you intend to overcome them while carrying out the Contract works.

Please submit the method statement on how you intend to construct the

…………………………………………

(example :- construction of transfer slab/beam, construction of RC feature wall,

construction of shear wall, application of system formwork, method to control


verticality of structure, method to control heat hydration for concrete high grade,

method of casting different concrete grades between the horizontal and vertical

elements. etc)

Please submit construction sequence of the r.c. roof slab, swimming pool

and water tank to ensure water-tightness especially at the construction joint