You are on page 1of 1
Roof prafie (supplied by factory and to apply on jobsite) rm 500 — ~ ses by factory ref eply on ate) (supplied by others) Ue Me others to apply on job-site) Screw — Panel 1- SECTION JUNCTION 2- ROOF JUNCTION (supoled by others) Panel few qty 1/ mm.500 Gasket (supped hers by factory to apply (on josie) Root Screw ay 1 ineach side Panel poled by athers) supplied by factor Gasket (supplied {0 apply on jobsite) by factory 10 apply (on josie) 4- OVERLAP OF TWO SECTIONS WITH BASEFRAME Sticon(suppied by others to apply on ob-ste) 5- OVERLAPPED SECTION JUNCTION factory to apaly on job-site) ‘Apply gasket (supplied by factory to apply on job-ste) Roof screw with rubber washer (supplied by factory ta instal on jobsite), to fx the roof mata ‘sheet fo the structure below, screw ly 1/ mm 800 (rin. ty 2 each si Top se Base of top section Foxing ange (supplid by factory to install on job _sparatly wh ‘compete of bos and Bottom Part Section 7- ROOF INSTALLATION SUPPLIED IN KIT On request, roof will be factory mounted; in this case, do not refer to drawing n.2.and 1.6. In case of roof presence, outer skin of top panel is made of galvanised steel; due to that, itis mandatory to install the root. bbebvoon water and backs to apply on obs Gasket (supplied by factory to apply (on job-sit) 3. JUNCTION TWO SECTIONS WITH DIFFERENT DIMENSIONS To fix by siicon and by serous Top Part [sled ote} rt 8. JUNCTION OF RECUPERATOR SECTION COMPOSED BY TWO PARTS Rev. 31102015

You might also like