Professional Documents
Culture Documents
a) 10
b) 16
c) 12
d) 14
Question 2: A local train leaves Vijayawada for Guntur at 9:00 AM. The total distance from
Vijayawada to Guntur is 60 km. Another express train leaves for Guntur from Vijayawada, 10
minutes later. The speed of both the trains is 60 kmph. However, the local train has 19 uniformly
spaced stops while the express train has 4 uniformly spaced stops. The trains stop at each stop
for one minute and these stops do not include the destination. At what distance from Guntur will
the second train overtake the first train? (Assume these two trains run on parallel tracks and no
other trains run during this time)
a) 18 km
b) 21 km
c) 39 km
d) 42 km
Question 3: In a 200 m race, Abhay beats Chetan by 40m and Chetan beats Kundan by 20 m. If
Abhay and Kundan were to run a 500 m race, then by what distance will Abhay beat Kundan?
a) 80m
b) 120m
c) 140m
d) 60m
[Download PDF]
CAT Questions on Circles
a) 6th
b) 5th
c) 7th
d) 4th
Question 5: A group of certain number of men can complete a job in 5 days. On every alternate
day starting from second day, 3 men are withdrawn from the job and on every alternate day
starting from third day, 2 men are added to the job. If the job is completed in 6 days, what is the
number of persons who started the job?
a) 10
b) 12
c) 15
d) Cannot be determined
Question 6: A and B ran a race of 200 m from point X to point Y. A defeated B by 20 m. They
decided to compete again but this time they decided that A would run from 5 m further behind X
and B would run from a point 15 m ahead of X. Who would win the race in this case?
a) It will be a tie
b) A will win by 0.5 m
c) A will win by 1 m
d) B will win by 1 m
Question 7: Ashok can complete one-fourth of a piece of work in 6 days, Shiva can complete
one-third of the same work in 8 days and Rahul can complete one-fifth of the work in 4 days.
Ashok, Rahul, and Shiva start working on the work together for 5 days after which Ashok and
Rahul stop working. How many days more would Shiva take to complete the work?
a) 46
b) 47
c) 48
d) 49
Question 9: An inlet pipe can fill a tank in 8 hours. An outlet pipe can empty the same tank in 12
hours. Initially the tank is completely empty. At this point of time, the inlet pipe is connected to
the tank. After 3 hours, the outlet pipe is also connected to the tank. After how much time from
the beginning, will the tank be full?
a) 15 hours
b) 18 hours
c) 20 hours
d) 24 hours
e) 22 hours
Question 10: Ram can beat Shyam by 40 meters in a race. If Ram starts from a point which is
20 metres behind the start line and Shyam starts from the start line, Ram will still beat Shyam by
24 metres. What is the length of their race?
a) 100 m
b) 150 m
c) 200 m
25 Mocks + 30 Sectionals
d) 250 m
e) 500 m
for Rs. 1400
1) Answer (D)
In a given time, one fill pipe cancels out two drain pipes, and we require 5 more fill pipes to fill
the tank in 3 minutes. So the number of pipes would be in the form of 3x+5.
Among the given options only ‘14’ is in the form of 3x+5.
So the correct option to choose is D.
3) Answer (C)
In the time that Abhay runs 200 m, Chetan runs 160m so the ratio of speeds of Abhay and
Chetan is 5:4
In the time Chetan runs 200m, Kundan runs 180m. So the ratio of speeds of Chetan and Kundan
is 10:9
Thus we can say that in the time that Chetan runs 160m, Kundan runs 160*9/10 = 144 m
Thus in a 200 m race, Abhay will Kundan by 56m. Thus in a 500 m race, Abhay will beat
Chandan by 56*2.5 = 140m
4) Answer (A)
Let total amount of work to be done is 48 units. So Ram does 8 units of work in one day while
Shyam does 6 units of work in one day. Together they will be able to do 14 units of work in 1
day. So in 2 days they will finish 28 units of work. Now remaining work is 20 units. If Shyam
continues to work, he will finish the work on the [20/6] = 4th day.
So the work will be completed on the 4 + 2 = 6th day.
Hence the correct answer is option a.
5) Answer (C)
Let the number of men who worked on day-1 be ‘n’.
The number of people working each day starting from day-1 will be,
n, n-3, n-1, n-4, n-2, n-5.
This work is equal to the work done by ‘n’ men in 5 days.
So, 6n-15 = 5n => n = 15.
[Download PDF]
Previous Year CAT LR Questions
6) Answer (B)
In the time A ran 200 m B ran 180 m, during the first race.
So the ratio of speeds of A and B is 200:180 = 10:9.
In the second race the distance to be covered by A is 205 m.
In the time A covers 405 m B would cover,
205*(9/10) = 184.5 m.
But B has to run 185 m to finish the race.
So A defeats B by 0.5 m.
7) Answer (D)
8) Answer (C)
The ratio of efficiencies of Mohan and Shyam is 2:3. So let Mohan does 2 units of work in a day
while Shyam does 3 units of work in a day.
The ratio of time taken by Shyam and Anil is 1:3, so the ratio of efficiencies of Shyam and Anil is
3:1
=> Anil does 1 unit of work in a day
=> So when all 3 are working together, the total work done in one day = 3 + 2 + 1 = 6 units
Total work which they do = 6*24 = 144 units
Now if only Mohan and Anil are working, then they will finish 2+1 = 3 units of work in one day. So
total time required for them to finish the work = 144/3 = 48 days.
[Download PDF]
Pie Chart Questions for CAT