Pek Pembersihan Lapangan = p x l

= 7 x 6
= 42 m

Pondasi = 14 + 12 = 26 M'
4 + 6.25 = 10.25 M'
36.25 M'

Galian tanah pondasi = 0.8 x 0.75 x 36.25


Pasir urug = 0.8 x 0.05 x 36.25
Batu kosong = 0.8 x 0.1 x 36.25
Batu belah = 0.425 x 0.6 x 36.25
Timbunan kembali = 21.75 - 13.59

Urugan tanah peninggian lantai = 2.75 x 6x 0.25 =


= 2.75 x 3.5 x 0.25 =
= 1.5 x 5x 0.25 =

Urugan pasir bawah lantai = 2.75 x 6x 0.05 =


= 2.75 x 3.5 x 0.05 =
= 1.5 x 5x 0.05 =

Sloof 12/15 = 36.25 M'


begisting = 0.3 x 36.25 = 10.875 M2
Beton = 0.12 x 0.15 x 36.25 =
Besi d1a 10 = 4x 36.25 x 0.62 =
Besi dia 8 - 150 = 242 x 0.48 x 0.39 =

J1 = 5 bh
P1 = 2 bh
P2 = 1.00 bh
BV = 1 bh

J= 5 bh
Luas Lubang = 0.6 x 1.4 x 5=
Kusen kayu kelas II = 0.06 x 0.12 x 4.32 x
Bingka jendela kayu kelas II = 1.3 x 0.5 x 5
Kaca Mati 5 mm = 0.38 x 1.18 x 5

cat kusen = 0.24 x 4.32 x 5


cat jendela = 0.2 x 3.6 x 5

Engsel jendela = 2x 5= 10 bh
Grendel jendela = 2x 5= 10 bh
Hak angin = 2x 5= 10 bh
Tarikan = 1x 5= 5 bh

P1 = 1 bh
Luas Lubang = 0.9 x 2.15 x 1=
Kusen kayu kelas II = 0.06 x 0.12 x 5.36 x
Daun pinti panel kayu kelas II = 0.82 x 2.1 x 1

cat kusen = 0.24 x 5.36 x 1


cat daun pintu = 0.82 x 2.1 x 2

Engsel pintu = 3x 1= 3 bh
konci = 1x 1= 1 bh
grendel = 2x 1= 2 bh
Tarikan = 1x 1= 1 bh

P2 = 1 bh
Luas Lubang = 0.82 x 2.15 x 1=

BV = 1 bh
Luas Lubang = 0.2 x 0.3 x 2x
Kusen kayu kelas II = 0.03 x 0.12 x 1x
Cat kusen = 0.18 x 1x 2x

REKAP
Luas Lubang = 8.018
Volume Kusen = 0.20
Daun pintu = 1.72
Daun jendela = 3.25
Kaca mati 5 mm = 2.24
cat kusen = 13.87

engsel jendela = 10
grendel = 10
hak = 10
tarikan = 5

engsel pintu = 3
konci = 1
grendel = 2
tarikan = 1

Pasangan Bata = 31.75 M'


Volume Bata = 4.5 x 31.75
= 0.5 x 2.15 x 5x

Luas lubang = 8.018

Volume bata = 153.63 - 8.018 = 145.61 M2

KOLOM
Kp = 12 bh
K1 = 2 bh

KP = 12
Beton = 0.12 x 0.12 x 4.5 x
= 0.12 x 0.12 x 2.15 x

begisting = 0.24 x 4.5 x 12


= 0.24 x 2.15 x 3

besi dia 10 = 4x 4.5 x 0.62 =


= 4x 6.45 x 0.62 =

besi dia 8-150 = 30 x 0.42 x 12 x


= 15 x 0.42 x 3x

K1 = 2
Beton = 0.15 x 0.25 x 3.6 x
Begisting = 0.8 x 3.6 x 2
besi dia 14 = 6x 3.6 x 1.21 =

besi dia 8-150 = 24 x 0.62 x 2 x

Ring Balk = 36.25 M'


Beton = 0.15 x 0.25 x 36.25
Besi dia 14 = 7x 36.25 x 1.21
besi dia 8-150 = 242 x 0.72 x 0.39
begisting = 0.5 x 36.25 = 18.125 M2

Atep baja ringan = 4x 9= 36 M2


= 5x 9= 45 M2
= 81 M2

Bubungan = 9

Lisplang = 9x 2= 18 M'
18 x 2= 36 M'
54 M'

Beton teras = 4.65 x 1.85 x 0.12 =

begisting = 4.65 x 1.85 =


0.15 x 9.3 x 1=
0.15 x 1.85 x 2=

besi 10 - 15 = 4.65 x 1.85 x 17.22 =

Keramik 30/30 = 2.75 x 3.5 = 9.625 M2


= 2.75 x 6= 16.5 M2
= 2.50 x 1.5 = 3.75 M2
29.875 M2

Keramik 20/20 = 1.50 x 1.5 = 2.25 M2

lis plafon gypsum = 36.25 x 2= 72.5 M'


= 7x 2= 14 M'
= 9x 2= 18 M'
104.50 M'
= 21.75 M3
= 1.45 M3
= 2.90 M3
= 9.24 M3
= 8.16 M3

4.13 M3
2.41 M3
1.88 M3
8.41 M3

0.83 M3
0.48 M3
0.38 M3
1.68 M3

0.65 M3
89.39 kg
45.83 kg

4.2 M2
5= 0.16 M3
= 3.25 M2
= 2.24 M2

= 5.18 M2
= 3.60 M2
8.78 M2

1.935 M2
1= 0.04 M3
= 1.72 M2

= 1.29 M2
= 3.44 M2
4.73 M2

1.763 M2

1= 0.12 M2
2= 0.01 M3
1.00 = 0.36 M2
= 142.875 M2
2= 10.75 M2
153.63 M2

12 = 0.78 M3
3= 0.09 M3

= 12.96 M2
= 1.55 M2
14.51 M2

11.10 kg
15.91 kg
27.00 kg

0.39 = 59.66 kg
0.39 = 7.46 kg
67.11 kg

2= 0.27 M3
= 5.76
26.10 kg

0.39 = 11.74 kg

= 1.36 M3
= 306.62 kg
= 68.75 kg

1.03 M3

8.60 M2
1.40 M2
0.56 M2
10.55 M2
148.14 kg
ANALISA HARGA SATUAN PEKERJAAN

NO Uraian satuan volume harga.sat jumlah


B-01 1 M3 Galian Tanah
- Pekerja oh 0.4 70,000 28,000
- Mandor oh 0.04 125,000 5000
Jumlah 33,000
1 M3 Urugan Pasir
- Pasir Urug m3 1.5 120,000 216,000
- Pekerja oh 0.3 70,000 21,000
- Mandor oh 0.01 125,000 1,250
Jumlah 238,250
1 M3 Pemadatan Tanah
- Pekerja oh 0.5 70,000 35,000
- Mandor oh 0.05 125,000 6,250
Jumlah 41,250
1 M3 Pasang Pondasi BT kali, 1 pc : 5 pa
- batu belah m3 12.96 195,000 2,527,200
- semen pc (50kg/zak) zak 28.944 60,000 1,736,640
- pasir pasang m3 5.832 165,000 962,280
- pekerja oh 1.5 100,000 150,000
- tukang batu oh 0.6 70,000 42,000
- kepala tukang oh 0.06 120,000 7,200
- mandor oh 0.075 125,000 9,375
jumlah 5,434,695
1 M3 AANSTAMPING
- batu belah m3 12.96 195,000 2,527,200
- Pasir Urug m3 5.832 12,000 69,984
- Pekerja oh 0.78 100,000 78,000
- tukang batu oh 0.39 70,000 27,300
- kepala tukang oh 0.039 120,000 4,680
- Mandor oh 0.039 125,000 4,875
jumlah 2,712,039
total
33,000

238,250

41,250

5,434,695

2,712,039
KODE
NO JENIS PEKERJAAN VOLUME SATUAN
ANALISA

1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembersihan lapangan A1 42.00 M2
2 Pek. Pengukuran dan Pemasangan Bowplank A2 - M'

KERJAAN TANAH
II & PONDASI BATUKALI
1 Pek. Galian tanah Analisa B.2 25.52 M3
2 pek.Pondasi Batu kali Analisa C.1 7.83 M3
3 Pek. Urugan tanah kembali Analisa B.7 5.22 M3
HARGA
JUMLAH
SATUAN HARGA
( Rp )
( Rp )
6 7

8,500.00 357,000.00
78,485.00 2,472,277.50
Jumlah 2,829,277.50

76,500.00 1,952,280.00
624,500.00 4,889,835.00
24,055.00 125,567.10
PEKERJAAN : BELANJA MODAL PENGADAAN KONTRUKSI / PEMBELIAN GEDUNG KANTOR
SATUAN KERJA : BADAN KOORDINASI KELUARGA BERENCANA DAN PEMBERDAYAAN PEREM
PEKERJAAN : PEMBANGUNAN GEDUNG BALAI PENYULUHAN KELUARGA BERENCANA (KB
LOKASI : KOTA BANDAR LAMPUNG
TH. ANGGARAN : 2018

HARGA
No. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp)

I. PEKERJAAN PERSIAPAN
1 Pas. Papan nama proyek Ls 1.00 Unit 250,000.00
2 Pembersihan Lapangan Ls 84.00 M2 5,000.00
3 Pengukuran dan pasang Bouplank Analisa A.1 17.50 M' 63,100.00
4 Sewa Direksikeet Ls 1.00 Unit 1,500,000.00
5 Penyediaan Air dan listrik kerja semen Ls 1.00 Ls 1,000,000.00
6 Mobilisasi dan Demobilisasi (tenaga, al Ls 1.00 Ls 1,000,000.00
7 Pelaporan dan Dokumentasi proyek Ls 1.00 Ls 1,000,000.00
JUMLAH
II. PEKERJAAN TANAH DAN PONDASI
1 Galian tanah pondasi Analisa B.1 12.30 M3 62,500.00
2 Urugan pasir bawah pondasi/lantai Analisa B.5 5.72 M3 176,500.00
3 Pas. Pondasi batu belah adk. 1Pc : 4 Analisa C.1 7.40 M3 728,927.60
4 Urugan tanah sisi pondasi & dibawah lAnalisa B.6 2.30 M3 139,909.20
JUMLAH
III. PEKERJAAN BETON BERTULANG ADK 1:2:3
1 Pek. Sloof Beton Bertulang (200 Kg beAnalisa G.10 0.91 M3 5,807,254.88
2 Pek. kolom praktis Beton Bertulang (1Analisa G.16 9.21 M1 86,368.83
3 Pek. Ringbalk Beton Bertulang (10/15Analisa G.17 9.30 M1 117,067.47
4 Pek. Plat Beton Teras, 7 cm (150 kg +Analisa G.13 0.56 M3 6,375,594.88
5 Pek. Plat Suncreen, 7 cm (150 kg + beAnalisa G.13 0.26 M3 6,375,594.88
JUMLAH
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding bata adk. 1Pc : 4Ps Analisa D.3 110.30 M2 80,868.75
2 Pek. Plesteran Dinding 1 : 5 + Acian Analisa E.2 220.60 M2 53,262.00
JUMLAH
V. PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pek. Kusen Jalusi, pintu dan Jendela kAnalisa F.2 0.67 M3 6,688,750.00
2 Pek. Daun Pintu Panel, kayu kls. II Analisa F.3 5.73 M2 581,000.00
3 Pas. Daun pintu fiber Km/Wc (Lengka Ls 1.00 Unit 750,000.00
4 Pek. Daun Jendela + Kaca Polos 5m Analisa F.5 3.31 M2 429,200.00
5 Pek. Kaca Mati Polos 5mm Analisa L.7 2.88 M2 160,175.00
6 Pas. Jendela teralis besi dia- 10 mm Analisa K.6 3.52 M2 482,001.40
JUMLAH
VI PEKERJAAN KUDA-KUDA ATAP
1 Pek. Kuda-Kuda dan Rangka Atap ZinAnalisa K.8 100.30 M2 186,107.25
2 Pek. Atap Genteng Metal Analisa H.1 100.30 M2 87,660.00
3 Pek. Bubungan Nok Genteng Metal Analisa H.2 27.80 M' 39,180.00
4 Pek. Lisplank ukuran 3/20 cm, Kayu KeAnalisa F.15 54.00 M' 72,240.00
JUMLAH
VII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond (60x60) cm, Kayu Analisa F.14 98.70 M2 90,040.00
2 Pek. Plafond triplek t = 3 mm Analisa I.2 98.70 M2 38,390.00
3 Pek. List plafond kayu profil Analisa I.4 53.00 M' 16,395.00
JUMLAH
VIII. PEKERJAAN LANTAI
1 Pas. Lantai keramik 30/30 cm Analisa M.2 53.00 M2 174,395.75
2 Pas. Keramik Lantai 20/20 Km/Wc Analisa M.3 5.20 M2 194,891.25
3 Pas. Lantai rabat beton, adk. 1Pc:3PsAnalisa G.18 3.00 M3 1,159,139.00
JUMLAH
IX. PEKERJAAN KUNCI & PENGGANTUNG
1 Pas. Kunci pintu tanam 2 x putar Analisa L.1 3.00 Bh 418,700.00
2 Pas. Engsel pintu tipe H (3 bh/daun) Analisa L.3 12.00 Bh 42,180.00
3 Pas. Engsel jendela tipe H (3 bh/daun Analisa L.4 8.00 Bh 36,450.00
4 Pas. Grendel tanam expenolite u/pint Ls 2.00 Bh 50,000.00
5 Pas. Grendel jendela (2 bh/daun) Analisa L.5 8.00 Bh 27,175.00
6 Pas. Tarikan daun jendela (1 bh/daun) Ls 4.00 Bh 10,000.00
7 Pas. Hak angin daun jendela (2 bh/da Analisa L.6 8.00 Bh 24,675.00
JUMLAH

HARGA
No. URAIAN PEKERJAAN VOLUME SATUAN
(Rp)

X. PEKERJAAN INSTALASI LISTRIK


1 Pas. Instalasi titik lampu, fitting da Analisa O.5 10.00 Ttk 276,720.00
2 Pas. Lampu SL 25 watt Ls 6.00 Bh 42,000.00
3 Pas. Lampu SL 18 watt Ls 5.00 Bh 40,250.00
4 Pas. Stop kontak Analisa O.4 2.00 Bh 67,720.00
5 Pas. Saklar Single Analisa O.3 2.00 Bh 66,720.00
6 Pas. Saklar Double Analisa O.2 2.00 Bh 76,220.00
7 Pas. Box zekering Ls 1.00 Bh 150,000.00
JUMLAH
XI. PEKERJAAN INSTALASI AIR BERSIH, KOTOR
1 Pas. Pipa distribusi air bersih PVC 3/ Analisa J.7 5.00 M1 17,170.00
2 Pas. Pipa kesepticktank PVC 4" AW Analisa J.9 3.20 M1 68,320.00
3 Pas. Pipa air kotor PVC 3" AW Analisa J.12 2.60 M1 45,845.00
4 Pas. Kran air bersih dia 3/4" Ls 1.00 Bh 25,000.00
5 Pas. Closet jongkok (Porselin) Analisa J.2 1.00 Bh 569,362.50
6 Pas. Floor drain model siphon Ls 1.00 Bh 50,000.00
7 Pas. Bak fiber km/wc Analisa J.4 1.00 Bh 704,200.00
8 Pas. Tangki septictank lengkap deng Ls 1.00 Unit 2,500,000.00
9 Pas. Saluran air hujan dari pasangan Analisa D.5 38.00 M' 119,770.45
JUMLAH
XII. PEKERJAAN PENGECATAN
1 Pek. Cat tembok untuk dinding Analisa N.3 253.05 M2 20,778.00
2 Pek. Cat tembok untuk plafond Analisa N.3 107.00 M2 20,778.00
3 Pek. Cat kayu untuk kusen, Pintu, JenAnalisa N.2 32.68 M2 26,009.00
4 Pek. Cat besi untuk teralis jendela Analisa N.1 3.89 M2 27,700.00
JUMLAH
XIII. PEKERJAAN MEUBELAIR
1 Meja 1/2 Biro, setara kayu klas II (uk. Ls 1.00 Bh 1,000,000.00
2 Meja rapat, setara kayu klas II @ 6 kur Ls 1.00 Set 3,410,000.00
3 Almari, setara kayu klas II daun pintu Ls 1.00 Set 3,715,000.00
4 Rak, setara kayu klas II tanpa daun p Ls 2.00 Set 3,100,000.00
5 Kursi kerja (roda) berlengan, oscar ( Ls 1.00 Bh 1,870,000.00
6 Kursi hadap/lipat, pipa oval (nikel chr Ls 8.00 Bh 538,000.00
7 Exhaust fan Uk.25" Ls 3.00 Bh 550,000.00
8 Kipas angin type gantung Ls 3.00 Bh 850,000.00
9 White Board (uk. 1,2x1,4 m, list alu Ls 1.00 Bh 500,000.00
10 Papan Nama Balai Penyuluhan KB (uk Ls 1.00 Bh 1,500,000.00
11 Pengadaan Generator Set 5 KVA Ls 1.00 Bh 9,240,000.00
12 Pengadaan dan Pemasangan Pompa Air Ls 1.00 Bh 1,380,000.00
13 Tempat sampah fiberglass, 2 roda kare Ls 1.00 Bh 850,000.00
JUMLAH

Mengetahui/Menyetujui Diperiksa Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN Pengawas Teknik Lapangan Dinas PU Kota Bandar Lampung
ALOKASI KHUSUS(DAK) BIDANG KELUARGA BERENCANA

ANSORI ABUHASAN, SH
NIP. 19581005 198603 1 013

REKAPITULASI TOTAL :

SATUAN KERJA : BADAN KOORDINASI KELUARGA BERENCANA DAN PEMBERDAYAAN


PEKERJAAN : PEMBANGUNAN GEDUNG BALAI PENYULUHAN KELUARGA BERENCA
LOKASI : KOTA BANDAR LAMPUNG
TH. ANGGARAN : 2018

I. PEKERJAAN PERSIAPAN Rp. 6,274,250.00


II. PEKERJAAN TANAH DAN PONDASI Rp. 7,494,185.40
III. PEKERJAAN BETON BERTULANG ADK 1:2:3 Rp. 12,415,390.87
IV. PEKERJAAN PASANGAN DAN PLESTERAN Rp. 20,669,420.33
V. PEKERJAAN KUSEN, PINTU DAN JENDELA Rp. 12,140,051.83
VI. PEKERJAAN KUDA-KUDA ATAP Rp. 32,449,019.18
VII. PEKERJAAN PLAFOND Rp. 13,544,976.00
VIII. PEKERJAAN LANTAI Rp. 13,733,826.25
IX. PEKERJAAN KUNCI & PENGGANTUNG Rp. 2,608,660.00
X. PEKERJAAN INSTALASI LISTRIK Rp. 3,791,770.00
XI. PEKERJAAN INSTALASI AIR BERSIH, KOTOR Rp. 8,823,510.60
XII. PEKERJAAN PENGECATAN Rp. 8,438,762.91
XIII. PEKERJAAN MEUBELAIR Rp. 38,169,000.00

J U M LAH Rp. 180,552,823.36


PPN 10 % Rp. 18,055,282.34

J U M LAH Rp. 198,608,105.70


DIBULATKAN Rp. 198,608,000.00

TERBILANG :
SERATUS SEMBILAN PULUH DELAPAN JUTA ENAM RATUS DELAPAN R

BANDAR LAMPUNG, JULI 2018


0

0
0
MBELIAN GEDUNG KANTOR
AN PEMBERDAYAAN PEREMPUAN
KELUARGA BERENCANA (KB) KECAMATAN

JUMLAH
HARGA
(Rp)

1.00 250,000.00
84.00 420,000.00
17.50 1,104,250.00
1.00 1,500,000.00
1.00 1,000,000.00
1.00 1,000,000.00
1.00 1,000,000.00
6,274,250.00

12.30 768,750.00
5.72 1,009,580.00
7.40 5,394,064.24
2.30 321,791.16
7,494,185.40

0.91 5,284,601.94
9.21 795,456.92
9.30 1,088,727.47
0.56 3,570,333.13
0.26 1,676,271.41
12,415,390.87

110.30 8,919,823.13
220.60 11,749,597.20
20,669,420.33

0.67 4,481,462.50
5.73 3,329,130.00
1.00 750,000.00
3.31 1,421,510.40
2.88 461,304.00
3.52 1,696,644.93
12,140,051.83

100.30 18,666,557.18
100.30 8,792,298.00
27.80 1,089,204.00
54.00 3,900,960.00
32,449,019.18

98.70 8,886,948.00
98.70 3,789,093.00
53.00 868,935.00
13,544,976.00

53.00 9,242,974.75
5.20 1,013,434.50
3.00 3,477,417.00
13,733,826.25

3.00 1,256,100.00
12.00 506,160.00
8.00 291,600.00
2.00 100,000.00
8.00 217,400.00
4.00 40,000.00
8.00 197,400.00
2,608,660.00

JUMLAH
HARGA
(Rp)

10.00 2,767,200.00
6.00 252,000.00
5.00 201,250.00
2.00 135,440.00
2.00 133,440.00
2.00 152,440.00
1.00 150,000.00
3,791,770.00

5.00 85,850.00
3.20 218,624.00
2.60 119,197.00
1.00 25,000.00
1.00 569,362.50
1.00 50,000.00
1.00 704,200.00
1.00 2,500,000.00
38.00 4,551,277.10
8,823,510.60

253.05 5,257,789.79
107.00 2,223,246.00
32.68 849,974.12
3.89 107,753.00
8,438,762.91

1.00 1,000,000.00
1.00 3,410,000.00
1.00 3,715,000.00
2.00 6,200,000.00
1.00 1,870,000.00
8.00 4,304,000.00
3.00 1,650,000.00
3.00 2,550,000.00
1.00 500,000.00
1.00 1,500,000.00
1.00 9,240,000.00
1.00 1,380,000.00
1.00 850,000.00
38,169,000.00

Dibuat Oleh
Kontraktor Pelaksana
CV. HUTAMA DWI KARYA

NA DAN PEMBERDAYAAN PEREMPUAN


HAN KELUARGA BERENCANA (KB) KECAMATAN
ENAM RATUS DELAPAN RIBU RUPIAH

LAMPUNG, JULI 2018


0