𝐸 𝑑𝐾𝑁 =
4 4 1700 505
Joint L Check ∑ 𝑑 = 1
𝐸𝐼𝐿𝐼 223
𝐾𝐿𝐼 = = 2.23 × 106 𝐸 𝑑𝐿𝐼 =
3225 562
∑ = 5.62 X 106 E
27
𝑑𝐿𝐾 =
562
𝐸𝐼𝐿𝐾
𝐾𝐿𝐾 = = 2.07 × 105 𝐸 312
7740 𝑑𝐿𝑂 =
562
3 3 𝐸𝐼𝐿𝑂
𝐾𝐿𝑂 = . = 3.18 × 106 𝐸
4 4 1700
Joint G,H,I(Fixed ends )
M,N&O (pinned ends) Check ∑ 𝑑 = 1
𝑑𝐺𝐽 = 0 , 𝑑𝑂𝐿 = 1
𝑑𝑀𝐽 = 1 , 𝑑𝐼𝐿 = 0
𝑑𝐻𝐾 = 0 , 𝑑𝑁𝐾 = 1
22
MFKN=0
MFNK=0
MFGJ=0
−40.79(7.70)2 16.72(2.28)(5.42)2 −40.81(7.74)2 25.41(5.42)(2.32)2 MFJG=0
MFJK = 12
− (7.70)2
= MFKL = 12
− (7.74)2
J K L
52 51 27
d 0.037
505 505 562
FEM -220.42 209.48 -216.109 232.643
G J H K I L
165 223
d 0 0.397 0 0 562
505
FEM 0 0 0 0 0 0
23
CO 43.753 ... 1.083 ... -46.156 ...
M J N K O L
237 312
d 1 0.566 1 505
1 562
FEM 0 0 0 0 0 0
CO
(Release sup M,N,O) 0 ... 0 ... 0 ...
MODIFIED FEM 0 0 0 0 0 0
24
7.700m 7.740m
214.39kNm
220.88 kNm
∑MJ =0,
∑MK =0,
211.86– 40.79x7.7 /2 – 16.72(2.28)+ RK(7.7)
2
220.88 – 40.81x7.742/2 – 25.41(5.42)+
-214.39 = 0
RL(7.74) -221.85 = 0
RK = 162.32 kN
RL = 175.85 kN
∑V=0
∑V=0
RK – 40.81 (7.74) -25.41 + 175.85 = 0
RJ – 40.79 (7.7) -16.72 + 162.32 = 0
RK = 165.43 kN
RJ=168.48 kN
42.69kNm 1.33kNm
46.22kNm
G H I
3.225m
J K L
F
87.34kNm
2.66kNm 92.48kNm
25
124.50kNm 3.83kNm 129.38kNm
K L
J
1.700m
M O
N
F
26
4. 7.700m 7.710m
G 16.72kN H I
25.41kN
40.79kN/m 3.225m
40.81kN/m
K
J L
2.28m 5.42m 2.32m 1.700m
5.42m
M N O
Shear
force (kN) 165.43kN
-40.3kN
116.5kN
kN
-1.24
168.48kN
43.0kN
80.2kN
Distance (m)
3.8m 7.7m 11.6m 15.4m
-2.25 kN
-73.24kN
76.11kN
-175.85kN
-162.32kN
B.M
-1.33kNm
(kNm)
-42.69kNm
46.22kNm
211.86kNm -220.88kNm
-87.34kNm
-214.34kNm -237.9kNm
Distance (m)
124.50kNm
129.38kNm
2.66kNm
11.6m
-92.48kNm
3.8m 7.7m
3.83kNm
108.45kNm
113.93kNm
27
28