You are on page 1of 1

Proyek : Control Building SCBD

Judul : Monitoring Shop Drawing Precast Panel Tampak Barat


Tanggal : 13 November 2019
Update : 02
Dibuat : Sonia

Luas PrecastBerat Precast Lantai Total Precast Total Luas Bentuk Sub. Dwg Status Dwg Sub. Dwg Status Dwg Sub. Dwg Status Dwg Sub. Dwg Status Dwg Sub. Dwg Status Dwg Sub. Dwg Status Dwg
No. Tipe Precast Keterangan
(m²) (Ton) Mezz. 2 3 4 5 6 7 8 9 10 11 12 Atap (Pcs) (m²) Precast Ke 1 Ke 1 Ke 2 Ke 2 Ke 3 Ke 3 Ke 4 Ke 4 Ke 5 Ke 5 Ke 6 Ke 6

Tampak Barat
1 CBB-MAC (CONDUIT & EMBODUS) 4.84 1.16 6 6 29.06 U (Dua Siku) 27/09/2019 approved as noted (30/09/19) 04/10/2019 approved as noted (09/10/19)
2 CBB-MA 4.84 1.16 2 2 9.69 U (Dua Siku) 03/09/2019 approved as noted (06/09/19) 27/09/2019 approved as noted (30/09/19)
3 CBB-MB 14.81 3.55 1 1 14.81 L (Satu Siku) 04/09/2019 approved as noted (06/09/19) 27/09/2019 direvisi (30/09/19) 02/10/2019 approved as noted (04/10/19) 04/10/2019 approved as noted (09/10/19) 18/10/2019 approved as noted (25/10/19) 05/11/2019 approved as noted (11/11/19) panel sudah diproduksi, butuh Site Instruction untuk repair panel (perubahan desain by Owner). Lihat Gambar Tampak tanggal 09 Oktober 2019 dan tanggal 01 November 2019
4 CBB-MC 8.58 2.06 1 1 8.58 Flat 04/09/2019 approved as noted (06/09/19) 27/09/2019 approved as noted (30/09/19) 02/10/2019 approved as noted (04/10/19) 04/10/2019 approved as noted (09/10/19)
5 CBB-MD 12.38 2.97 1 1 12.38 L (Tiga Siku) 01/11/2019 direvisi (04/11/19) 05/11/2019 approved as noted (11/11/19)
6 CBB-2A 14.93 3.58 1 1 14.93 Flat 09/09/2019 approved as noted (11/09/19) 02/10/2019 approved as noted (07/10/19)
7 CBB-2B 8.79 2.11 0 0 0.00 L (Satu Siku) 09/09/2019 approved as noted (11/09/19) 04/10/2019 approved as noted (09/10/19) panel sudah diproduksi, butuh Site Instruction karena volume panel hilang/terbuang (perubahan desain by Owner). Lihat Gambar Tampak tanggal 09 Oktober 2019 dan tanggal 01 November 2019
8 CBB-2BB 14.36 3.45 1 1 14.36 L (Satu Siku) 04/10/2019 approved as noted (09/10/19) 18/10/2019 direvisi (25/10/19) 23/10/2019 gambar dikembalikan, tunggu desain 12/11/2019 panel sudah diproduksi, butuh Site Instruction untuk repair panel (perubahan desain by Owner). Lihat Gambar Tampak tanggal 09 Oktober 2019 dan tanggal 01 November 2019
9 CBB-2BA 14.36 3.45 1 1 14.36 L (Satu Siku) 09/09/2019 approved as noted (11/09/19) 27/09/2019 approved as noted (30/09/19) 02/10/2019 approved as noted (07/10/19) 18/10/2019 direvisi (25/10/19) 23/10/2019 gambar dikembalikan, tunggu desain 12/11/2019 panel sudah diproduksi, butuh Site Instruction untuk repair panel (perubahan desain by Owner). Lihat Gambar Tampak tanggal 09 Oktober 2019 dan tanggal 01 November 2019
10 CBB-2C 7.73 1.85 5 5 38.64 U (Dua Siku) 09/09/2019 approved as noted (11/09/19) 02/10/2019 approved as noted (07/10/19)
11 CBB-2D 8.43 2.02 3 3 25.28 U (Dua Siku) 09/09/2019 approved as noted (11/09/19) 02/10/2019 approved as noted (07/10/19)
12 CBB-2E 12.22 2.93 1 1 12.22 L (Satu Siku) 01/11/2019 approved as noted (04/11/19)
13 CBB-2F 12.22 2.93 1 1 12.22 L (Satu Siku) 01/11/2019 approved as noted (04/11/19)
14 CBB-3A 7.00 1.68 2 2 14.00 U (Dua Siku) 04/09/2019 approved as noted (11/09/19)
15 CBB-3AC (CONDUIT & EMBODUS) 7.00 1.68 5 5 35.00 U (Dua Siku) 18/10/2019 approved as noted (25/10/19)
16 CBB-3ACC (CONDUIT & EMBODUS) 7.00 1.68 1 1 7.00 U (Dua Siku) 18/10/2019 approved as noted (25/10/19) 01/11/2019 gambarnya belum kembali 12/11/2019
17 CBB-3B 11.93 2.86 1 1 11.93 L (Satu Siku) 04/09/2019 approved as noted (11/09/19) 04/10/2019 approved as noted (09/10/19) 09/10/2019 approved as noted (10/10/19) 12/11/2019 butuh SI karena bagian bottom panel harus direpair dibuat spigot (bertemu dengan CBB-2BA). Lihat Gambar Tampak tanggal 09 Oktober 2019 dan tanggal 01 November 2019
18 CBB-3C 11.93 2.86 1 1 11.93 L (Satu Siku) 04/09/2019 approved as noted (11/09/19) 04/10/2019 approved as noted (09/10/19) 09/10/2019 approved as noted (10/10/19) 12/11/2019 butuh SI karena bagian bottom panel harus direpair dibuat spigot (bertemu dengan CBB-2BB). Lihat Gambar Tampak tanggal 09 Oktober 2019 dan tanggal 01 November 2019
19 CBB-3E 12.40 2.98 1 1 12.40 Flat 04/09/2019 approved as noted (11/09/19) 04/10/2019 approved as noted (09/10/19) 09/10/2019 approved as noted (10/10/19)
20 CBB-3F 10.15 2.44 6 6 60.90 L (Satu Siku) 04/09/2019 approved as noted (11/09/19) 04/10/2019 approved as noted (09/10/19) 09/10/2019 approved as noted (10/10/19)
21 CBB-3G 10.15 2.44 6 6 60.90 L (Satu Siku) 04/09/2019 approved as noted (11/09/19) 04/10/2019 approved as noted (09/10/19) 09/10/2019 approved as noted (10/10/19)
22 CBB-3J 10.15 2.44 1 1 10.15 L (Satu Siku) 01/11/2019 approved as noted (04/11/19)
23 CBB-3K 10.15 2.44 1 1 10.15 L (Satu Siku) 01/11/2019 approved as noted (04/11/19)
24 CBB-4A 6.97 1.67 2 2 13.94 U (Dua Siku) 19/09/2019 approved as noted (30/09/19)
25 CBB-4H (CONDUIT & EMBODUS) 6.97 1.67 6 6 41.83 U (Dua Siku) 19/09/2019 approved as noted (30/09/19)
26 CBB-4B 11.88 2.85 1 1 11.88 L (Satu Siku) 19/09/2019 approved as noted (30/09/19) 09/10/2019 approved as noted (10/10/19)
27 CBB-4C 11.88 2.85 1 1 11.88 L (Satu Siku) 19/09/2019 approved as noted (30/09/19) 09/10/2019 approved as noted (10/10/19)
28 CBB-4E 12.35 2.96 1 1 12.35 Flat 19/09/2019 approved as noted (30/09/19) 11/10/2019 approved as noted (28/10/19)
29 CBB-4F 10.11 2.43 7 7 70.77 L (Satu Siku) 19/09/2019 approved as noted (30/09/19) 09/10/2019 approved as noted (10/10/19)
30 CBB-4G 10.11 2.43 7 7 70.77 L (Satu Siku) 19/09/2019 approved as noted (30/09/19) 09/10/2019 approved as noted (10/10/19)
31 CBB-5A 7.00 1.68 2 2 2 2 2 2 2 14 98.00 U (Dua Siku) 10/10/2019 direvisi (25/10/19) 18/10/2019 approved as noted (25/10/19)
32 CBB-5AC (CONDUIT & EMBODUS) 7.00 1.68 6 6 6 6 6 6 6 42 294.00 U (Dua Siku) 18/10/2019 approved as noted (25/10/19)
33 CBB-5B 11.93 2.86 1 1 1 1 1 1 1 7 83.48 L (Satu Siku) 11/10/2019 approved as noted (28/10/19)
34 CBB-5C 11.93 2.86 1 1 1 1 1 1 1 7 83.48 L (Satu Siku) 11/10/2019 approved as noted (28/10/19)
35 CBB-5E 12.40 2.98 1 1 1 1 1 1 1 7 86.80 Flat 11/10/2019 approved as noted (28/10/19)
36 CBB-5F 10.15 2.44 7 1 1 1 1 1 1 13 131.95 L (Satu Siku) 11/10/2019 approved as noted (28/10/19)
37 CBB-5G 10.15 2.44 7 1 1 1 1 1 1 13 131.95 L (Satu Siku) 11/10/2019 approved as noted (28/10/19)
38 CBB-6A 9.15 2.20 6 6 6 6 6 6 36 329.49 L (Satu Siku) 09/10/2019 approved as noted (10/10/19)
39 CBB-6B 9.15 2.20 6 6 6 6 6 6 36 329.49 L (Satu Siku) 09/10/2019 approved as noted (10/10/19)
40 CBB-12A 10.29 2.47 6 6 61.74 L (Satu Siku) 22/10/2019 direvisi (25/10/19)
41 CBB-12B 10.29 2.47 6 6 61.74 L (Satu Siku) 22/10/2019 direvisi (25/10/19)
42 CBB-12H 7.70 1.85 2 2 15.40 U (Dua Siku) 05/11/2019 approved as noted (11/11/19)
43 CBB-12AC (CONDUIT & EMBODUS) 7.70 1.85 6 6 46.20 U (Dua Siku) 05/11/2019 approved as noted (11/11/19)
44 CBB-12D 13.26 3.18 1 1 13.26 L (Satu Siku) 22/10/2019 direvisi (25/10/19)
45 CBB-12E 13.26 3.18 1 1 13.26 L (Satu Siku) 22/10/2019 direvisi (25/10/19)
46 CBB-12F 11.29 2.71 1 1 11.29 L (Satu Siku)
47 CBB-12G 11.29 2.71 1 1 11.29 L (Satu Siku) 22/10/2019 direvisi (25/10/19)
48 CBB-12J 13.64 3.27 1 1 13.64 Flat 05/11/2019 approved as noted (11/11/19)
49 CBB-RA 11.88 2.85 1 1 11.88 Flat 22/10/2019 gbr dikembalikan (rev. desain) 05/11/2019 approved as noted (11/11/19)
Total Precast Panel 11 13 25 25 25 25 25 25 25 25 25 25 1 275 2502.60