Professional Documents
Culture Documents
= 7 x 6
= 42 m
Pondasi = 14 + 12 = 26 M'
4 + 6.25 = 10.25 M'
36.25 M'
J1 = 5 bh
P1 = 2 bh
P2 = 1.00 bh
BV = 1 bh
J= 5 bh
Luas Lubang = 0.6 x 1.4 x 5=
Kusen kayu kelas II = 0.06 x 0.12 x 4.32 x
Bingka jendela kayu kelas II = 1.3 x 0.5 x 5
Kaca Mati 5 mm = 0.38 x 1.18 x 5
Engsel jendela = 2x 5= 10 bh
Grendel jendela = 2x 5= 10 bh
Hak angin = 2x 5= 10 bh
Tarikan = 1x 5= 5 bh
P1 = 1 bh
Luas Lubang = 0.9 x 2.15 x 1=
Kusen kayu kelas II = 0.06 x 0.12 x 5.36 x
Daun pinti panel kayu kelas II = 0.82 x 2.1 x 1
Engsel pintu = 3x 1= 3 bh
konci = 1x 1= 1 bh
grendel = 2x 1= 2 bh
Tarikan = 1x 1= 1 bh
P2 = 1 bh
Luas Lubang = 0.82 x 2.15 x 1=
BV = 1 bh
Luas Lubang = 0.2 x 0.3 x 2x
Kusen kayu kelas II = 0.03 x 0.12 x 1x
Cat kusen = 0.18 x 1x 2x
REKAP
Luas Lubang = 8.018
Volume Kusen = 0.20
Daun pintu = 1.72
Daun jendela = 3.25
Kaca mati 5 mm = 2.24
cat kusen = 13.87
engsel jendela = 10
grendel = 10
hak = 10
tarikan = 5
engsel pintu = 3
konci = 1
grendel = 2
tarikan = 1
KOLOM
Kp = 12 bh
K1 = 2 bh
KP = 12
Beton = 0.12 x 0.12 x 4.5 x
= 0.12 x 0.12 x 2.15 x
K1 = 2
Beton = 0.15 x 0.25 x 3.6 x
Begisting = 0.8 x 3.6 x 2
besi dia 14 = 6x 3.6 x 1.21 =
Bubungan = 9
Lisplang = 9x 2= 18 M'
18 x 2= 36 M'
54 M'
4.13 M3
2.41 M3
1.88 M3
8.41 M3
0.83 M3
0.48 M3
0.38 M3
1.68 M3
0.65 M3
89.39 kg
45.83 kg
4.2 M2
5= 0.16 M3
= 3.25 M2
= 2.24 M2
= 5.18 M2
= 3.60 M2
8.78 M2
1.935 M2
1= 0.04 M3
= 1.72 M2
= 1.29 M2
= 3.44 M2
4.73 M2
1.763 M2
1= 0.12 M2
2= 0.01 M3
1.00 = 0.36 M2
= 142.875 M2
2= 10.75 M2
153.63 M2
12 = 0.78 M3
3= 0.09 M3
= 12.96 M2
= 1.55 M2
14.51 M2
11.10 kg
15.91 kg
27.00 kg
0.39 = 59.66 kg
0.39 = 7.46 kg
67.11 kg
2= 0.27 M3
= 5.76
26.10 kg
0.39 = 11.74 kg
= 1.36 M3
= 306.62 kg
= 68.75 kg
1.03 M3
8.60 M2
1.40 M2
0.56 M2
10.55 M2
148.14 kg
ANALISA HARGA SATUAN PEKERJAAN
238,250
41,250
5,434,695
2,712,039
KODE
NO JENIS PEKERJAAN VOLUME SATUAN
ANALISA
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembersihan lapangan A1 42.00 M2
2 Pek. Pengukuran dan Pemasangan Bowplank A2 - M'
KERJAAN TANAH
II & PONDASI BATUKALI
1 Pek. Galian tanah Analisa B.2 25.52 M3
2 pek.Pondasi Batu kali Analisa C.1 7.83 M3
3 Pek. Urugan tanah kembali Analisa B.7 5.22 M3
HARGA
JUMLAH
SATUAN HARGA
( Rp )
( Rp )
6 7
8,500.00 357,000.00
78,485.00 2,472,277.50
Jumlah 2,829,277.50
76,500.00 1,952,280.00
624,500.00 4,889,835.00
24,055.00 125,567.10
PEKERJAAN : BELANJA MODAL PENGADAAN KONTRUKSI / PEMBELIAN GEDUNG KANTOR
SATUAN KERJA : BADAN KOORDINASI KELUARGA BERENCANA DAN PEMBERDAYAAN PEREM
PEKERJAAN : PEMBANGUNAN GEDUNG BALAI PENYULUHAN KELUARGA BERENCANA (KB
LOKASI : KOTA BANDAR LAMPUNG
TH. ANGGARAN : 2018
HARGA
No. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp)
I. PEKERJAAN PERSIAPAN
1 Pas. Papan nama proyek Ls 1.00 Unit 250,000.00
2 Pembersihan Lapangan Ls 84.00 M2 5,000.00
3 Pengukuran dan pasang Bouplank Analisa A.1 17.50 M' 63,100.00
4 Sewa Direksikeet Ls 1.00 Unit 1,500,000.00
5 Penyediaan Air dan listrik kerja semen Ls 1.00 Ls 1,000,000.00
6 Mobilisasi dan Demobilisasi (tenaga, al Ls 1.00 Ls 1,000,000.00
7 Pelaporan dan Dokumentasi proyek Ls 1.00 Ls 1,000,000.00
JUMLAH
II. PEKERJAAN TANAH DAN PONDASI
1 Galian tanah pondasi Analisa B.1 12.30 M3 62,500.00
2 Urugan pasir bawah pondasi/lantai Analisa B.5 5.72 M3 176,500.00
3 Pas. Pondasi batu belah adk. 1Pc : 4 Analisa C.1 7.40 M3 728,927.60
4 Urugan tanah sisi pondasi & dibawah lAnalisa B.6 2.30 M3 139,909.20
JUMLAH
III. PEKERJAAN BETON BERTULANG ADK 1:2:3
1 Pek. Sloof Beton Bertulang (200 Kg beAnalisa G.10 0.91 M3 5,807,254.88
2 Pek. kolom praktis Beton Bertulang (1Analisa G.16 9.21 M1 86,368.83
3 Pek. Ringbalk Beton Bertulang (10/15Analisa G.17 9.30 M1 117,067.47
4 Pek. Plat Beton Teras, 7 cm (150 kg +Analisa G.13 0.56 M3 6,375,594.88
5 Pek. Plat Suncreen, 7 cm (150 kg + beAnalisa G.13 0.26 M3 6,375,594.88
JUMLAH
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding bata adk. 1Pc : 4Ps Analisa D.3 110.30 M2 80,868.75
2 Pek. Plesteran Dinding 1 : 5 + Acian Analisa E.2 220.60 M2 53,262.00
JUMLAH
V. PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pek. Kusen Jalusi, pintu dan Jendela kAnalisa F.2 0.67 M3 6,688,750.00
2 Pek. Daun Pintu Panel, kayu kls. II Analisa F.3 5.73 M2 581,000.00
3 Pas. Daun pintu fiber Km/Wc (Lengka Ls 1.00 Unit 750,000.00
4 Pek. Daun Jendela + Kaca Polos 5m Analisa F.5 3.31 M2 429,200.00
5 Pek. Kaca Mati Polos 5mm Analisa L.7 2.88 M2 160,175.00
6 Pas. Jendela teralis besi dia- 10 mm Analisa K.6 3.52 M2 482,001.40
JUMLAH
VI PEKERJAAN KUDA-KUDA ATAP
1 Pek. Kuda-Kuda dan Rangka Atap ZinAnalisa K.8 100.30 M2 186,107.25
2 Pek. Atap Genteng Metal Analisa H.1 100.30 M2 87,660.00
3 Pek. Bubungan Nok Genteng Metal Analisa H.2 27.80 M' 39,180.00
4 Pek. Lisplank ukuran 3/20 cm, Kayu KeAnalisa F.15 54.00 M' 72,240.00
JUMLAH
VII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond (60x60) cm, Kayu Analisa F.14 98.70 M2 90,040.00
2 Pek. Plafond triplek t = 3 mm Analisa I.2 98.70 M2 38,390.00
3 Pek. List plafond kayu profil Analisa I.4 53.00 M' 16,395.00
JUMLAH
VIII. PEKERJAAN LANTAI
1 Pas. Lantai keramik 30/30 cm Analisa M.2 53.00 M2 174,395.75
2 Pas. Keramik Lantai 20/20 Km/Wc Analisa M.3 5.20 M2 194,891.25
3 Pas. Lantai rabat beton, adk. 1Pc:3PsAnalisa G.18 3.00 M3 1,159,139.00
JUMLAH
IX. PEKERJAAN KUNCI & PENGGANTUNG
1 Pas. Kunci pintu tanam 2 x putar Analisa L.1 3.00 Bh 418,700.00
2 Pas. Engsel pintu tipe H (3 bh/daun) Analisa L.3 12.00 Bh 42,180.00
3 Pas. Engsel jendela tipe H (3 bh/daun Analisa L.4 8.00 Bh 36,450.00
4 Pas. Grendel tanam expenolite u/pint Ls 2.00 Bh 50,000.00
5 Pas. Grendel jendela (2 bh/daun) Analisa L.5 8.00 Bh 27,175.00
6 Pas. Tarikan daun jendela (1 bh/daun) Ls 4.00 Bh 10,000.00
7 Pas. Hak angin daun jendela (2 bh/da Analisa L.6 8.00 Bh 24,675.00
JUMLAH
HARGA
No. URAIAN PEKERJAAN VOLUME SATUAN
(Rp)
ANSORI ABUHASAN, SH
NIP. 19581005 198603 1 013
REKAPITULASI TOTAL :
TERBILANG :
SERATUS SEMBILAN PULUH DELAPAN JUTA ENAM RATUS DELAPAN R
0
0
MBELIAN GEDUNG KANTOR
AN PEMBERDAYAAN PEREMPUAN
KELUARGA BERENCANA (KB) KECAMATAN
JUMLAH
HARGA
(Rp)
1.00 250,000.00
84.00 420,000.00
17.50 1,104,250.00
1.00 1,500,000.00
1.00 1,000,000.00
1.00 1,000,000.00
1.00 1,000,000.00
6,274,250.00
12.30 768,750.00
5.72 1,009,580.00
7.40 5,394,064.24
2.30 321,791.16
7,494,185.40
0.91 5,284,601.94
9.21 795,456.92
9.30 1,088,727.47
0.56 3,570,333.13
0.26 1,676,271.41
12,415,390.87
110.30 8,919,823.13
220.60 11,749,597.20
20,669,420.33
0.67 4,481,462.50
5.73 3,329,130.00
1.00 750,000.00
3.31 1,421,510.40
2.88 461,304.00
3.52 1,696,644.93
12,140,051.83
100.30 18,666,557.18
100.30 8,792,298.00
27.80 1,089,204.00
54.00 3,900,960.00
32,449,019.18
98.70 8,886,948.00
98.70 3,789,093.00
53.00 868,935.00
13,544,976.00
53.00 9,242,974.75
5.20 1,013,434.50
3.00 3,477,417.00
13,733,826.25
3.00 1,256,100.00
12.00 506,160.00
8.00 291,600.00
2.00 100,000.00
8.00 217,400.00
4.00 40,000.00
8.00 197,400.00
2,608,660.00
JUMLAH
HARGA
(Rp)
10.00 2,767,200.00
6.00 252,000.00
5.00 201,250.00
2.00 135,440.00
2.00 133,440.00
2.00 152,440.00
1.00 150,000.00
3,791,770.00
5.00 85,850.00
3.20 218,624.00
2.60 119,197.00
1.00 25,000.00
1.00 569,362.50
1.00 50,000.00
1.00 704,200.00
1.00 2,500,000.00
38.00 4,551,277.10
8,823,510.60
253.05 5,257,789.79
107.00 2,223,246.00
32.68 849,974.12
3.89 107,753.00
8,438,762.91
1.00 1,000,000.00
1.00 3,410,000.00
1.00 3,715,000.00
2.00 6,200,000.00
1.00 1,870,000.00
8.00 4,304,000.00
3.00 1,650,000.00
3.00 2,550,000.00
1.00 500,000.00
1.00 1,500,000.00
1.00 9,240,000.00
1.00 1,380,000.00
1.00 850,000.00
38,169,000.00
Dibuat Oleh
Kontraktor Pelaksana
CV. HUTAMA DWI KARYA
0
0