You are on page 1of 1
Government of West bere Public Works Deparment Works Branch abanna, Howsah wo, aoe q(cyaMaeeis Dated:2407 2035 trom : he Jit Secretaryto the Gov of West Bena .W. Department to soe Cit Engineer, .W Directorate Sub. Administrative approval for proposed constuction of office building (G5) ofthe Chet Engineer, PWD, West Zone & ‘hel Engineer, (RD, West Zone at Durgapur Phase: ‘The undersigned is directed by order of the Governor to say that the Governor has been pleased to accord ‘a¢ministrative approval to the above noted work/ scheme at an estimated cost of Rs.984.37 lakh (Rupees Nine Hund wed {ighty Four Lakh and Thirty Seven Thousand) only Including contingency charge @3% on the estimated cost. ‘The charge on this account will be debited to the head of AVc : “4059 - Capital Outlay on Public Works - 01 ~ Office ‘buildings ~ 051 ~ Construction ~ SP - State Plan (Annual Plan & Xi!" Plan) —012 ~ Construction of Office Buildings of PWD Civil {PW} V- Voted ~53 - Major Works/Land & Bulldings" under Demand No.25 during the Financial year 2015-2016. ‘This order is Issued with the concurrence of the Financlal Adviser, PWO vide his U.0.No.t20AA/2015-2016 dated 23.07.2015, Pw. Department No, :354/3113}-WiC) bated: 28.07.2035, hos Aird kc iptomatoc etenesety a 6 1th rnd Accountant General (ARE), West Beng 2 the Accoumant General (Aud), West nas Esouomicaen agatha Re 1 espera Gerral(. 6 Seton), vet angel $ the acnurant General (RW/LBA), West Begs 6-Tae France Departmes roup-P 2 tue Fane (Bde Department 1 the ancl aie, Deparment 9: The Treasury Oe, Asso reser {t,accunt branch of ths Departmen 11 the rr Seretag tothe Principal Secreta, P.M. Départment soin Sea, Department, No, :384/2(3)-9(C) ated: 24.07.2035. Copy forwarded for information & necessary action to: 1. The Chief Engineer, West Zone, P.W. Directorate. 2, The Superintending Engineer, Western Circles, P.W.Directorate. 3. The Executive Engineer, Asansol Divison, P.W.Directorate. Sy Joint $e P.W, Department , mn

You might also like