Schedule

For
Cleaning Water Tanks

Responsible: Ameer Hussain

Executer: Farhan Ali Plumber along with two cleaners

Day: Thursday

Accommodation

B A
1st Time 2nd Time
Time 8:00 A.M Time: 2:10 Pm
Note: Must be finished within an hour, Note: Office 1 staff must be
Plumber should Acknowledge Cooking- acknowledged before cleaning job.
-staff before starting cleaning Job.

Important Pre-Cautions

 Make sure safe work practice.


 Water pump circuit breaker must be switched off.
 Float Switch must be removed safely, if it is necessary, Remove float switch connections.
 After Cleaning job done, check whether pump and float switch are working or not.
 Check water inlet and outlet, also check pressure pump.
 Finally ensure all equipments and water supply going normal.

Note: If there is another important work happens, the cleaning day can be changed either On
Saturday or Wednesday.