Labor Progress Details

Date: __________ Tracking Time: __________

Project: __________ Scaffolder: __________ Labour:________________

Tower: __________ Mason: __________ Miscellaneous: __________

Daily Work Taken from Labour


____________________________________________________________________________________

Example:

1. Floor: 4th From Grid 1-8 to A-K, Apartment No. 2, Block Masonry 60% and Internal plaster: 80%
2. Floor: 2nd From Grid 9-16, Apartment No. 3, Sanitary Work in Attached Bathroom: 60% , tile work:
40%
3. Floor: 4th Grid 1-8 Apartment No. 2, plastering of the walls: 100%, Balcony Plastering: 70 %
4. Floor: 1st Grid: Block Masonry of the apartment walls: 60%, windows and door frames of the
apartment: 30%
Site Engineer: _____________