1 Research Staff : Full time/Part-time/Hired 2,20,000
Services
2 Fieldwork: Travel/Logistics/Boarding, etc. 1,50,000
including Books/Journals 3 Equipment and Study material: computer, 50,000 printer etc / Source Material/Software and Data Sets, etc. 4 Contingency 25,000 5 Publication of Report 15,000 TOTAL 4,60,000 7 Institutional Overheads (over and above the 20,000 total cost of the project)