You are on page 1of 3
ier2018 ‘Aconex costa Foster+Partners »—» 5 2 seoconatas: Soo ‘ARUP + NACO * KEO MAIL TYPE MAIL NUMBER REFERENCE NUMBER Safety Violation Report SVR-F&P-LKW-000980 SVR-F&P-LKW-000980 Fall Hazard: Working at height on the temporary tower platform by Mega Yapi worker From e ce (tt) Date Respond by status DETALS SVR Date Description / Details ‘Applicable Penalties hntps:imea.aconex.corvLegon Mr Shenoy Rodrigues - 72 Consultant - FAP Mr chara Meredith -Limak Mr Mohamed Feton - imak (+10 more.) ‘Wednesday, 6 November 2019 10:50:39 AM AST (GMT +03:00) osyi1/2019 Draft osii12019 Risk of and injury due to: + Worker working lone on the temporary tower platform at CT terminal entrance from westside without ‘supervision and Site Engineer (Mr. Mohd Talha Byder) responsible from Mega Yapi was nat present for briefing ‘about safe working and ensure al the fall protection ang prevention contol measures was in place. + Poor ilumination onthe temporary tower platform with openings. + No PTW to go up and work safely + Manual handling of ste! platform board alone. (Dropped object hazard), + No rescue plan and the maniift basket left the area ater taking the work up on the platform, + No supervision and no toolbox talks given forthe worker before going up. (Clause 3.7 — Protection and safety of workers and works onsite, Failure to follow sate system of work) Refer tothe attached photographs for reference. Further tothe requirements of sub-clause 48 ofthe Particular Conditions, the ContractoriSubcontractor/Employee has been found to contravene safety regulations, Accordingly, the safely penalties as indicated inthe aforementioned subclause will be appli. Refer to the attached photographs. Deni evidence that Safety Alaris wore communicated to the workforce Ie required fo Clage this SVR, Penaity Applicable: KD 2501: Document I-2 Particular Conditions Clause No 4.8 in General specafcation, Document i:2 Spectication, Section 01 35 20, Para 1.09(Aceident Prevention Responsibly): Para 1.13{General Construction); Para 1.20(Worker Induction): Para 1.17(Work at Height) we 11672019 Aconex. ATTRIBUTES. Atibute 1 Health & Safety Attibute 2 00 - Project Wide Contractual Issues MESSAGE Risk of fall and injury due to: + Worker working lone on the temporary tower platform at CT terminal entrance from west side without supervision and Site Engineer (Mr. Mohd Talha Byder) responsible from Mega Yepi was not present for briefing about safe working and ensure all the fall protection and prevention control measures was in place. + Poor illumination on the temporary tower platform with openings. ‘No PTW to go up and work safely. + Manual handling of steel platform board alone. (Dropped object hazard). + No rescue plan and the manlift basket left the area after taking the work up on the platform, + No supervision and no toolbox talks given for the worker before going up. (Clause 3.7 ~ Protection and safety of workers and works on site, Failure to fallow safe system of work) Refer to the attached photographs for reference, Further to the requirements of sub-clause 4.8 of the Particular Conditions, the Contractor/Subcontractor/Employee has been found to contravene safety regulations. Accordingly, the safety penalties as indicated in the aforementioned subclause will be applied. Refer to the attached photographs. Definitive evidence that Safety Alerts were communicated to the workforce is required to Close this SVR. curt NicHolal Reviewed by Prepared by Jom MeLachlan ye fe ane hitps:Imea.aconex.com/Logon Foster+Partners Gulf Consult MINISTRY OF PUBLIC WORKS ARUP NACO KEO 1 TERMINAL-2 ORT (SVR) Central ter Booey fia 4 Nov 2019 7:55:40 pm Cee Clan aF||

You might also like