19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta
Structural System
• Tower:
- Dual System
(shear wall + moment frame)
85% 15%
- Prestressed Beam
• Podium:
- moment frame
2. Material properties
f’c_column = 31.1 MPa
f’c_beam = 26.7 MPa
f’c_shear wall = 31.1 MPa
fy_expected = 1.15 x 400 Mpa
TOWER
18
19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta
Tower Modeling in ETABS and in PERFORM
3D
ETABS PERFORM 3D
T1 (sec) 3,53 3,45
T2 (sec) 3,09 3,21
MODE 1 TRANSLASI - Y TRANSLASI - Y
MODE 2 TRANSLASI - X TRANSLASI - X
Summary:
ETABS model is consistent with PERFORM 3D’s
D F
demand
PP
capacity
F
M M
IO LS CP
YIELD
θ θ
YIELD
LS IO
CP
M M
IO LS CP
YIELD
θ θ
YIELD
LS IO
CP
IO LS CP
LS CP
sc IO
ec
19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta 26
Pemodelan Perform 3D Dinding Geser
Pemodelan Elemen Dinding Geser:
Pemodelan elemen dinding geser pada PERFORM 3D menggunakan fiber element yang bergantung dari parameter
berikut :
a. Hubungan tegangan-regangan aksial beton
b. Hubungan tegangan-regangan aksial baja tulangan
c. Hubungan tegangan-regangan geser beton
Fiber Beton
Fiber Baja Tulangan
Web Boundary Teori
(Unconfined) (Confined) Mander
DOF
D
F demand
PP
capacity
F
30 30
25 25
Story Number
20 20
15 15
10 10
5 5
0 0
0 100000 200000 300000 400000 500000 600000 700000 800000 900000 0 200000 400000 600000 800000 1000000
2.Lateral Push
Y+
X- X+
Y-
19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta 32
Methodology
D
F demand
PP
capacity
F
Tr = 200 yrs
Tr = 500 yrs Tr = 2500 yrs
Pf = 10 % in 20 yrs
Pf = 10% in 50 yrs Pf = 2% in 50 yrs
19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta 34
1987 Code Level Design Base Shear
PP CP
LS
IO
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
CP
PP LS
IO
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
CP
PP LS
IO
19/07/2019
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
X- Y+ Y-
X+
(IO LEVEL)
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
IO
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
IO
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
X- Y+ Y-
X+
(CP LEVEL) (LS LEVEL) (IO LEVEL)
(CP LEVEL)
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
IO
PP LS CP
IO
Gaya Geser Tingkat Nominal pada Core Wall (Vc+Vs) > Vn (OK)
X- Y+ Y-
X+
(CP LEVEL) (LS LEVEL) (IO LEVEL)
(CP LEVEL)
PODIUM
58
19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta
3D Model ETABS Podium
LL + GF + 3 Lantai
Lantai GF Lantai 2
Lantai 3
Lantai 1
19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta 60
Mode Shape Podium
Tr = 200 yrs
Tr = 500 yrs Tr = 2500 yrs
Pf = 10 % in 20 yrs
Pf = 10% in 50 yrs Pf = 2% in 50 yrs
19/07/2019 Retrofitting Gedung Tinggi Beton Bertulang di Jakarta 62
1987 Code Level Design Base Shear
50000
40000
Base Force (kN)
Push X+
30000 CP
LS
20000
IO
PP
10000
PP
0
-50 0 50 100 150 200
Displacement (mm)
50000
40000
Base Force (kN)
Push X-
30000 CP
LS
20000 IO
PP
10000
PP
0
0 50 100 150 200
Displacement (mm)
70000
60000
Base Force (kN)
50000
Push Y+
40000 CP
LS
30000
IO
20000
PP
10000
PP
0
0 50 100 150 200 250
Displacement (mm)
70000
60000
Base Force (kN)
50000
Push Y-
40000 CP
LS
30000
IO
20000 PP
10000
PP
0
-50 0 50 100 150 200 250
Displacement (mm)
50000
40000
PP
Base Force (kN)
Push X+
30000 PP
CP
20000 LS
IO
10000
0
-50 0 50 100 150 200
Displacement (mm)
50000
40000
PP
Base Force (kN)
Push X-
30000 PP
CP
20000 LS
IO
10000
0
0 20 40 60 80 100 120 140 160 180 200
Displacement (mm)
70000
60000
Base Force (kN)
50000
Push Y+
40000
PP PP
CP
30000
LS
20000
IO
10000
0
0 50 100 150 200 250
Displacement (mm)
70000
60000
Base Force (kN)
50000
Push Y-
40000
PP CP
PP
30000
LS
20000 IO
10000
0
0 50 100 150 200 250
Displacement (mm)
3.Damage concentrated at
- Columns with smaller dimension
- Columns with transfer beam
50000
PP
Base Force (kN)
40000
Push X+
30000 PP
CP
20000
LS
10000
IO
0
-50 0 50 100 150 200
Displacement (mm)
50000
PP
Base Force (kN)
40000
Push X-
30000 PP
CP
20000
LS
10000 IO
0
0 50 100 150 200
Displacement (mm)
50000 Push Y+
40000 PP PP
30000 CP
20000 LS
10000 IO
0
0 50 100 150 200 250
Displacement (mm)
50000 Push Y-
40000
PP PP
30000 CP
20000 LS
10000 IO
0
-50 0 50 100 150 200 250
Displacement (mm)
1. Review of Structures
- Structural system of a tower: dual system
- Geometry and dimension conform to as-built drawing
- No structural problem was found based on visual observation
- Existing concrete strength (f’c)
f’c_column = 31.1 MPa
f’c_beam = 26.7 MPa
f’c_shear wall = 31.1 MPa
1. Tower
- under ‘frequent earthquake’ little inelasticity / no - minor
damage is expected
2. Podium
- under ‘frequent earthquake’ some inelasticity occured /
minor damage is expected