DELAY INFORMATION
Labor Equipment Management
C) Occurence 2 4 2
D) Total added time 4080 7260 6540
E) Probability of occurence* 0.03 0.07 0.03
F) Relative Severity** 0.42 0.38 0.68
G) Expected % delay time per production*** 1.41 2.51 2.26
MPDM Processing
production unit : PEKERJAAN PENGECORAN PILAR 2
Method : Example :
Total Production Production Mean cycle Σ(I(cycle Time) -
unit
cycle times cycle times (Non-Delay Cycle time)I)/n
A) Non delayed Production Cycle
356500 82 4348
DELAY INFORMATION
Labor Equipment Management
C) Occurence 4 9 2
D) Total added time 7200 18660 2400
E) Probability of occurence* 0.04 0.09 0.02
F) Relative Severity** 0.38 0.44 0.26
G) Expected % delay time per production*** 1.57 4.06 0.52
100%
100%
1. 1. Actual Overall Productivity
a. Pekerjaan Pengecoran borepile di pilar 1
MPDM PROCESSING
Actual Overall
Productivity (titik/hari)
5.96
MPDM PROCESSING
Actual Overall
Productivity (titik/hari)
6.15
2. Ideal Productivity
a. Pekerjaan Pengecoran borepile di pilar 1
MPDM PROCESSING
Actual Overall
Productivity (titik/hari)
6.99
Actual Overall
Productivity (titik/hari)
6.62
OLAH DATA MENGGUNAKAN PRODUCTION
CYCLES DELAY SAMPLING
FORM PENGAMATAN
PEKERJAAN BOREPILE NO : 1 Sd 8
JENIS PEKERJAAN : PENGECORAN PILAR 1
FORM PENGAMATAN
PEKERJAAN BOREPILE NO : 1 Sd 8
JENIS PEKERJAAN : PENGECORAN PILAR 2
PENGECORAN PILAR 1
overall
Total Production
Production Cycles Mean Cycle Times
Cycle Time PILAR 1
289720 60 4829
Actual Overall
Productivity (truck/titik)
5.96
ideal
Total Production
Production Cycles Mean Cycle Times
Cycle Time PILAR 1
214360 52 4122
Actual Overall
Productivity (truck/titik)
6.99
pilar 1
Delay for labor Delay for equipment Delay for Management
4080 7260 6540
pilar 2
Delay for labor Delay for equipment Delay for Management
7200 18660 2400
WAKTU RATA-RATA (STANDAR DARI KONTRAKTOR & KONSULTAN
WAKTU KENDARAAN BERANGKAT DAN TIBA 12:45:00 AM 2700
WAKTU PENGECORAN 12:33:56 AM 2040
waktu pemotongan pipa tremi 12:15:00 AM 900
waktu parkir dan pembersihan 12:07:00 AM 420
diambil keseluruhan utk 8 truck (7 mnt kali 14 truck) 1320
PENGECORAN PILAR 2
Total Production
Production Cycles
Cycle Time PILAR 2
459160 98
Actual Overall
Productivity (truck/titik)
6.15 logis
6 DIBULATKAN
Total Production
Production Cycles
Cycle Time PILAR 2
356500 82
Actual Overall
Productivity (truck/hari)
6.62 logis
7 DIBULATKAN
2370 2280
1050 1140
4685
4348
Labor Equipment Management
9
2 4 2
4 9 2
4 4
Labor Equipm
9
PILAR 1
PILAR 2
4 4
2 22