You are on page 1of 1

 Responsible for undertaking hull inspection according to class requirements for royal navy ships.

 Preparation of Survey reports / Hull-work package with appropriate remedial recommendation &
estimation and preparation of shell-drawings where necessary.
 To produce CAR (Corrective Action Report) ,NCR (Nonconformity Report) and PAR (Preventive
Action Report).
 Observes testing of tanks, decks and compartments for strength of material and water-tightness.
 Keep the contact with QA/QC department, owner and class surveyors.
 Record inspection data.

You might also like